PT ARUNA CAHAYA PRATAMA

ABOUT US Ground
Rooftop Floating PV
Mounted
ARUNA PV covers the electricity
generation sector, specifically
Photovoltaics and solar energy. It
is a subsidiary of MAVEN
ADVANCE VENTURE, a solution
provider and developer in
renewable energy in Salim Group.
ARUNA PV builds on the
expertise of its people, its
engineering skills, and its
experience in developing a
business. ARUNA PV brings the
right people with proven know
how to deliver the right solution.
Promote Green & Deduct Your Electricity Bills End-to-end renewable
Sustainable Image No Start-up Cost solutions

Why work with Aruna PV?


Our Business Model

Build Own Operate


(BOO) Scheme

ARUNA PV CLIENT
PROVIDE SUPPORT

Invest
Engineering, Rooftop / Ground
Procurement, Space
Construction (EPC)
PV Fee*
Operation &
Maintenance
*PV Fee is calculated from the amount of
electricity utilized times a special rate from
Client’s recurring electricity rate. Deduction
can be determined once PLN Tariff and PV
size is known.
How’s our On-Grid
The PV system is designed to Solar Photovoltaic (PV)
operate in parallel with the grid.
work?
The electricity produced by the PV
system will be utilized firstly to fulfil
the load demand.

The grid will be set to make up


when the load demand is higher PV System Existing electricity
than what the PV system produce. source

In case of excess PV production, Load

the electricity can also be exported


back to the grid.
Our Equipment's and System

Weather Station to Remote monitoring


collect weather of the PV system
conditions

Weather
condition

Weather Station Remote Monitoring

kWh meter

DC Electricity AC Electricity

Solar Module Inverter Protection unit Grid

Solar module Inverter inverts DC Protection (breaker, Client Grid transfers


converts light electricity into AC fuses, surge electricity into the
photons from the electricity protection) to control, energy demand
sun into DC protect and isolate the
electricity electrical components
What We Offer?

Insurance
Lower from existing
Equipment will be insured
electricity rate by Aruna PV
Reduce your energy billing

Agreement Period Taxes


20 years from Commercial Accordance with applicable tax
regulation
Operation Date (CoD)

Customer Service
Available on call basis, Developing
Billing period other online features, including
On the 1st of every month online support services, Billing
Monitoring & Online monitoring
through Maven’s portal
Our Operation & Maintenance

Technical General
Maintenance Maintenance

Visual inspection*
General site cleaning and
Equipment inspection & maintenance**
troubleshooting *** Notes :
Panel and equipment * At least 6 months
** At least 1 year
Preventive Maintenance* cleaning**
*** By call per ticketing/
case
Corrective
Maintenance*** Water provide by client
during the cleaning
process and electricity
during installation.
Type of Insurance

PROPERTY PUBLIC
MACHINERