You are on page 1of 92

King Shaka International Airport

ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
NOTES TO TENDERERS
1 NAMES OF PARTIES

Employer: ACSA

Principal agent: Rubiquant

Architects: DGIT Glam

Quantity surveyors: Rubiquant

Consulting civil & structural engineers: Hokmah

Consulting electrical engineers: DNA

Consulting mechanical engineers: Bingelela

2 CONDITIONS OF CONTRACT

The attention of the tenderer is SPECIFICALLY drawn


to the conditions of contract in use. Tenderers are
requested to study the conditions of contract for the full
extent and meaning of each and every clause as set
out in Section 1 - Preliminaries of the Bills of
Quantities.

Carried Forward R
Notes to Tenderers

-1-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

3 BILLS OF QUANTITIES

The pages contained in this Bills of Quantities are


numbered consecutively from page 9 to 92.
Tenderers are requested to check the Bills of
Quantities and if any page is missing or duplicated,
or if any figure or text is illegible, or if there exists
any uncertainty or doubt as to the meaning of any
description, or if this Bills of Quantities
contains any obvious error, Tenderers must notify
the Quantity Surveyor immediately so as to obtain
the necessary rectification or explanation.
No liability whatsoever with regard to the tender
amount will be recognized as a result of the
aforementioned.

No alterations, erasure, omission or addition is


allowed to be made to the text or conditions
pertained to in this Bills of Quantities.
If any such alterations, amendment, note or
addition is made, it will not be recognized and
the Bills of Quantities will be deemed as orginally
drawn up by the Quantity Surveyor.

This Bills of Quantities is not meant for ordering.


Any orders based on the Bills of Quantities are at
the contractor's own risk.

4 METHOD OF MEASUREMENT

This Bills of Quantities was compiled in accordance


with the method and guidelines as set out in the sixth
edition of the Standard System of Measuring Builder's
Work and/or any amendments thereof. Where
applicable the engineering work is measured in
accordance to the method and guidelines as set out in
the SANS 1200, 10400 and 10142 specifications.

The Bills of Quantities is provisional. All trades will be


re-measured for the final account.

Carried Forward R
Notes to Tenderers

-2-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

5 ACQUANTANCE WITH TENDER DOCUMENTS


ETC

By submission of a tender, the tenderer will be deemed


to have acquainted himself/herself fully with the tender
documents, local authority requirements and by-laws,
ACSA regulations and requirements, and all aspects of
the work envisaged in the documents prior to pricing
and submission of his/her tender

6 DRAWINGS

The tenderer is referred to the Annexures for the


drawings used for setting up this Bills of Quantities

7 SCOPE OF CONTRACT

The description hereunder is a general guide only and


the tenderer is referred to the architect's drawings for
tender purposes. No liability will be accepted should
the following short description be misconstrued.

The contract is for the retail renovations to the


Domestic Departures at King Shaka International
Airport.

The scope of the work generally comprises the


following:

- Take down existing retail units


- Construction of new retail units
(re-use of shopfronts where possible)
- Removal of existing carpets
- Removal of existing floor tiles to retail units
- New tiling to floors
- New carpet to floors
- Construction of a coffee shop
- Electrical installations to new retail units
- Ventilation installations to new retail units
- Fire prevention installations to new retail units

Carried Forward R
Notes to Tenderers

-3-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

8 SITE BRIEFING MEETING

A compulsory tender briefing will be held at 10h00 on


7th April 2017.

Tenderers are to meet at the reception of the Multi-


Storey Office Block, King Shaka International Airport.

9 ACCESS

The tenderer is to familiarise himself with the site


access limitations.

Site access will be via the staff entrances to the


Domestic Departures. No persons will be granted
access without a security permit.

For large materials and equipment being taken onto


site, access will be via the basement.

Security permits are required for ALL persons


working on or accessing the site (Domestic
Departures).

For Permit queries contact the Permit office:


(032) 436 6506

The tendereres are to ensure that security permits


are priced for in their tender sum (see Provisional
Sums).

The tenderers are to ensure that all site restrictions


are priced for in their tender sum.

10 NIGHT WORK

The tenderer is to price for the execution of the works


at night.

All work on site is to commence after the departure of


the last flight and will cease by 05h00 the following
morning.

Carried Forward R
Notes to Tenderers

-4-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

11 EXISTING PREMISES OCCUPIED

Tenderers are referred to C3: Scope of Works in the


document.

Tenderers attention is drawn to the cconditions of work,


specifically that the premises or area of works is a live
operational area. The contractor is therefore required
to carry out the work with minimum disturbance to the
daily operations of the airport.

12 EXISTING SERVICES

The following existing services are to be treated as live


systems:

- sewer
- water
- electrical
- telephone
- data

The contractor is responsible to complete his/her own


detection operation to ensure all existing
services are located and exposed, without damage
to existing
services.

13 CONTRACTOR'S CAMP

Locality and restrictions (to vehicles, etc) to be advised


by ACSA

14 TENDER ENQUIRIES

All tender enquiries to be directed to


Sbonela.Malinga@airports.co.za

15 SIGNING OF TENDER

The tender must be signed by the tenderer or by a


representative of the tenderer being duly authorised to
do so and the tenderer is to attach a company
resolution if applicable

Carried Forward R
Notes to Tenderers

-5-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

16 COSTS INCURRED BY THE TENDERER

The employer will not be responsible for or pay for


expenses or losses which may be incurred by the
tenderer in the preparation of the tender or in visiting
the site

17 ACCEPTANCE OF TENDER

The employer is not bound to accept the lowest or any


tender nor to give any reason for the rejection of any
tender

18 BLACK ECONOMIC EMPOWERMENT

Tenderers are referred to the the Tender Returnables


List in the document and ensure that all the required
information and documentation is included together
with the tender submission.

19 OCCUPATIONAL HEALTH AND SAFETY ACT -


CONTRACT AND SPECIFICATION

Tenderers must carefully study the project specification


and ensure that all of the obligations, requirements and
specifications are included in the tender sum

The tenderer is referred to Annexures A, B and C in


the document

20 INFORMATION TO BE PROVIDED BY
TENDERERS

Tenderers are referred to the Tender Returnables List


in the document and ensure that all the required
information and documentation is included together
with the tender submission.

Carried Forward R
Notes to Tenderers

-6-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

21 ESCALATION / FIXED PRICE CONTRACT

This contract will be a fixed price contract; i.e. the


contract sum is not subject to price escalation.
The tenderer must allow in his/her tender price for any
production cost increases expected during the contract
period.

22 ESCALATION AND COMPLETION DATES

The dates for completion of the contract are annexed


at the back of the tender form and are to be indicated in
the programme of works in the tender submission.

Escalation is not applicable to this project.

23 CONTRACT PERIOD

The contract period shall be 6 MONTHS including all


statutory and builder's holidays.

24 VALUE ADDED TAX

The tendered price must include for Value Added Tax


(VAT). All rates in these Bills of Quantities must
however be net (excluding VAT) with VAT calculated
and added to the total Value thereof in the Final
Summary.

25 PENALTY

The rate for penalties levied in terms of clause 30 of


the Contract, shall be R per calendar day
for which the completion of the contract is delayed.

Carried Forward R
Notes to Tenderers

-7-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

26 MAINTENANCE PERIOD

The maintenance period shall be as follows:

a) General building work: 3 months


b) Electrical installation : 12 months unless
otherwise stated
c) Mechanical installaion : 12 months

Any leakages to roofs or damage caused as a result


thereof within six (6) months after completion of the
work due to poor materials or competency of workmen,
shall be repaired by the contractor at his cost.

27 ORDER OF WORK

The tenderer shall programme his work to the


satisfaction of the principal agent.

The programme is to be included in the tender


submission.

28 PRICED BILL WITH FINAL SUMMARY

A complete and priced hard copy of the bills of


quantities with the final summary must be returned with
the tender form. FAILURE TO DO SO WILL
INVALIDATE THE TENDER.

Carried to Summary R
Notes to Tenderers

-8-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 1
BILL 1
PRELIMINARIES

NOTES
BUILDING AGREEMENT & PRELIMINARIES

The JBCC Prinicipal Building Agreement (Edition 6.1 March


2014) prepared by the Joint Building Contract Committee shall
be the applicable building agreement, amended as hereinafter
described.

The Preliminaries revision 1 (February 2016) published by the


Association of South African Quantity Surveyors for use with
the said JBCC Prinicpal Building Agreement Edition 6.1 shall be
deemed to be incorporated in these bills of quantities.

Contractors are referred to the above mentioned documents for


the full intent and meaning of each clause thereof.

These clauses are hereinafter referred to by clause number


and heading only. Where standard clauses or alternatives are
not entirely applicable to this agreement such amendments,
modifications, corrections or supplements as will apply are
given under each relevant clause heading and such
amendments, modifications, corrections or supplements shall
take precedence notwithstanding anything contrary contained in
the above mentioned documents.

Where any item is not relevant to this specific contract such


item is marked N/A, signifying "not applicable"

PREAMBLES FOR TRADES

The Model Preambles for Trades (2008 edition) as published


by the Association of South African Quantity Surveyors shall be
deemed to be incorporated in these bills of quantities and no
claims arising from brevity of description of items fully
described in the said Model Preambles will be entertained.

Supplementary preambles are incorporated in these bills of


quantities to satisfy the requirements of this project. Such
supplementary preambles shall take precedence over the
provisions of the said Model Preambles.

Carried Forward R
Preliminaries

-9-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

The contractor's prices for all items throughout these bills of


quantities must take account of and include for all of the
obligations, requirements and specifications given in the said
Model Preambles and in any supplementary preambles.

PRICING OF PRELIMINARIES

Should the contractor select Option A in terms of clause 26 in


the Contract Data for the purpose of adjustment of these
preliminaries, the amount entered into the amount column in
these preliminaries is to be divided into one or more of the three
categories provided namely Fixed (F), Value Related (V) and
Time Related (T)

SECTION A: PRINCIPAL BUILDING


AGREEMENT

Interpretation

1 Clause 1.0 - Definitions and Interpretation

F:........................... V:.......................... T:............................


Item

2 Clause 2.0 - Law, Regulations and Notices

F:............................ V:...................... T:............................

Without limiting the generality of the provisions of clause 2.0,


the contractor's attention is drawn to the provisions of the
Construction Regulations, February 2014 and the Occupational
Health and Safety Act, (Act No.85 of 1993) and in particular
with Regulation No.5 (1) requiring the compilation of a health
and safety plan, as well as Regulation No.6 (1) requiring the
appointment of a construction supervisor.

The contractor is referred to the following Annexures (A - C) in


the tender document:

(a) KS15 02 RU ACSA Environmental Ts and Cs


10431_EMS048

(b) KS15 02 RU ACSA


T010P_EMS_Policy_Statement

(c) KS15 02 RU ACSA Safety File Requirements

Non-compliance will result in a work stop order issued by the

Carried Forward R
Preliminaries

-10-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

principal agent should the non-conformance not be closed out


within the stipulated period on the non-conformance notice, at
the contractor's cost.
Item

3 Clause 3.0 - Offer and Acceptance

F:.......................... V:......................... T:..........................


Item

4 Clause 4.0 - Assignment and Cession

F:........................... V:.......................... T:...........................


Item

5 Clause 5.0 - Contract Documents

Clause 5.5 is amended by addition of the following:

The contractor shall keep a copy of the JBCC Principal Building


Agreement (Edition 6.1) and Preliminaries applicable to this
contract on site, to which the employer, principal agent and
agents shall have access at all times

F:........................... V:......................... T:............................


Item

6 Clause 6.0 - Employer's agents

F:........................... V:.......................... T:............................


Item

7 Clause 7.0 - Design responsibility

F:........................... V:.......................... T:...........................


Item

Insurance and Security

8 Clause 8.0 - Works risk

F:.......................... V:......................... T:..........................


Item

Carried Forward R
Preliminaries

-11-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

9 Clause 9.0 - Indemnities

F:........................... V:.......................... T:............................


Item

10 Clause 10.0 - Insurances

F:............................. V:............................ T:.....................


Item

11 Clause 11.0 - Security

F:................ V:............................ T:............................


Item

Execution

12 Clause 12.0 - Duties of the Parties

F:............................. V:............................ T:.....................

Sub-clause 12.2.18

The contractor must provide, erect, maintain and remove at


completion all required temporary fencing, hoarding screens,
barriers, access gates, etc.
Item

13 Clause 13.0 - Setting Out

The contractor shall notify the principal agent if any


encroachments of adjoining foundations, buildings, structures,
pavements, boundaries, etc exist in order that the necessary
arrangements may be made for the rectification of any such
encroachments.

F:......................... V:.......................... T:............................ Item

14 Clause 14.0 - Nominated subcontractors

F:............................. V:........................ T:............................


Item

15 Clause 15.0 - Selected subcontractors

F:............................. V:........................ T:............................


Item

Carried Forward R
Preliminaries

-12-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

16 Clause 16.0 - Direct subcontractors

F:............................. V:........................ T:............................


Item

17 Clause 17.0 - Contract instructions

F:............................. V:......................... T:...........................


Item

Completion

18 Clause 18.0 - Interim Completion

F:............................. V:........................ T:............................


Item

19 Clause 19.0 - Practical completion

F:........................... V:......................... T:............................


Item

20 Clause 20.0 - Sectional Completion

F:............................. V:........................ T:............................


Item

21 Clause 21.0 - Defects Liability Period and Final Completion

F:............................. V:........................ T:...........................


Item

22 Clause 22.0 - Latent Defects Liability Period

F:............................. V:........................ T:...........................


Item

23 Clause 23.0 - Revision of the Date for Practical Completion

The removal and replacement of materials and/or workmanship


which do not conform to specification or drawing shall not
constitute grounds for the extension of the construction period
nor for the adjustment of the contract value (Clause 23.3)

F:............................. V:........................ T:..........................


Item

Carried Forward R
Preliminaries

-13-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

24 Clause 24.0 - Penalty for Late or Non-Completion

F:........................... V:.......................... T:............................


Item

Payment

25 Clause 25.0 - Interim payment

Clause 25.7 is amended to:

The employer shall pay the contractor the amount certified in an


issued payment certificate within thirty (30) calender days of the
date for issue of the payment certificate.

F:............................. V:............................ T:............................


Item

26 Clause 26.0 - Adjustment to the Contract Value and Final


Account

F:.......................... V:........................... T:..................... Item

27 Clause 27.0 - Recovery of Expense and/or Loss

F:............................. V:........................ T:............................


Item

Suspension and Termination

28 Clause 28.0 - Suspension by the Contractor

F:............................. V:........................ T:............................


Item

29 Clause 29.0 - Termination

F:............................ V:......................... T:............................


Item

Carried Forward R
Preliminaries

-14-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

Dispute Resolution

30 Clause 30.0 - Dispute Resolution

F:........................... V:......................... T:........................... Item

SECTION B - PRELIMINARIES

Definitions and interpretation

31 Clause 1 0 - Interpretation
F:.............................V:............................T:.......................... Item

Documents

32 Clause 2.1 - Checking of documents


F:.......................... V:.......................... T:............................
Item

33 Clause 2.2 - Provisional bills of quantities

F:......................... V:............................ T:............................ Item

34 Clause 2.3 - Availability of construction information

F:............................. V:........................ T:............................ Item

35 Clause 2.4 - Ordering of materials and goods

F:............................. V:........................ T:............................ Item

Previous Work and Adjoining Properties

36 Clause 3.1 - Previous work - dimensional accuracy

F:............................. V:........................ T:............................ Item

37 Clause 3.2 - Previous work - defects

F:............................. V:........................ T:............................ Item

38 Clause 3.3 - Inspection of adjoining properties

F:............................. V:........................ T:............................ Item

Carried Forward R
Preliminaries

-15-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

The Site

39 Clause 4.1 - Defined works area

F:............................. V:........................ T:............................ Item

40 Clause 4.2 - Handover of site in stages

F:............................. V:........................ T:............................ Item

41 Clause 4.3 - Enclosure of the works

F:............................. V:........................ T:............................ Item

42 Clause 4.4 - Geotechnical investigation

F:............................. V:........................ T:............................ Item

43 Clause 4.5 - Encroachments

F:............................. V:........................ T:............................ Item

44 Clause 4.6 - Existing premises occupied

F:............................. V:........................ T:............................ Item

45 Clause 4.7 - Services - known

F:............................. V:........................ T:............................ Item

46 Clause 4.8 - Protection of trees and/or relevant natural features

F:............................. V:........................ T:............................ Item

Management of Contract

47 Clause 5.1 - Management of the works

F:............................. V:........................ T:............................ Item

48 Clause 5.2 - Progress meetings

F:............................. V:........................ T:............................ Item

49 Clause 5.3 - Technical meetings

F:............................. V:........................ T:............................ Item

Carried Forward R
Preliminaries

-16-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

Samples, Shop Drawings and Manufacturer's Instructions

50 Clause 6.1 - Samples of materials

F:............................. V:........................ T:............................ Item

51 Clause 6.2 - Workmanship samples

F:............................. V:........................ T:............................ Item

52 Clause 6.3 - Shop drawings

F:............................. V:........................ T:............................ Item

53 Clause 6.4 - Compliance with manufacturer's instructions

F:............................. V:........................ T:............................ Item

Deposits and Fees

54 Clause 7.1 - Deposits and fees

F:............................. V:........................ T:............................ Item

Temporary Services

55 Clause 8.1 - Water

F:............................. V:............................ T:................... Item

56 Clause 8.2 - Electricity

F:............................. V:............................ T:........................ Item

57 Clause 8.3 - Ablution and welfare facilities

F:......................... V:............................ T:............................ Item

58 Clause 8.4 - Communication facilities

F:......................... V:............................ T:............................ Item

Prime Cost Amounts

59 Clause 9.1 - Responsibility for prime cost amounts

F:.......................... V:.......................... T:............................ Item

Carried Forward R
Preliminaries

-17-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

Attendance on Subcontractors

60 Clause 10.1 - General attendance

F:............................. V:........................ T:............................ Item

61 Clause 10.2 - Special attendance

F:............................. V:........................ T:............................ Item

General

62 Clause 11.1 - Protection of the works

F:............................. V:........................ T:............................ Item

63 Clause 11.2 - Protection/isolation of existing/sectionally


occupied works

F:............................. V:........................ T:............................ Item

64 Clause 11.3 - Security of the works

F:............................. V:............................ T:....................... Item

65 Clause 11.4 - Notice before covering work

F:............................. V:........................ T:............................ Item

66 Clause 11.5 - Disturbance

F:............................. V:........................ T:............................ Item

67 Clause 11.6 - Environmental disturbance

F:............................. V:........................ T:............................ Item

68 Clause 11.7 - Works cleaning and clearing

F:............................. V:........................ T:............................ Item

69 Clause 11.8 - Vermin

F:............................. V:........................ T:............................


Item

Carried Forward R
Preliminaries

-18-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

70 Clause 11.9 - Overhand work

F:............................. V:........................ T:............................ Item

71 Clause 11.10 - Tenant installations by direct contractors

F:............................. V:........................ T:............................ Item

72 Clause 11.11 - Advertising

F:............................. V:........................ T:............................ Item

Schedule of variables

73 Information necessary for elections and completion of those


clauses contained in the schedule which are necessary for
tender purposes is given hereunder. Where no information is
given it shall mean that no specific requirements are expected
or that the clause is not relevant to this specific contract Item

12.1 - Provisional bills of quantities [clause 2.2]

The quantities are provisional Yes

12.2 - Availability of construction information


[clause 2.3]

Construction documentation is complete Yes

12.3 - Previous work - dimensional accuracy [clause


3.1]

N/A

Carried Forward R
Preliminaries

-19-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

12.4 - Previous work [clause 3.2]

N/A

12.5 - Inspection of adjoining properties [ 3.3]

The contractor is referred to Scope of Works in the


document.
The contractor is to inspect the adjoining tenant
properties for any defects prior to commencement
of works.

12.6 - Defined works area [4.1]

The contractor is referred to Scope of works in


the document.

12.7 - Handover of site in stages [4.2]

The contractor is to programme for the handing over


of the retail areas as completed, for the commencement of the
tenant installations.

12.8 - Enclosure of the works [clause 4.3]

The contractor shall provide, maintain and remove


on completion of the works, solid hoarding not
less than 2.1m high

12.9 - Geotechnical investigation [clause 4.4]

N/A

12.10 - Existing premises occupied [clause 4.7]

The contractor is referred to Scope of


works: working in a live operational area

12.11 - Services - known [clause 4.7]

Existing retail units to be relocated

12.12-Protection of trees and/or relevant features


[clause 3.9]
N/A

Carried Forward R
Preliminaries

-20-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

12.13 Water [clause 8.1]

Option A (by contractor) - yes

Option B (by employer - free of charge) - no

Option C (by employer - metered) - no

12.14 - Electricity [clause 8.2]

Option A (by contractor) - yes

Option B (by employer - free of charge) - no

Option C (by employer - metered) - no

12.15 - Ablution facilities [clause 8.3]

Option A (by contractor) - yes

Option B (by employer) - no

12.16 - Communication facilities [clause 8.4]

The contractor is to provide his own communication


facilities, including fax, e-mail and mobile telephones.

12.17 - Protection of the works [clause 11.1]

The contractor shal provide, erect, maintain and


remove on completion of the works, solid hoarding not
less than 2.1m high.

Carried Forward R
Preliminaries

-21-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

12.18 - Protection/isolation of existing/sectionally occupied


works [clause 11.2]

Protection is required Yes

12.19 - Disturbuance [clause 11.5]

The contractor is referred to the Scope of Works in the


document.

12.20 - Environmental disturbance [clause 11.6]

The contractor is referred to the C1: Environmental


Management of Section C: Specific Preliminaries and
the Environmental T's & C's 10431 EMS 048 and the
TO1OP EMS Policy Statement in the document.

Carried Forward R
Preliminaries

-22-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

SECTION C: SPECIFIC PRELIMINARIES

Section C contains specific preliminary items


which apply to this contract except where N/A
(Not Applicable) appears against an item

74 C1 ENVIRONMENTAL MANAGEMENT

The Contractor shall, before commencement of any work,


compile an Environmental Management Plan (EMP) (See
Annexures A, B and C). This must be done by a competent
person, appointed in writing, and this must form part of the
SHEQ file to be applied on the site and shall include the
following:

· Identification of the aspects and impacts to


which the environment may be exposed to;
· Analysis and evaluation of the aspects and
impacts identified;
· A document plan to mitigate, reduce or
control the aspects and impacts that have been
identified;
· A monitoring plan;
· A review plan; and
· A Waste Management Plan.

The Environmental Management Plan must be made


available to all staff at all times on the construction site. All staff
is to be made aware of the environmental aspects and impacts
on the site as well as the measures that are required to mitigate
or eliminate the risks.

The Employer has made their EMP available to the Contractor


in this document. The Contractor must include in his EMP on
how these document requirements will be met.

The contractor shall appoint a Environmental Officer (EO) in


terms of the CEMP (Annexures A, B and C) and allow for and
comply with all the requirements.

Signature of this agreement implies that the contractor studied


the Environmental Management requirements and has made
adequate provision to comply with all the requirements.

Non-conpliance will result in a work stop order issued by the PA


should the non-conformance not be closed out within the period
stipulated on the non-conformance notice.

Carried Forward R
Preliminaries

-23-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

Fixed:............... Value:....................Time:.......................... Item

75 C2 SITE OFFICE

The contractor shall provide, maintain and remove on


completion of the works, an office for the exclusive use of the
principal agent, minimum size 4m x 3m x 3m high internally,
suitably insulated, ventilated and air-conditioned, provided with
electric lighting and fitted with boarded floor, desk, chair,
drawing stool, drawing board and lock-up drawers for drawings.
The office shall be kept clean and fit for use at all times.

F:.......................... V:........................ T:........................... Item

76 C3 MAIN NOTICE BOARD

The contractor may make use of the site hoarding enclosing the
works to display the information contained in the notice board to
the approval of the client.

F:.............................. V:....................... T:...................... Item

77 C4 TRADE NAMES

Wherever a trade name for any product has been described in


the bills of quantities / lump sum document, the tenderers
attention is drawn to the fact that any other product of equal
quality may be used subject to the written approval of the
principal agent being obtained prior to the closing date for
submission of tenders

If prior written approval for an alternative product is not


obtained, the product described shall be deemed to have been
tendered for

F:............................. V:....................... T:............................ Item

Carried Forward R
Preliminaries

-24-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

78 C5 NIGHT SHIFT WORK

The contractor is referred to the Scope of Works in the


document.

The execution and completion of the works is deemed to be


during night shift, ie after the departure of the last flight in the
evening until 05h00 the following morning notwithstanding flight
schedule changes for departure times.

The costs of such nightshift are to be borne by the contractor.

F:............................. V:........................ T:............................ Item

79 C6 AS BUILT DRAWINGS

The position of construction breaks, services and connection to


existing services are to be recorded by the contractor on the
engineer's drawings and are to be submitted to the principal
agent and the engineer for their records.

F:............................. V:........................ T:............................ Item

80 C7 SITE INSTRUCTIONS

Site instructions issued on site are to be recorded in triplicate in


a site instruction book which is to be maintained on site by the
contractor

F:........................ V:............................ T:............................ Item

81 C8 LABOUR RECORD

At the end of each week the contractor shall provide the


principal agent with a written record, in schedule form, reflecting
the number and description of tradesmen and labourers
employed by him and all subcontractors on the works each shift
.

F:......................... V:............................ T:............................ Item

Carried Forward R
Preliminaries

-25-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

82 C9 PLANT RECORD

At the end of each week the contractor shall provide the


principal agent with a written record, in schedule form, reflecting
the number, type and capacity of all plant, excluding hand tools,
currently used on the works.

F:............................. V:........................ T:............................ Item

83 C10 WARRANTIES FOR MATERIAL AND WORKMANSHIP

Where warranties for materials and/or workmanship are called


for, the contractor shall obtain a written warranty, addressed to
the employer, from the firm supplying the materials and/or
doing the work and shall deliver same to the principal agent on
the certified completion of the contract. The warranty shall
state that workmanship , materials and installation are
warranteed for a specific period from the date of final
completion and that any defects that may arise during the
specified period shall be made good at the expense of the firm
supplying the materials and/or doing the work, upon written
notice to do so. The warranty will not be enforced if the work is
damaged by defects in the construction of the building in which
case the responsibility for replacement shall rest entirely with
the contractor.

F:............................. V:........................ T:............................ Item

84 C11 CO-OPERATION OF CONTRACTOR FOR COST


MANAGEMENT

It is specifically agreed that the contractor accepts the


obligation of assisting the principal agent in implementing
proper cost management. The contractor will be advised by the
principal agent of all cost management procedures which will
be implemented to ensure that the final building cost does not
exceed the budget. The principal agent undertakes to make
available to the contractor all budgetary allowances and cost
assessments/reports to enable the proper procedure to be
implemented and the contractor shall attend all cost plan review
and cost management meetings. The contractor undertakes to
extend these procedures, as necessary, to all subcontractors.

F:............................. V:........................ T:............................

Item

Carried Forward R
Preliminaries

-26-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

85 C12 NON CESSION OF MONIES

The contractor shall not cede nor assign his rights or claims to
any monies due or to become due under this contract

F:............................. V:........................ T:............................


Item

86 C13 VIEWING THE SITE IN SECURITY AREAS

The site is situated in a security area and the tenderer must


arrange with the Project Manager to obtain permission to enter
the site for tendering purpose

F:............................. V:....................... T:............................


Item

87 C14 COMMENCEMENT OF WORKS IN SECURITY AREAS

As the works falls within a security area the contractor must


give the Project Manager notice before commencement of the
works. Should the contractor fail to make such
arrangements, admission to the site may be refused and any
additional costs will be for the contractor's account

F:............................. V:........................ T:............................


Item

88 C15 ENTRANCE PERMITS TO SECURITY AREAS

As the works falls within a security area the contractor shall


obtain entrance permits for his personnel and workmen
entering the area and shall comply with all regulations and
instructions which may be issued from time to time regarding
the protection of persons and property under the control of the
Defence Force, Police of Chief Security Officer

F:............................. V:.........................T:............................
Item

Carried Forward R
Preliminaries

-27-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

89 C16 SECURITY CHECK OF PERSONNEL

The principal agent may require the contractor to have his


personnel and workmen, or a certain number of them, security
classified

In the event of the principal agent requesting the removal of a


person or persons from the works for security reasons, the
contractor shall do so forthwith and shall thereafter ensure that
such person or persons are denied access to the works and
the site and/or to any document or information relating to the
works

F:............................. V:........................ T:............................


Item

90 C17 PROHIBITION ON TAKING OF PHOTOGRAPHS

In terms of article 119 of the Defence Act, 44 of 1957, it is


prohibited to sketch or to take photographs of any millitary site
or installation or any building or civil works thereon or to be in
possession of a camera or other apparatus used for taking of
photographs except when authorized thereto by or on behalf of
the Minister

The same prohibition is also applicable to all correctional


institutions in terms of article 44.1(e) of the Correctional
Services Act of 1959

F:............................. V:...................... T:............................


Item

Carried Forward R
Preliminaries

-28-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

91 C18 CONTRACT DRAWINGS

The drawings issued with the tender documents serve as a


guide only for tendering purposes and for indicating the scope
of the work to enable the tenderer to acquaint himself with the
nature and extent of the works and the manner in which they
are to be executed. See C3: Scope of Works in the document

Should any part of the drawings not be clearly intelligible to the


tenderer he shall, before submitting his tender, obtain
clarification in writing from the principal agent

Fixed:.....................Value:................. Time:.................... Item

92 C19 GENERAL PREAMBLES

The document Model Preambles 2008 shall be read in


conjunction with the bills of quantities and be referred to for
the full descriptions of work to be done and materials to be
used

Fixed:.....................Value:...................... Time:................... Item

C20 HIV/AIDS AWARENESS

It is required of the contractor to thoroughly study the


HIV/AIDS Specification (PW
1544) of the Department that must be read together with and is
deemed to be
incorporated under this Section of the Bills of Quantities.
Provision for pricing of
HIV/AIDS awareness is made under items C20.1 to C20.5
hereafter and it is explicitly
pointed out that all requirements of the aforementioned
specification are deemed to be
priced hereunder, as the said items represent the only method
of measurement and no
additional items or extras to the contract in this regard shall be
entertained

The contractor must take note that compliance with the


HIV/AIDS Specification is
compulsory. In the event of partial or total non-compliance, the
principal agent,
notwithstanding the provisions of Clause A 25 of Section 1:
Preliminaries (Section A) or any other clause to the contrary,
reserves the right to delay issuing any progress
payment certificate until the contractor provides satisfactory
proof of compliance. The contractor shall not be entitled to any

Carried Forward R
Preliminaries

-29-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

compensation of whatsoever nature, including interest, due to


such delay of payment

93 C20.1 AWARENESS CHAMPION

Selection, appointment, briefing and making available of an


Awareness Champion
including provision of all relevant services, all in accordance
with the HIV/AIDS
Specification

Fixed:...............Value:.................. Time:....................... Item

94 C20.2 AWARENESS WORKSHOPS

Selection and appointment of a competent Service Provider


approved by the principal
agent, provision of a Service Provider Workshop Plan and a
suitable venue, conducting of awareness workshops by means
of traditional and/or modern multi-media techniques, including
follow-up courses, making available all tuition material and
performing assessment procedures, all in accordance with the
HIV/AIDS Specification

Fixed:..................... Value:...................... Time:................ Item

95 C20.3 POSTERS, BOOKLETS, VIDEOS, ETC.

Provision, displaying, maintaining and replacing when


necessary of four plastic
laminated posters, booklets and educational videos, etc. for the
duration of the
construction period, all in accordance with the HIV/AIDS
Specification

Fixed:....................Value:................. Time:..................... Item

Carried Forward R
Preliminaries

-30-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

96 C20.4 ACCESS TO CONDOMS

Provision and maintenance of condom dispensers fixed in


position, including male and
female condoms, replenishing male and female condoms on a
daily basis as required for the duration of the construction
period, all in accordance with the HIV/AIDS
Specification

Fixed:......................Value:..................... Time:................... Item

97 C20.5 MONITORING

Monitoring HIV/AIDS awareness of workers, providing the


principal agent with access to information including making
available all reports, thoroughly completed and reflecting the
correct information, for the duration of the construction period
and close out, all in accordance with the HIV/AIDS Specification

Fixed:..........................Value:..................... Time:................ Item

98 C21 ENTERPRISE DEVELOPMENT

The contractor is referred to Tender Returnables of the


document to provide for a Enterprise Development Practitioner.

Fixed:................. Value:..................... Time:......................

Item

99 C22 OCCUPATIONAL HEALTH AND SAFETY FILE

The contractor is referred to Tender Returnables (see also


Annexures C) of the document to provide for a Safety File in
accordance to the Construction Regulations (February 2014)
and the Occupational Health and Safety Act, 1993 (Act No.85
of 1993)

Fixed:................. Value:..................... Time:......................

Item

Carried to Summary R
Preliminaries

-31-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 2
ALTERATIONS
PREAMBLES

For Preambles refer to "Standard Preambles to all trades -


2008"

CPAP WORK GROUP

Unless otherwise stated all items in this bill will be Work Group
102

TEMPORARY BARRIERS, SCREENS, ETC

1 In taking down and removing existing work, the utmost care


shall be taken to avoid any structural or other damage to the
remaining portions of the building. The contractor shall cover up
and protect from injury all work not removed and shall make
good at his own expense any damage that may occur. Item

2 Provide and erect all casings and protection for and cover up all
existing fittings, doors, windows, joinery work, walls, floors, etc.,
not disturbed during the alterations and clear away and make
good on completion. Item

3 Provide, erect and remove when directed all temporary roof


coverings, tarpaulins, dust- and weather proof screens and
barriers that may be necessary as protection against damage to
the client's satisfaction. Item

4 Removal of and alterations to the Electrical and Mechanical


installations shall be executed by Specialists. Item

5 All demolition work is to be carried out in accordance with the


Local By-laws and to requirements of the Local Health
Authorities. Item

Carried Forward R
Alterations

-32-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

REMOVAL OF EXISTING WORK

Core drilling through reinforced concrete coffer slabs

6 50mm diameter hole through 200mm thick concrete coffer slab No 35

7 100mm diameter hole through 200mm thick concrete coffer


slab No 10

8 200mm diameter hole through 200mm thick concrete coffer


slab No 4

Carefully taking out and setting aside in safe-keeping for


re-use later

9 Timber single door and steel frame No 1

10 Aluminium roller shutter door size approximately 3.50m x


3.00m high No 8

11 Aluminium shopfronts including doors etc, size approximately


300mm long x 3.00m high No 6

12 Aluminium shopfronts including doors etc, size approximately


2.50m long x 3.00m high No 6

13 Aluminium shopfronts including doors etc, size approximately


2.00m long x 3.00m high No 4

14 Aluminium shopfronts including doors etc, size approximately


9.60m x 3.00m high No 4

Taking down and removing roofs, floors, panelling,


ceilings, partitions, etc

15 Gypsum plasterboard bulkheads approximately 400mm high by


850mm deep, including timber brandering, etc m 97

16 Gypsum plasterboard bulkheads approximately 600mm wide by


300mm deep, including timber brandering, downlighters and
sprinkler head fittings m 7

17 Gypsum plasterboard bulkheads approximately 1200mm wide


by 850mm deep, including timber brandering, downlighters and
sprinkler head fittings m 129

Carried Forward R
Alterations

-33-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

18 Drywall partitioning not exceeding 3m high including skirting,


studding, doors and windows, etc m 53

Taking out and removing steel or timber fittings

19 Floor cupboard unit 600 wide x 6000mm girth including worktop


No 2

20 Timber and glass display unit 18m girth extreme x 400 wide x
1200mm high including shelves, doors, glass tops and sides
No 2

21 Floor cupboard unit 9000mm long x 600 wide x 500mm high


including doors
No 1

22 Timber display shelving approximately 400mm wide x 2000mm


high m 8

Carefully taking out ironmongery and handing over to


client for safe-keeping (to be installed by others)

23 "VMG" digital free-standing advertising box approximately 900 x


500 x 1500mm high No 1

24 Five-seater airport chairs No 58

25 Information sign board, size approximately 1500 long x


1500mm high suspended by two poles aproximately 1500mm
below roof beam No 1

26 Illuminated sign board, size approximately 3000 long x 400mm


high fixed to bulkhead No 12

27 Information sign board, size approximately 1200 long x 400mm


high suspended by two poles aproximately 1500mm below roof
beam No 2

28 Information sign board, size approximately 600 long x 400mm


high suspended by two poles aproximately 1500mm below roof
beam No 4

29 Information sign board, size approximately 600 long x 400mm


high fixed to concrete No 4

30 Digital Flight Information Screens, size approximately 800 long


x 600mm high fixed to concrete No 12

Carried Forward R
Alterations

-34-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

31 Digital Flight Information Screens, size approximately 2000mm


long x 2000mm high suspended from roof beam No 1

32 Free-standing digital information screens on pillars


approximately 800mm high No 8

33 Aluminium rubbish bins approximately 400mm diameter x


700mm high No 9

34 Aluminium rubbish bins approximately 800mm long x 700mm


high x 150mm deep No 2

35 Pot plants approximately 400mm diameter x 1600mm high


overall No 14

Taking out/off and removing sundry metalwork

36 150 x 150mm Hollow structural steel framework including


plates, cleats, bolts, etc m 90

37 Cable trays approximately 200mm wide including hangers, etc m 75

38 Galvanised mild steel grille including supporting channel


purlins, cleats, bolts, etc m2 284

Taking out and removing vinyl floor coverings, carpeting,


etc:

39 Carpet floor covering. m2 384

40 Laminated timber floor covering. m2 40

Hacking up/off and removing ceramic tile floor and wall


finishes including removing mortar bed or backing and
preparing concrete or brick surfaces for new screed,
plaster or tile finishes

41 Tiles to floors (varying in size and type) m2 934

CUTTING THROUGH FLOORS AND CEILINGS

42 Cutting through 100mm thick concrete slab for sleeves, etc and
making good concrete (elsewhere measured) m 30

Carried Forward R
Alterations

-35-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

MAKING GOOD OF FINISHES ETC

Making good internal cement plaster

43 Walls in patches m2 17

44 Making good to wall where copper water pipes have been


chased into plastered walls m 30

45 Making good to wall where electrical conduits have been


chased into plastered walls m 30

46 Cut through 100mm thick surface bed for 50mm waste pipe
(elswhere) and making good to floor afterwards m 20

PREPARATORY WORK TO EXISTING


SURFACES

Preparation to existing horizontal surfaces.

47 Hack face of existing concrete surface bed to receive new


screed (screed elsewhere) m2 1 358

Carried to Summary R
Alterations

-36-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 3
ROOF COVERINGS, ETC
PREAMBLES

For Preambles refer to "Standard Preambles to all trades -


2008"

SUPPLEMENTARY PREAMBLES

Proprietary items or materials

Proprietary items or materials where specified are to be of the


brand specified - or other approved - by ACSA

Fixing

Fixing shall be done according to SABS 1200HB with minimum


225mm end laps

CPAP WORK GROUP

Unless otherwise stated all items in this bill will be Work Group
125

PROFILED METAL SHEETING AND


ACCESSORIES

"Safintra" 0.8mm thick "Saflok 700" concealed fix


aluminium roof sheeting and accessories with "G4
Colortech" finish on one side and protective primer
coating on the reverse side fixed to steel purlins or rails
spaced at 1340mm centres. All sheeting is to be clearly
marked on the reverse side at one-metre intervals
indicating thickness, material quality, coating thickness
and paint system.

1 Roof covering with pitch not exceeding 10 degrees m2 402

Carried to Summary R
Roof Coverings

-37-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 4
CEILINGS, PARTITIONS AND ACCESS
FLOORING
PREAMBLES

For Preambles refer to "Standard Preambles to all trades -


2008"

SUPPLEMENTARY PREAMBLES

Proprietary items or materials

Proprietary items or materials where specified are to be of the


brand specified - or other approved - by ACSA

Descriptions

Items described as "nailed" shall be deemed to be fixed with


hardened steel nails or pins or shot pinned to brickwork or
concrete

"Rhino-Drywall" partition systems

"Rhino-Drywall" partitions shall comprise 63,5mm top and


bottom galvanised steel tracks with 63,5mm galvanised steel
vertical studs at maximum 600mm centres, friction fitted or
pop-riveted to the top and bottom tracks with similar additional
verticalstuds as necessary at abutments, ends, etc and covered
as described with wallboard screwed to studding with "Drywall"
screws at maximum 220mm centres. Boards shall be butt
jointed and finished with "Rhino" tape and "Readymix D" jointing
compound all in accordance with the manufacturer's
instructions, complete with flat section aluminium skirtings.
Intersections and abutments are measured separately and
descriptions shall be deemed to include any additional studs,
corner beads, jointing compound and galvanised bracing

CPAP WORK GROUP

Unless otherwise stated all items in this bill will be Work Group
129

Carried Forward R
Ceilings, Partitions And Access Flooring

-38-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

BULKHEADS

12.5mm Gypsum plasterboard with 63mm wide strips of


mesh scrim nailed over joints and the finished with
gypsum skim plaster trowelled to a smooth polished
surface to the thickness recommended by the
manufacturer

1 Horizontal bulkheads 800mm wide x 300mm deep, including


galvanised steel sub-frames m 3

2 Horizontal bulkheads 1200mm wide x 846mm high, including


galvanised steel sub-frames m 121

3 Vertical bulkheads 700mm wide x 300mm deep, including


galvanised steel sub-frames m 7

4 Extra over horizontal bulkheads for opening for light fittings


(elsewhere) No 111

5 Extra over horizontal bulkheads for opening for fire sprinkler


fittings (elsewhere) No 53

PARTITIONS ETC

CPAP WORK GROUP 138

"Gyproc Drywall" partition systems

Note: Wall paper and/or paint and varnish finishes are


measured elsewhere

"GypWall Firestop 51/F30S39" steel stud partitioning


complete with 1 layer of 12.5mm thick "Gyproc Firestop"
on both sides and braced internally with C5 coiled
galvanised straps as per the Engineer's drawings

6 Partitioning 650mm high with bottom and top tracks fixed to


structural steel framework m 103

7 Partitioning 3.50m high with bottom track plugged and top track
fixed to ceiling m 29

8 Partitioning 4.00m high with bottom track plugged and top track
fixed to ceiling m 66

9 Extra over partition 1.00m high for vertical abutment No 64

Carried Forward R
Ceilings, Partitions And Access Flooring

-39-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

10 Extra over partition 4.00m high for vertical abutment No 22

11 Extra over partition 4.00m high for T-intersection No 32

12 Extra over partition 3.50m high for vertical abutment No 36

Doors

13 Extra over partition for door frame and 40mm solid core flush
door 813 x 2032mm high with commercial veneer on both
sides and hardwood edge strips to vertical edges hung to
and including standard natural anodised aluminium door
frame with three 100mm nylon washered aluminium hinges
including two "Union CZ692-05SC Radius Lever" door handles
with "Union Euro Profile Double Cylinder 2x810/BPLMK" in a
"Union L-22315-76SS" Cylinder lockcase, and additional
studding, trimming, etc No 10

Carried to Summary R
Ceilings, Partitions And Access Flooring

-40-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 5
FLOOR COVERINGS, PLASTIC LININGS,
ETC
PREAMBLES

For Preambles refer to "Standard Preambles to all trades -


2008"

SUPPLEMENTARY PREAMBLES

Proprietary items or materials

Proprietary items or materials where specified are to be of the


brand specified - or other approved - by ACSA

CPAP WORK GROUP

Unless otherwise stated all items in this bill will be Work Group
130

FLOOR COVERINGS

Carpets to Budget Amount (installation included) R400/m2


(The Tenderer must allow for attendance and profit in his
rate if required)

1 On floors m2 486

TIMBER LAMINATE FLOOR COVERINGS

Laminated floor boards to Budget Amount (installation


included) R400/m2 (The Tenderer must allow for
attendance and profit in his rate if required)

2 On floors m2 64

Carried to Summary R
Floor Coverings and Wall Linings

-41-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 6
IRONMONGERY
PREAMBLES

For Preambles refer to "Standard Preambles to all trades -


2008"

SUPPLEMENTARY PREAMBLES

Proprietary items or materials

Proprietary items or materials where specified are to be of the


brand specified - or other approved - by ACSA

Finishes to ironmongery

Where applicable finishes to ironmongery are indicated by


suffixes in accordance with the following list

BS Satin bronze lacquered


CP Chromium plated
SC Satin chromium plated
SE Silver enamelled
GE Grey enamelled
AS Anodised silver
AB Anodised bronze
AG Anodised gold
ABL Anodised black
PB Polished brass
PL Polished and lacquered
PT Epoxy coated
SD Sanded

Fixing

Descriptions of wall mounted and floor standing ironmongery


items shall be deemed to include for fixing in position and all
fixing accessories

Descriptions of proprietary items shall be deemed to include


fixing in position and all fixing accessories as specified by the
manufacturer

Carried Forward R
Ironmongery

-42-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

CPAP WORK GROUP

Unless otherwise stated all items in this bill will be Work Group
132

INSTALLATION OF IRONMONGERY
PREVIOUSLY SET ASIDE

Signage

1 Information sign board, size approximately 1500 long x


1500mm high suspended by two poles aproximately 1500mm
below roof beam No 1

2 Illuminated sign board, size approximately 3000 long x 400mm


high fixed to bulkhead No 12

3 Information sign board, size approximately 1200 long x 400mm


high suspended by two poles aproximately 1500mm below roof
beam No 2

4 Information sign board, size approximately 600 long x 400mm


high suspended by two poles aproximately 1500mm below roof
beam No 4

5 Information sign board, size approximately 600 long x 400mm


high fixed to concrete No 4

Sundries

6 "VMG" digital free-standing advertising box approximately 900 x


500 x 1500mm high No 1

7 Free-standing digital information screens on pillars


approximately 800mm high No 8

8 Five-seater airport chairs No 58

9 Aluminium rubbish bins approximately 400mm diameter x


700mm high No 9

10 Aluminium rubbish bins approximately 800mm long x 700mm


high x 150mm deep No 2

11 Pot plants approximately 400mm diameter x 1600mm high


overall No 14

Carried to Summary R
Ironmongery

-43-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 7
STRUCTURAL STEELWORK
SUPPLEMENTARY PREAMBLES

Items, materials or methods to be used specified by trade


names or catalogue numbers are only an indication of the
quality required. Items, materials or other approved may be
used with prior approval from the architect.

NOTES

1. All steel must be grade S355 JR to SABS 1431. Commercial


Grade cold rolled sections to have a minimum yield stress of
225 MPa (Contractor to get confirmation from supplier in this
regard).

2. All bolts and nuts to be grade 8.8 unless otherwise specified.


Bolts shall be hot dip galvanised to BS763 and it must be
possible to screw mate parts together by hand.

3. All fasteners must be supplied by the Contractor.

4. All welds shall be full penetration 6mm welds to SABS 044


and SABS 455, all round where possible, unless otherwise
stated.

5. All construction and workshop details must be approved by


the Engineer before fabrication is started.

6. Structural steelwork must be carried out according to


SABS 1200H.

7. All bolts and nuts must have washers.

8. The contractor must ensure adequate structural stability


of the structure for the full duration of erection.
The contractor shall supply all temporary bracing and fixing
mechanisms to achieve the above.

9. No holes to be formed or widened with the use of a cutting


torch. The contractor must confirm all dimensions on site.
Discrepancies to be reported to the engineer.

Carried Forward R
Structural Steelwork

-44-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

10. Prices for all structural steelwork are to include for the
following:

(a) preparation and submission of two complete sets of shop


drawings to the Structural Engineers for approval,

(b) fabrication,

(c) cleaning down and sandblasting to SA 2,5 (SIS 05 5900 -


1967) with profile of between 40 and 70 micron,

(d) prime (within 3 hours of sandblasting) with "Plascon zinc


phosphate primer (UC. 170) to dry film thickness of
between 50 and 100 micron,

(e) delivery to site,

(f) storage, if necessary,

(g) hoisting and erection complete, including all holing,


galvanised mild steel bolts, washers, packing pieces,
bolting, welding, etc

11. Painting of structural steelwork after erection is elsewhere


measured

CPAP WORK GROUP

Unless otherwise stated all items in this bill will be Work Group
134

HOT DIPPED GALVANISED STEEL, ERECTED


AND FIXED IN POSITION COMPLETE

COLUMNS AND BEAMS


Welded columns in single lengths with flat section base,
tops, bearers and connection plates bolted to concrete and
steel

1 100 x 100 x 5mm Thick square hollow section column kg 2 880

2 50 x 50 x 5mm Thick square hollow section column kg 228

Carried Forward R
Structural Steelwork

-45-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

Welded beams in single lengths with flat section bearer


and connection plates bolted to columns

3 IPE 200 I-section beam kg 10 442

Cleats, brackets, etc

4 250 x 250 x 12mm Base- and topplates kg 294

PURLINS, GIRTS, BRACING, ETC

Purlins and girts welded to steel

5 100 x 50 x 20 x 2,5mm Lipped channel section purlins t 1.97

Bracing, bearers, cleats, etc. bolted to steel

6 50 x 50 x 5mm Angle section structural members t 0.16

Sundries

7 Steelwork in base plates , connector plates, cleats, etc.


(Provisional) kg 2 168

BOLTS

Hot Dipped Galvanised bolts to trusses, etc.

8 M16 Hilti HIT-Z chemical anchor bolts 200mm long including


HILTI HY 200A epoxy No 224

9 M12 Diameter grade 8.8 bolts No 336

10 M10 Diameter grade 8.8 bolts No 1 360

Carried to Summary R
Structural Steelwork

-46-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 8
METALWORK
PREAMBLES

For Preambles refer to "Standard Preambles to all trades -


2008"

SUPPLEMENTARY PREAMBLES

Proprietary items or materials

Proprietary items or materials where specified are to be of the


brand specified - or other approved - by ACSA

Descriptions

Descriptions of bolts shall be deemed to include nuts and


washers

Descriptions of expansion anchors and bolts and chemical


anchors and bolts shall be deemed to include nuts, washers
and mortices in brickwork of concrete

Metalwork described as "holed for bolt(s)" shall be deemed to


exclude the bolts unless otherwise described

Carried Forward R
Metalwork

-47-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

Aluminium doors, windows, shopfronts, etc

Doors, windows and shopfronts shall comply with AAMSA


design criteria.

Glazing shall comply with SAGGA regulations. Glass thickness


shall comply with SAGGA regulations irrespective of the
thickness shown on the Bills of Quantities, schedules or
drawings.

Doors and windows shall be supplied with protective tape and


plastic and shall be removed only once surrounding trades
have been completed.

The following certificates shall be provided prior to


commencement of work:

1. A copy of the relevant AAMSA Performance Test


Certificate from the manufacturer/contractor
supplying the architectural aluminium product

2. A Certificate of Conformance confirming that


anodising or powder coating has been processed in
accordance with SANS 999 and SANS 1796
respectively

3. A powder guarantee of not less than 15 years issued


by the powder manufacturer. The specific conditions
contained in this guarantee shall form part of the
powder coating process

4. A Certificate of Conformance confirming that the


glazing has been installed in accordance with SANS
0137, ensuring that safety glazing materials have
been installed in the mandatory areas and that each
individual pane of safety glazing materials have been
permanently marked

5. A warranty from the manufacturer of the laminated


safety glass and/or hermetically sealed glazing units
guaranteeing the products against delamination and
colour degradation for a period of not less than five
years

Carried Forward R
Metalwork

-48-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

CPAP WORK GROUP

Unless otherwise stated all items in this bill will be Work Group
136

SUNDRY GALVANISED STEELWORK

Architectural Aluminium Structural Canopy Louvre to


Structural Steel Framework as per Engineer's
Specifications

1 50 x 150mm Square hollow section frame bolted to steel m 244

2 50 x 50 x 3mm Thick square hollow section louvres welded m 620

3 100 x 50 x 8mm Thick bracket three times holed for 10mm


diameter bolts No 102

4 50 x 50 x 10mm Thick bracket welded and one times holed for


5mm thick stainless steel cable (elsewhere) No 102

5 5mm Thick stainless steel suspension cable approximately


1.2m long spliced, crimped and tensioned with stainless steel
thimbles and nickel plated copper ferrules on both ends, to
brackets (elsewhere) including clear plastic sleeves and
proofloaded test certificates No 102

6 M10 x 50mm Lindaptor Hexagonal Hollo bolt including 1mm


thick rubber insulation No 95

7 M10 Rawl bolts No 3

Hot Dipped Galvanised and Painted 50 x 50 x 3mm


Expanded Metal Louvres fixed to Hot Dipped Galvanised
light steel structure as per Architect's specification

8 50 x 50 x 3mm Expanded metal welded m2 46

9 25 x 25 x 3mm Angle section fixed fixed to steel beams kg 200

Carried Forward R
Metalwork

-49-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

ALUMINIUM WINDOWS AND SHOP FRONTS

CPAP WORK GROUP 140

"Wispeco" series 340 powder coated charcoal aluminium


windows complete with ironmongery, sub-frames, 6.4mm
thick "Shatterproof" glass, fixed and sealed with an
approved silicon sealant

10 Shopfront size 825mm x 2425mm high overall consisting of


6.4mm safety glass (W3) No 4

11 Shopfront size 863mm x 2425mm high overall consisting of


6.4mm safety glass (W4) No 4

12 Shopfront size 3000mm x 2425mm high overall consisting of


6.4mm safety glass (W5) No 4

13 Shopfront size 3700mm x 2425mm high overall consisting of


6.4mm safety glass (W1) No 2

14 Shopfront size 3950mm x 2425mm high overall consisting of


6.4mm safety glass (W2) No 2

15 Shopfront size 5875mm x 2425mm high overall consisting of


6.4mm safety glass (W6) No 2

"Hilladam Vistafold" purpose made powder coated


aluminium sliding folding doors complete with sub-frames,
doors, glass, glazing beads, ironmongery like hinges,
sliding gear, tracks, locksets, pull handles and back plates,
door stops, double action door closers, etc. including
fixing and sealing with an approved silicon sealant

16 Sliding and folding door of top-hung opening sections, overall


opening size 3000mm x 2425mm (D01) No 8

17 Sliding and folding door of top-hung opening sections, overall


opening size 3300mm x 2425mm (D03) No 2

18 Sliding and folding door of top-hung opening sections, overall


opening size 3600mm x 2425mm (D05) No 2

19 Sliding and folding door of top-hung opening sections, overall


opening size 4000mm x 2425mm (D04) No 2

Carried Forward R
Metalwork

-50-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

20 Sliding and folding door of top-hung opening sections, overall


opening size 5000mm x 2425mm (D02) No 2

Carried to Summary R
Metalwork

-51-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 9
PLASTERING
PREAMBLES

For Preambles refer to "Standard Preambles to all trades -


2008"

SUPPLEMENTARY PREAMBLES

Proprietary items or materials

Proprietary items or materials where specified are to be of the


brand specified - or other approved - by ACSA

Smooth ruled plaster

Smooth ruled plaster shall be composed of one part cement


and five parts course sand. Rates must include for forming
10mm wide x 10mm deep square joints at 450mm centres

CPAP WORK GROUP

Unless otherwise stated all items in this bill will be Work Group
142

GROUT

Non-shrink grout between concrete and steel surfaces

1 30mm Thick on concrete m2 10

SCREEDS
Screeds on concrete

2 25mm Thick on floors and landings m2 1 355

Carried to Summary R
Plastering

-52-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 10
TILING
PREAMBLES

For Preambles refer to "Standard Preambles to all trades -


2008"

SUPPLEMENTARY PREAMBLES

Proprietary items or materials

Proprietary items or materials where specified are to be of the


brand specified - or other approved - by ACSA

Fixing

Tiling shall be fixed with an approved tile adhesive to a plaster


backing and grouted with an aprroved anti-bacterial grouting.
Plaster backing is measured elsewhere.

Descriptions

Unless described as "fixed with adhesive to plaster (plaster


elsewhere)" or "fixed with adhesive to concrete floor or screed
(power floating or screed elsewhere)" descriptions of tiling on
brick or concrete walls, columns, etc shall be deemed to
include 1:4 cement plaster backing and descriptions of tiling on
concrete floors etc shall be deemed to include 1:3 plaster
bedding

Prime cost

Prime cost for tiles is for the delivered tile price per square
metre only. The contractor's rate must include for adhesive,
jointing compound, sealer, waste, labour, profit, etc.

CPAP WORK GROUP

Unless otherwise stated all items in this bill will be Work Group
144

Carried Forward R
Tiling

-53-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

FLOOR TILING

300 x 600 x 10mm Thick "Union" UTB 1418 PSGH full body
porcelain floor tiles with natural finish fixed with adhesive
on screed (elsewhere) and flush pointed with epoxy
waterproof jointing compound

1 On floors and landings m2 557

2 200mm Wide on floors and landings laid to pattern m 175

3 Skirting of 150mm high cut tile m 25

Porcelain floor tiles Prime Cost R 300.00/m2 fixed with


adhesive to concrete floor or screed (power floating or
screed elsewhere) and flush pointed with tinted waterproof
jointing compound

4 On floors and landings m2 312

CORNER PROTECTORS, DIVIDING STRIPS, ETC

"Kirk Marketing"

5 14 x 8mm EDA Flat section aluminium dividing strips between


different floor finishes m 212

6 Code AWTIR 712 100mm aluminium M-trim m 351

Carried to Summary R
Tiling

-54-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures
Item
Quantity Rate Total
No.
BILL 11
POWER & LIGHTING
(Refer to Electrical Specification in Annexures)

COPPER PVC/SWA/PVC CABLES


Supply and installation of copper PVC/SWA/PVC/ECC
cables laid in ducts, trenches, horizontal racks or
vertical ducts. Rates shall include the supply and fixing
of supports with regard to installation of cables. Rates
shall include the PVC cable ties as required. All cables
are Copper PVC/SWA/PVC/ECC cables per SANS
1507.
Note that redundant cables long enough for new
supplies will be re-used if necessary. To be determined
on site by contractor, engineer and ACSA.

1 16sq mm 2-C PVC/SWA/PVC/ECC m 1900

2 10sq mm 4-C PVC/SWA/PVC/ECC m 3000

3 4sq mm 2-C PVC/SWA/PVC/ECC m 300

4 2.5sq mm 2-C PVC/SWA/PVC/ECC m 1500

Termination of copper PVC/SWA/PVC/ECC cables in


DB's and metering panel. Rates shall include the
supply and installation of glands, shrouds, lugs, nuts,
bolts and washers as required.

5 16sq mm 4-C PVC/SWA/PVC/ECC No 18

6 10sq mm 4-C PVC/SWA/PVC/ECC No 14

7 4sq mm 2-C PVC/SWA/PVC/ECC No 14

8 2.5sq mm 2-C PVC/SWA/PVC/ECC No 6

DISTRIBUTION BOARDS
Refer to Schematic for layout and equipment
requirements
Supply and Install Distribution boards complete with
doors, frames, sub-frames, chassis fixtures,
switchgear, terminations, bus-bars and wiring, labelling
and line diagrams as specified. Minimum 30-80%
spare space to be allowed in each DB. To match
existing tenant DB's

Tenant Distribution board as per schematic: DB DR 1.1


9
- 2.5 No 8

Carried Forward R
Bill No. 11
Electrical

-55 -
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures
Item
Quantity Rate Total
No.

Brought Forward R

Modification and additions to Emergency and Normal


existing Board. Modifications to include moving of
circuits, re-labelling, new cut-outs, bus wiring, copper
busbars, etc, including:
Supply and Install Elster A220 meter to be linked into
existing systems. To include Modbus convertor on each
10
meter and daisy chain connection to the existing
meters No 6

Disconnect and re-connect Existing Elster meters for


11
relocated tenants No 10

Supply and install additional circuit breakers on existing


panel for new supplies. All circuit breakers to match the
existing Multi 9, 5kA range. To include all wiring to
circuit breaker from busbars and terminating outgoing
cables.

12 63A SP Circuit Breakers No 8

13 32A SP Circuit Breakers No 14

14 20A SP Circuit Breakers No 1

15 Earth Leakages DP 63A, 30ms Isolator type No 4

Modifications and additions to UPS existing Board


including:
16 10A SP Circuit Breakers No 7

CONDUITS & CONDUIT BOXES


Supply and installation of conduit and boxes as
specified for lighting, power and auxiliary outlets,
including couplings, bushes, locknuts, bending,
drawboxes and fixing,etc in accordance with metallic
conduit and accessories as per SANS 60614 and non
metallic conduit and accessories as per SANS 950

NON-METALLIC PVC CONDUIT


Surface mounted on dry wall or concrete slabs
17 20mm m 400

18 25mm m 50

19 50mm m 300

20 50mm bends No 55

Carried Forward R
Bill No. 11
Electrical

-56 -
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures
Item
Quantity Rate Total
No.

Brought Forward R

Pressed galvanized steel boxes


100 x 100 x 50mm deep galvanised boxes secured in
21
dry wall partition No 24

100 x 100 x 50mm deep PVC surface mounted boxes


22
complete with blank cover No 17

100 x 50 x 50mm deep PVC surface mounted boxes


23
complete with blank cover No 17

24 Blank covers for data/telephone outlets in outlet box No 25

CIRCUIT WIRING, CABLING & OUTLET POINTS


PVC CONDUCTORS
Supply and drawn in of copper PVC insulated
conductors in conduit or trunking system in floor
or in roof space for lights, plugs and power points,
including connection to switches and equipment.
For Live, Neutral and Earth.

25 2,5 mm² (Live, Neutral and Earth) m 300

SWITCHED SOCKET OUTLETS


Supply, installation and connection of 16Amp
switched socket outlets in 100 x 100 x 50mm boxes
with white coloured cover plates

26 16 Amp 3 pin double - Normal No 17

27 16 Amp 3 pin double - Dedicated emergency-red No 8

28 16 Amp 3 pin double- UPS - Blue No 10

29 16 Amp 3 pin Blue plug tops No 20

ISOLATORS
Supply, installation and connection of isolator in
Polypropylene extension box

30 60 Amp 2 pole 230V complete with box No 7

TELEPHONE AND DATA OUTLETS


Supply install and terminate Category 7 Copper LAN
cables drawn in cable basket/ sleeve / conduit/
powerskirting/ trunking / pole. For network cabling
systems at 600Mhz.Cable terminations to be in RJ 45
Cat 7 as required.

Carried Forward R
Bill No. 11
Electrical

-57 -
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures
Item
Quantity Rate Total
No.

Brought Forward R

RJ45 data outlets in extension box. To include data


31
cable termination. No 26

32 Cat 7 data cable mounted on cable basket m 2000

CABLE TRAYS & BASKETS


Supply and installation of galvanized cable trays and
baskets to be installed in the positions as indicated on
the drawings including splices, off-sets, nuts, bolts,
bonding, earthing and mounting . The rate shall include
for the fixing of cable tray and basket in a horizontal
position against the wall by means of suitable
cantilever support arms and rawl bolts, or alternatively
by means of 41mm x 41mm trunking suspended in a
horizontal position from the soffit by means of M10mm
threaded metal rod hangers with anchor bolts at
intervals not exceeding 1000mm.
NOTE: CABLE LADDER INSTALLED AT 6-10M
ABOVE FLOOR LEVEL IN CEILING SOFFIT.
PRICING TO BE FOR INSTALLATION USING
SCAFFOLD, SKY JACKS AS APPROVED BY ACSA.
Note that available space on existing cable trays /
baskets will be utilised and new cable trays / baskets
will not be installed if not required. To be determined on
site by contractor, engineer and ACSA.

450mm cable tray complete with hanger supports at


33
1000mm apart. m 600

300mm Cable basket complete with hanger supports at


34
1000mm apart m 1200

Elbow, bends, external dropper and internal risers

35 450mm cable tray bends,T's and droppers/risers No 20

36 300mm cable basket bends,T's ,droppers and risers No 40

ISOLATORS
Supply, installation and connection of isolator in
Polypropylene extension box
30 Amp 2 pole 230V isolators complete with weather
37
proof slide box. No 7

Carried Forward R
Bill No. 11
Electrical

-58 -
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures
Item
Quantity Rate Total
No.

Brought Forward R

GENERAL
Removal / relocation of existing equipment as per site
co-ordination
38 FIDS No 11
39 Illuminated screens No 4
40 Giant advertising screen(9xscreens) including server No 1
41 Wi-Fi Repeaters No 2
42 CCTV Cameras No 2

Make safe electrical supply at existing tenant


installations and remove all electrical DB's, outlets, etc
43
not removed by tenant. Rates to include removal and
delivery to ACSA stores at KSIA. Sum 1

Make safe electrical supply at DB-3 and remove all


supply 10mm and 16mm cables to redundant services /
44
DB's . Rates to include removal and delivery to ACSA
stores at KSIA. Sum 1
Note that redundant cables long enough for new
supplies will be re-used if necessary. To be determined
on site by contractor, engineer and ACSA.

TESTING, COMMISSIONING AND HANDOVER


(Refer to Electrical Specification in Annexures)
TESTING AND COMMISSIONING:

Test and commission complete installation per SANS


45
10142-1 and as specified. Item 1

DOCUMENTATION
46 Submit As-built drawings to the Engineers satisfaction. Item 1
1 x full set "red line" drawings (hard copy)

Submit Operation & Maintenance Manuals to the


47
Engineers satisfaction Item 1
3 x sets manufacturers and supplier schedules,
operation and maintenance manuals and drawings
(hard copy + CD)

Issue Certificate of Compliance (CoC) in terms of


48
SANS 10142-1: Sum 1
- 1 for each Tenant Unit (8 off)
- 1 for DB-3 Modifications (Normal, Emergency and
UPS)
- 1 overall CoC

Carried to Summary R
Bill No. 11
Electrical

-59 -
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No

BILL NO. 12

MECHANICAL INSTALLATION

SECTION NO. 1

GENERAL ITEMS

Structural Steel work

1/1 Allow for Structural steel work for the construction of


supports and/or custom made support brackets, etc. to
the approval of the Mechanical Engineer t 1.00

Health & Safety Requirements as per the


Occupational Health and Safety Act No. 85 of 1993
including all ammendments thereof

1/2 Allow for full compliance of all Health & Safety


Requirements Item

Preparatory work

1/3 Allow for the provision of 75mm diameter core holes


through the existing concrete slab to accommodate the
installation of service and/or sprinkler pipes (measured
elsewhere), exact locations to be determined on site, all
as per the details of the Mechanical Engineer. Item

1/4 Any additional preparatory work not listed, needed to


ensure a fully functional system (Addendum required
with full description and breakdown describing any costs
herein) Item

Carried to Summary R

Bill No. 1
Section No. 1 General

-60-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No

BILL NO. 12

MECHANICAL INSTALLATION

SECTION NO. 2

DUCTING & FITTINGS

FRESH AIR MAKE-UP DUCTING (SHOPS 1 & 2)

Galvanised Sheet metal low pressure ducting


suspended in ceiling voids, including all supports,
hangers, flanges, etc. all as per the detailed
specification and drawings of the Mechanical
Engineer.

Fresh Air - Specialized Ducting Fittings:

2/1 0.6mm Galvanised 45 Tee - Saddle size 275mm x


275mm x 200mm diameter
No 5

2/2 Galvanised Branch + Plate size 200mm diameter, 50mm


long
No 7

2/3 Galvanised Branch + Plate size 275mm diameter, 50mm


long
No 2

2/4 Galvanised Branch + Plate size 275mm diameter,


150mm long
No 7

2/5 0.6mm Galvanised Reducer size 275mm to 200mm


diameter, 300mm long

No 5

2/6 0.6mm Galvanised Segment Bend size 200mm


diameter, 393mm long
No 1

Carried Forward R

Bill No. 2
Section No. 2 Ducting & Fittings

-61-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

2/7 0.6mm Galvanised Segment Bend size 275mm


diameter, 452mm long
No 7

2/8 0.6mm Galvanised Square to Round fitting size


200x300mm to 200mm diameter, 300mm long
No 1

2/9 0.6mm Galvanised Square to Round fitting size


300x300mm to 275mm diameter, 250mm long
No 1

2/10 0.6mm Galvanised Taper size 300x300mm x


200x300mm x 454mm long
No 1

2/11 0.6mm Galvanised Taper size 350x350mm x


300x300mm x 450mm long
No 1

2/12 0.6mm Galvanised Taper size 300x400mm x


300x300mm x 454mm long
No 1

2/13 0.6mm Galvanised Taper size 400x350mm x


350x350mm x 451mm long
No 1

2/14 0.6mm Galvanised Taper size 400x400mm x


300x400mm x 454mm long
No 1

2/15 0.8mm Galvanised Taper size 500x400mm x


400x400mm x 454mm long
No 1

2/16 0.8mm Galvanised Taper size 500x350mm x


400x350mm x 454mm long
No 1

2/17 0.8mm Galvanised Taper size 500x500mm x


500x400mm x 454mm long
No 1

2/18 0.8mm Galvanised Taper size 500x500mm x


600x600mm x 408mm long
No 1

Carried Forward R

Bill No. 2
Section No. 2 Ducting & Fittings

-62-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

2/19 0.8mm Galvanised Taper size 500x350mm x


600x600mm x 429mm long
No 1

2/20 1mm Galvanised Taper size 1600x550mm x


600x600mm x 807mm long
No 1

2/21 1mm Galvanised Taper size 1850x550mm x


600x600mm x 900mm long
No 1

Fresh Air - Straight Ducting:

2/22 0.6mm Galvanised Rectangular Straight ducting size


200x300mm
m2 3

2/23 0.6mm Galvanised Square Straight ducting size


300x300mm
m2 15

2/24 0.6mm Galvanised Square Straight ducting size


350x350mm
m2 7

2/25 0.6mm Galvanised Rectangular Straight ducting size


300x400mm
m2 4

2/26 0.6mm Galvanised Rectangular Straight ducting size


400x350mm
m2 8

2/27 0.6mm Galvanised Square Straight ducting size


400x400mm
m2 8

2/28 0.8mm Galvanised Rectangular Straight ducting size


500x350mm
m2 2

2/29 0.8mm Galvanised Square Straight ducting size


500x500mm
m2 2

Carried Forward R

Bill No. 2
Section No. 2 Ducting & Fittings

-63-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

2/30 0.8mm Galvanised Rectangular Straight ducting size


500x400mm
m2 14

Fresh Air - Round Ducting:

2/31 0.6mm Galvanised 200mm diameter Straight Seamed Pipe


m 14

2/32
0.6mm Galvanised 275mm diameter Straight Seamed Pipe
m 5

Fresh Air - Un-insulated Flexible Ducting not exceeding


1500mm, semi rigid Aluminium or PVC impregnated
heavy duty fabric, mechanically interlocked by a
corrosion resistant metal spiral helix on the outside of
the fabric, support shall be of sufficient and correct
brackets that will ensure maintenance of shape.
Excluding external insulation. All according to the
detailed specification of the Mechanical Engineer and
shall comply with local fire codes:

2/33 200mm diameter Flexible ducting


m 12

2/34 275mm diameter Flexible ducting


m 4

GENERAL SUPPLY AIR DUCTING (SHOPS 1 &


2)

Galvanised Sheet metal low pressure ducting,


insulated, suspended in ceiling voids, including all
supports, hangers, flanges, insulation, etc. all as per
the detailed specification and drawings of the
Mechanical Engineer.

Supply Air - Straight Ducting:

2/35 0.8mm Galvanised Square Straight ducting size


700x700mm
m2 1

Carried Forward R

Bill No. 2
Section No. 2 Ducting & Fittings

-64-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

GENERAL EXTRACT DUCTING (COFFEE SHOP)

Galvanised Sheet metal low pressure ducting


suspended in ceiling voids, including all supports,
hangers, flanges, etc. all as per the detailed
specification and drawings of the Mechanical
Engineer.

Extract Air - Specialized Ducting Fittings:

2/36 0.6mm Galvanised Branch + Plate size 150mm


diameter, 50mm long
No 4

2/37 0.6mm Galvanised Cap End size 300x300mm


No 1

2/38 0.8mm Galvanised Plenum Box (Top Entry) size


450x450mm, 150mm diameter, 200mm long
No 4

2/39 0.5mm Galvanised Segment Bend size 150mm


diameter, 177mm long
No 4

2/40 0.6mm Galvanised Square to Round fitting size


300x300mm to 400mm diameter, 300mm long
No 1

2/41 0.8mm Galvanised Square to Round fitting size


950x350mm to 400mm diameter, 600mm long
No 1

Extract Air - Straight Ducting:

2/42 0.6mm Galvanised Square Straight ducting size


300x300mm
m2 2

Extract Air - Round Ducting:

2/43 0.6mm Galvanised 150mm diameter Straight Seamed


Pipe
m 4

Carried Forward R

Bill No. 2
Section No. 2 Ducting & Fittings

-65-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

Extract Air - Un-insulated Flexible Ducting not exceeding


1500mm, semi rigid Aluminium or PVC impregnated
heavy duty fabric, mechanically interlocked by a
corrosion resistant metal spiral helix on the outside of
the fabric, support shall be of sufficient and correct
brackets that will ensure maintenance of shape.
Excluding external insulation. All according to the
detailed specification of the Mechanical Engineer and
shall comply with local fire codes:

2/44 150mm diameter Flexible ducting


m 2

SUNDRIES

Preparatory work:

2/45 Allow for the provision of all structural openings in walls


for the ducting installation, including the supply of all
Hardwood timber frames for all structural openings and
the making good of these openings. All as per the
drawings by the Mechanical Engineer. Item

AS-BUILT DRAWINGS, MANUALS, ETC.


2/46 Allow for the preparation of up-to-date general
arrangement drawings, shop drawings and/or any other
required drawings, together with the O&M manuals, all
to be submitted to the Mechanical Engineer for approval Item

TESTING AND COMMISSIONING


2/47 Allow for the testing and commissioning of the entire
Ducting system, ensuring that it is fully functional upon
completion of the project, all as per the requirements of
the Mechanical Engineer Item

MAINTENANCE
2/48 Allow for a 12 month Maintenance period of the entire
Ducting system, as per the specification of the
Mechanical Engineer Item

Carried Forward R

Bill No. 2
Section No. 2 Ducting & Fittings

-66-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

GENERAL
2/49 Any additional equipment not listed above, needed to
ensure a fully functional system (Addendum required
with full description and breakdown describing any costs
herein) Item

Carried to Summary R

Bill No. 2
Section No. 2 Ducting & Fittings

-67-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No

BILL NO. 12

MECHANICAL INSTALLATION

SECTION NO. 3

AIR CONDITIONING & VENTILATION

AIR DISTRIBUTION

Coffee Shop:

Disc Valves:

3/1 Complete Disc Valve (extract air),


Europair/Rickard/TROX or similar approved, size
200mm diameter, as per the specification of the
Mechanical Engineer.

No 4

Grilles:

3/2 Complete galvanised Extract Grille 4-way, with manual


multi leaf damper, Europair/TROX WG-JZ or similar
approved, size 450x450mm, as per the specification of
the Mechanical Engineer.

No 4

Weather Louvres:

3/3 Complete heavy duty galvanised sheet steel Extract Air


Weather Louvre with insect screen, TROX WG or similar
approved, size 950 x 350mm, as per the specification of
the Mechanical Engineer.
No 1

Carried Forward R

Bill No. 3
Section No. 3 Air Conditioning & Ventilation

-68-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

Shops 1 & 2:

Disc Valves:

3/4 Complete Disc Valve (fresh air), Europair/Rickard/TROX


or similar approved, size 200mm diameter, as per the
specification of the Mechanical Engineer.
No 16

3/5 Complete Disc Valve (fresh air), Europair/Rickard/TROX


or similar approved, size 250mm diameter, as per the
specification of the Mechanical Engineer.
No 7

Weather Louvres:

3/6 Complete heavy duty galvanised sheet steel Supply Air


Weather Louvre with insect screen, TROX WG or similar
approved, size 1600 x 550mm, as per the specification
of the Mechanical Engineer.
No 1

3/7 Complete heavy duty galvanised sheet steel Supply Air


Weather Louvre with insect screen, TROX WG or similar
approved, size 1850 x 550mm, as per the specification
of the Mechanical Engineer.
No 1

DX FA FAN FILTER UNITS

FA FFU:

Shops 1 & 2:

3/8 Complete dedicated Centrif FA Fan Filter Unit, G3 Pleet


600x600mm filters, System Air or similar approved. All
as per the specification of the Mechanical Engineer.
Duty: Air volume - 198 l/s

No 1

3/9 Complete dedicated Centrif FA Fan Filter Unit, G3 Pleet


600x600mm filters, System Air or similar approved. All
as per the specification of the Mechanical Engineer.
Duty: Air volume - 322 l/s

No 1

Carried Forward R

Bill No. 3
Section No. 3 Air Conditioning & Ventilation

-69-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

3/10 Complete dedicated Centrif FA Fan Filter Unit, G3 Pleet


600x600mm filters, System Air or similar approved. All
as per the specification of the Mechanical Engineer.
Duty: Air volume - 470 l/s

No 1

3/11 Complete dedicated Centrif FA Fan Filter Unit, G3 Pleet


600x600mm filters, System Air or similar approved. All
as per the specification of the Mechanical Engineer.
Duty: Air volume - 231 l/s

No 1

3/12 Complete dedicated Centrif FA Fan Filter Unit, G3 Pleet


600x600mm filters, System Air or similar approved. All
as per the specification of the Mechanical Engineer.
Duty: Air volume - 503 l/s

No 1

3/13 Complete dedicated Centrif FA Fan Filter Unit, G3 Pleet


600x600mm filters, System Air or similar approved. All
as per the specification of the Mechanical Engineer.
Duty: Air volume - 182 l/s

No 1

3/14 Complete dedicated Centrif FA Fan Filter Unit, G3 Pleet


600x600mm filters, System Air or similar approved. All
as per the specification of the Mechanical Engineer.
Duty: Air volume - 198 l/s

No 1

3/15 Complete dedicated Centrif FA Fan Filter Unit, G3 Pleet


600x600mm filters, System Air or similar approved. All
as per the specification of the Mechanical Engineer.
Duty: Air volume - 437 l/s

No 1

Carried Forward R

Bill No. 3
Section No. 3 Air Conditioning & Ventilation

-70-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

FANS

Coffee Shop:

3/16 Complete IN-LINE Extract Fan, 400mm diameter, AXIAL


or MIXVENT or similar approved. All as per the
specification of the Mechanical Engineer.
Duty: EA: 300 l/s
No 1

ATTENUATORS

Coffee Shop:

3/17 400mm diameter Sound Attenuator, 800mm long, as


per the specification of the Mechanical Engineer No 2

Carried Forward R

Bill No. 3
Section No. 3 Air Conditioning & Ventilation

-71-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

SUNDRIES

AS-BUILT DRAWINGS, MANUALS, ETC.


3/18 Allow for the preparation of up-to-date general
arrangement drawings, shop drawings and/or any other
required drawings, together with the O&M manuals, all
to be submitted to the Mechanical Engineer for approval Item

TESTING AND COMMISSIONING


3/19 Allow for the testing and commissioning of the entire Air
Conditioning & Ventilation System, ensuring that it is
fully functional upon completion of the project, all as per
the requirements of the Mechanical Engineer Item

MAINTENANCE
3/20 Allow for a 12 month Maintenance period of the entire
Air Conditioning & Ventilation system, as per the
specification of the Mechanical Engineer Item

GENERAL
3/21 Any additional equipment not listed above, needed to
ensure a fully functional system (Addendum required
with full description and breakdown describing any costs
herein) Item

Carried to Summary R

Bill No. 3
Section No. 3 Air Conditioning & Ventilation

-72-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No

BILL NO. 12

MECHANICAL INSTALLATION

SECTION NO. 4

HOT & COLD WATER INSTALLATION


(COFFEE SHOP)

Please note that the water pipe sizes indicated on the


drawings and in the Bill of Quantities will be used as
minimum internal pipe sizes as per the specification of
the Mechanical Engineer.

Cable trays will be used with Cross-Linked Polyethelene


pipes and a hanger system with Multi-Layer PEX pipes
as per the specification of the Mechanical Engineer.

EQUIPMENT

Geysers

4/1 50 Litre Under-counter Geyser (0.5kW) including all


required valves and connections, with geyser brackets
from supplier including outlet ball valve, as per the
specification of the Mechanical Engineer. No 1

HOT WATER PIPING

Class II copper pipes fixed to underside of existing


concrete slab and connected to existing pipes.
Including all other supports and accessories all as
per the Mechanical Engineer's Specification

4/2 22mm diameter HW Pipes m 20

4/3 15mm diameter HW Pipes m 5

Carried Forward R

Bill No. 4
Section No. 4 Hot & Cold Water Installation

-73-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

INSULATION TO HOT WATER PIPES

15mm Superlon Nitrile Butadiene Rubber Closed


Cell Insulation or similar approved, including UV
protected Cladding, to piping and fittings all as per
the detailed specification of the Mechanical
Engineer

4/4 15mm diameter HW Pipes m 20

VALVES, ETC.

Valves to hot water pipes as per the Mechanical


Engineer's Specification

4/5 22mm Isolating Ball Cock No 2

4/6 15mm Isolating Ball Cock No 1

COLD WATER PIPING

Class II copper pipes fixed to underside of existing


concrete slab and connected to existing pipes.
Including all other supports and accessories all as
per the Mechanical Engineer's Specification

4/7 22mm diameter CW Pipes m 20

4/8 15mm diameter CW Pipes m 5

VALVES, ETC.

Valves to cold water pipes as per the Mechanical


Engineer's Specification

4/9 22mm Isolating Ball Cock No 1

AS-BUILT DRAWINGS, MANUALS, ETC.


4/10 Allow for the preparation of up-to-date general
arrangement drawings, shop drawings and/or any other
required drawings, together with the O&M manuals, all
to be submitted to the Mechanical Engineer for approval Item

Carried Forward R

Bill No. 4
Section No. 4 Hot & Cold Water Installation

-74-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

TESTING AND COMMISSIONING


4/11 Allow for the testing and commissioning of the entire Hot
and Chilled Water systems, ensuring that it is fully
functional upon completion of the project, all as per the
requirements of the Mechanical Engineer Item

MAINTENANCE
4/12 Allow for a 12 month Maintenance period of the entire
Hot & Chilled Water system, as per the specification of
the Mechanical Engineer Item

GENERAL
4/13 Any additional equipment not listed above, needed to
ensure a fully functional system (Addendum required
with full description and breakdown describing any costs
herein) Item

Carried to Summary R

Bill No. 4
Section No. 4 Hot & Cold Water Installation

-75-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No

BILL NO. 12

MECHANICAL INSTALLATION

SECTION NO. 5

DRAINAGE INSTALLATION (PROVISIONAL)

SOIL AND WASTE DRAINAGE

HDPE Welded drainage pipes:

5/1 50mm Waste Pipes including all fittings, supports and


fixing accessories to be fixed to the underside of the
existing concrete slab m 20

5/2 50mm to 110mm Connection set No 2

AS-BUILT DRAWINGS, MANUALS, ETC.


5/3 Allow for the preparation of up-to-date general
arrangement drawings, shop drawings and/or any other
required drawings, together with the O&M manuals, all
to be submitted to the Mechanical Engineer for approval Item

TESTING AND COMMISSIONING


5/4 Allow for the testing and commissioning of the entire
Drainage Installation, ensuring that it is fully functional
upon completion of the project, all as per the
requirements of the Mechanical Engineer Item

MAINTENANCE
5/5 Allow for a 12 month Maintenance period of the entire
Drainage system, as per the specification of the
Mechanical Engineer Item

GENERAL
5/6 Any additional equipment not listed above, needed to
ensure a fully functional system (Addendum required
with full description and breakdown describing any costs
herein) Item

Carried to Summary R

Bill No. 5
Section No. 5 Drainage Installation

-76-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No

BILL NO. 12

MECHANICAL INSTALLATION

SECTION NO. 6

FIRE PROTECTION INSTALLATION

SPRINKLER SYSTEM

Galvanised Mild Steel piping, including all fittings,


anchors, bolts, rods and all other supports
necessary to fix piping to the underside of the
existing concrete slab, as per the details of the
Mechanical Engineer

6/1 25mm diameter pipes m 79

6/2 32mm diameter pipes m 58

6/3 40mm diameter pipes m 30

Sprinklers

6/4 Installation of brass below ceiling type fire sprinklers,


rating and positioned so that it is not obstructed by ducts
and the like, with a 4m radius spray. All as per the
specification of the Mechanical Engineer and strictly as
per the required standards stated in SANS 10400. No 36

PORTABLE FIRE FIGHTING EQUIPMENT

Fire extinguishers

6/5 4.5kg DCP Fire Extinguisher including wall bracket


plugged to brickwork or concrete, as per the
specifications of the Mechanical Engineer No 8

Carried Forward R

Bill No. 6
Section No. 6 Fire Protection Installation

-77-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

SIGNAGE

Fire signage

6/6 Allow for the installation of all required photoluminescent


symbolic fire signage to indicate correct fire escape
routes and fire fighting equipment, all as per the
drawings and specification of the Mechanical Engineer Item

SUNDRIES
6/7 Allow for the registration with ASIB and the provision of
an ASIB certificate, certifying that the sprinkler
installation is installed as per the required standards, as
specified by the Mechanical Engineer. Item

AS-BUILT DRAWINGS, MANUALS, ETC.


6/8 Allow for the preparation of up-to-date general
arrangement drawings, shop drawings and/or any other
required drawings, together with the O&M manuals, all
to be submitted to the Mechanical Engineer for approval Item

TESTING AND COMMISSIONING


6/9 Allow for the testing and commissioning of the Fire
Protection Installation, ensuring that it is fully functional
upon completion of the project, all as per the
requirements of the Mechanical Engineer Item

MAINTENANCE
6/10 Allow for a 12 month Maintenance period of the entire
system, as per the specification of the Mechanical
Engineer Item

GENERAL
6/11 Any additional equipment not listed above, needed to
ensure a fully functional system (Addendum required
with full description and breakdown describing any costs
herein) Item

Carried to Summary R

Bill No. 6
Section No. 6 Fire Protection Installation

-78-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

FINAL SUMMARY
Bill Page Amount
No No

BILL NO. 12 MECHANICAL INSTALLATION


1 Section No. 1 General 60

2 Section No. 2 Ducting & Fittings 67

3 Section No. 3 Air Conditioning & Ventilation 72

4 Section No. 4 Hot & Cold Water Installation 75

5 Section No. 5 Drainage Installation 76

6 Section No. 6 Fire Protection Installation 78

Value of Builder's work R

Value Added Tax (14%) R

Total Contract Sum


R

Carried to Form of Tender R

-79-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 13
PAINTWORK
PREAMBLES

For Preambles refer to "Standard Preambles to all trades -


2008"

SUPPLEMENTARY PREAMBLES

Proprietary items or materials

Proprietary items or materials where specified are to be of the


brand specified - or other approved - by the ACSA

SABS Specifications

Matt or eggshell decorative paint for interior works : SABS 515

High gloss enamel paint : SABS 630 Grade I

Oil gloss enamel paint : SABS 631

Primers for wood for external work : SABS 678 Type I

Primers for wood for internal work : SABS 678 Type III

Zink chromate primers for steel : SABS 679 Type I

Undercoats for paints (except emulsion paint) : SABS 681 Type


I

Aluminium paint : SABS 682 Grade II

Roof paints : SABS 683 Type B

Structural steel paint : SABS 684 Type B

Wash primer (metal etch) : SABS 723

Varnish for interior use : SABS 887 Type I

Emulsion paints : SABS 1586

Carried Forward R
Paintwork

-80-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

CPAP WORK GROUP

Unless otherwise stated all items in this bill will be Work Group
152

PAINTWORK, ETC TO NEW WORK

One coat "Plascon Merit" universal undercoat and two


coats "Wall & All" emulsion paint:

1 On internal walls m2 963

ON FIBRE CEMENT

One coat "Plascon Merit" universal undercoat and two


coats "Wall & All" emulsion paint:

2 On ceilings and bulkheads m2 371

ON GALVANISED STEEL

Scrub down with "Plascon Galvanised Iron Cleaner (GIC


1)", one coat "Galvogrip Metal Primer (GIP1)", and two
coats "Plascon Super Universal Enamel" paint

3 On plates m2 10

4 On columns m2 87

5 On beams and rafters m2 373

6 On purlins, girts and bracing m2 239

7 On expanded metal grids m2 91

ON WOOD
Knot, stop, prepare and apply two coats timber undercoat
and two coats "Plascon Polvin Enamel" paint

8 On doors m2 35

Carried Forward R
Paintwork

-81-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

PAINTWORK, ETC TO PREVIOUSLY PAINTED


WORK

ON FLOATED PLASTER SURFACES

Clean down, etc. and apply two coats "Plascon Wall & All"
emulsion paint

9 On internal walls or concrete columns m2 17

Carried to Summary R
Paintwork

-82-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 2
BILL 14
PROVISIONAL SUMS
NOMINATED OR SELECTED SUB-CONTRACTS

Separate tenders will be called for by the Employer (the


employer will consult the main contractor with regards to
selected sub-contracts) for the services listed below and it will
be required from the Contractor to enter into NOMINATED
SUB-CONTRACTS OR SELECTED SUB-CONTRACT wih
successful Tenderers based on the NET tender sums.

Note:

All Provisional Sums are net.

PROFIT

Against the item "Profit", the Contractor must allow for whatever
profit, if any, he requires on the relevant provisional sum. The
profit will be adjusted on the full amount payable to the
Nominated Sub-Contractor according to his sub-contract with
the Contractor.

ATTENDANCE

See Clause 9 of Preliminaries.

Attendance shall further be deemed to include that the


Contractor must allow for co-ordinating the work, co-operating
to the fullest extent with all parties concerned and for general
attendance on Nominated Sub-Contractors in the execution of
their various services as further described below.

The amount allowed for attendance will remain fixed unless the
Scope of Work is altered in which event the amount allowed will
be adjusted according to the variation in Scope of Work, based
on the original allowance.

CONNECTION TO EXISTING SERVICES

1 Provide the sum of R 200 000.00 (Two Hundred Thousand


Rand) for connection to existing services complete Item

2 Profit Item

Carried Forward R
Provisional Sums

-83-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

3 Attendance Item

PROMOTION FLOOR AREA

4 Provide the sum of R 35 000.00 (Thirty-Five Thousand Rand)


for raised promotion floor area size approximately 4000mm
long x 3500mm wide complete Item

5 Profit Item

6 Attendance Item

MOBILE KIOSKS

7 Provide the sum of R 700 000.00 (Seven Hundred Thousand


Rand) for four (4) mobile kiosk units complete Item

8 Profit Item

9 Attendance Item

WATER FEATURE

10 Provide the sum of R 100 000.00 (One Hundred Thousand


Rand) for water feature complete Item

11 Profit Item

12 Attendance Item

FLIGHT INFORMATION DISPLAY PYLONS

13 Provide the sum of R 50 000.00 (Fifty Thousand Rand) for flight


information display pylons complete Item

14 Profit Item

15 Attendance Item

BUMPER RAILS

16 Provide the sum of R 20 000.00 (Twenty Thousand Rand) for


bumper rails complete Item

17 Profit Item

18 Attendance Item

Carried Forward R
Provisional Sums

-84-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

SIGNAGE

19 Provide the sum of R 90 000.00 (Ninety Thousand Rand) for


signage complete Item

20 Profit Item

21 Attendance Item

SECURITY ACCESS PERMITS

22 Provide the sum of R 30 000.00 (Thirty Thousand Rand) for


security access permits complete Item

23 Attendance Item

Carried to Summary R
Provisional Sums

-85-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Item Quantity Rate Amount


No
SECTION 3
BILL NO. 15
TENANT INSTALLATIONS:
EXCLUSIVE BOOKS COFFEE SHOP
For preambles see "Model Preambles for Trades"

SUPPLEMENTARY PREAMBLES

The SUPPLEMENTARY PREAMBLES in the previous Bills and


Sections, apply equally to this Bill and Section

MASONRY
CPAP WORK GROUP 116

Brickwork of NFP bricks

1 Half brick walls m2 2

ROOF COVERINGS, ETC

CPAP WORK GROUP 125

"Safintra" 0.8mm thick "Saflok 700" concealed fix


aluminium roof sheeting and accessories with "G4
Colortech" finish on one side and protective primer
coating on the reverse side fixed to steel purlins or rails
spaced at 1340mm centres. All sheeting is to be clearly
marked on the reverse side at one-metre intervals
indicating thickness, material quality, coating thickness
and paint system.

2 Roof covering with pitch not exceeding 10 degrees m2 32

Carried Forward R
Tenant Installations: Exclusive Books Coffee Shop

-86-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

CARPENTRY AND JOINERY

CPAP WORK GROUP 126

Sink cupboards, worktops, etc.

3 U-Shaped kitchen floor cupboard 9425mm girth extreme x


600mm wide x 900mm high, with sides, bottom, divisions, one
shelf, back, doors and drawers with a "Rustenburg" granite top
9425mm long x 600mm wide with bevelled edge including an
opening to fit sink size 1100 x 500mm wide (sink elsewhere) No 1

4 L-Shaped kitchen floor & bar counter unit 6300mm girth


extreme x 900mm wide overall, consisting of floor cupboard
unit 450mm wide x 700mm high with raised bar counter 450mm
wide x 1100mm high, with sides, bottom, divisions, one shelf,
back, doors and drawers with "Rustenburg" granite tops to both
kitchen and bar counters 6300mm long x 450mm wide with
bevelled edges No 1

5 Kitchen island floor cupboard unit 600mm wide x 900mm high


and 2000mm long, with sides, bottom, divisions, one shelf,
back and 4 doors with a "Rustenberg" granite top 2000mm long
x 600mm wide with bevelled edge No 1

6 Bar stools to Tenant approval No 8

7 Tables size 1100mm long x 1100mm wide to Tenant approval No 9

8 Back rest chairs to Tenant approval No 36

CEILINGS

CPAP WORK GROUP 129

BULKHEADS
12.5mm Gypsum plasterboard with 63mm wide strips of
mesh scrim nailed over joints and the finished with
gypsum skim plaster trowelled to a smooth polished
surface to the thickness recommended by the
manufacturer

9 Horizontal bulkheads 900mm wide x 846mm deep, including


galvanised steel sub-frames m 15

Carried Forward R
Tenant Installations: Exclusive Books Coffee Shop

-87-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

10 Extra over horizontal bulkheads for opening for light fittings


(elsewhere) No 14

11 Extra over horizontal bulkheads for opening for fire sprinkler


fittings (elsewhere) No 6

PARTITIONS ETC

CPAP WORK GROUP 138

"GypWall Firestop 51/F30S39" steel stud partitioning


complete with 1 layer of 12.5mm thick "Gyproc Firestop"
on both sides

12 Partitioning 350mm high with bottom and top tracks fixed to


structural steel framework m 8

13 Partitioning 3.50m high with bottom track plugged and top track
fixed to ceiling m 13

14 Extra over partition 3.50m high for vertical abutment No 8

STRUCTURAL STEELWORK

CPAP WORK GROUP 134

Welded columns in single lengths with flat section base,


tops, bearers and connection plates bolted to concrete and
steel

15 100 x 100 x 5mm Thick square hollow section column kg 311

Welded beams in single lengths with flat section bearer


and connection plates bolted to columns

16 IPE 200 I-section beam kg 941

Cleats, brackets, etc

17 250 x 250 x 12mm Base- and topplates kg 34

Purlins and girts welded to steel

18 100 x 50 x 20 x 2,5mm Lipped channel section purlins t 0.15

Carried Forward R
Tenant Installations: Exclusive Books Coffee Shop

-88-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

Sundries

19 Steelwork in base plates , connector plates, cleats, etc.


(Provisional) kg 60

Hot Dipped Galvanised bolts to trusses, etc.

20 M16 Hilti HIT-Z chemical anchor bolts 200mm long including


HILTI HY 200A epoxy No 24

21 M10 Diameter grade 8.8 bolts No 240

PLASTERING

CPAP WORK GROUP 142


Screeds on concrete

22 25mm Thick on floors and landings m2 56

Cement plaster (4:1 mix) 12mm thick steel-troweled on


brickwork to smooth finish

23 On walls m2 4

24 On narrow widths m2 0.3

TILING

CPAP WORK GROUP 144

Porcelain wall tiles Prime Cost R 300.00/m2 fixed with


adhesive to concrete floor or screed (power floating or
screed elsewhere) and flush pointed with tinted waterproof
jointing compound

25 On walls m2 10

Porcelain floor tiles Prime Cost R 300.00/m2 fixed with


adhesive to concrete floor or screed (power floating or
screed elsewhere) and flush pointed with tinted waterproof
jointing compound

26 On floors and landings m2 56

Carried Forward R
Tenant Installations: Exclusive Books Coffee Shop

-89-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

PLUMBING AND DRAINAGE

CPAP WORK GROUP 148

Sanitary Fittings

27 Stainless steel double sink complete including waste union,


trap, taps or mixer and stopvalves at a prime cost of R8,000.00 No 1

Electric Water Heaters

28 15 Litre "Stiebel Eltron" under counter wall mounted electric


water boiler, code SHC-15 including supply pipes, stopvalves
and electrical power point at a prime cost of R9,000.00 No 1

PAINTWORK

CPAP WORK GROUP 152

One coat "Plascon Merit" universal undercoat and two


coats "Wall & All" emulsion paint:

29 On internal walls m2 100

One coat "Plascon Merit" universal undercoat and two


coats "Wall & All" emulsion paint:

30 On ceilings and bulkheads m2 53

Scrub down with "Plascon Galvanised Iron Cleaner (GIC


1)", one coat "Galvogrip Metal Primer (GIP1)", and two
coats "Plascon Super Universal Enamel" paint

31 On plates m2 1

32 On columns m2 9

33 On beams and rafters m2 34

34 On purlins, girts and bracing m2 17

SIGNAGE

35 Provide the sum of R10,0 000,00 (Ten Thousand Rand) for


signage complete Item

36 Profit Item

Carried Forward R
Tenant Installations: Exclusive Books Coffee Shop

-90-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures

Brought Forward R

37 Attendance Item

Carried to Summary R
Tenant Installations: Exclusive Books Coffee Shop

-91-
King Shaka International Airport
ACSA KS15/02/RU
Retail Renovations to Domestic Departures
Section
Bill No. Page No Amount
No.

FINAL SUMMARY

1 1 Preliminaries -31-

2 2 Alterations -36-

3 Roof Coverings -37-

4 Ceilings, Partitions & Access Flooring -40-

5 Floor Coverings, Plastic Linings, etc -41-

6 Ironmongery -43-

7 Structural Steelwork -46-

8 Metalwork -51-

9 Plastering -52-

10 Tiling -54-

11 Electrical Work -59-

12 Mechanical Work -79-

13 Paintwork -82-

14 Provisional Sums -85-

Sectional Summary R
3 15 -91-
Tenant Installations: Exclusive Books Coffee Shop

Sub-Total R

CONTINGENCIES
Provide the sum of R100,000.00 (One Hundred
Thousand Rand) for contingencies to be used at the
discretion of the Architect and deducted in part or in
whole if not required. 100 000.00

Value Added Tax (VAT) R

Carried to Form of Tender R

-92 -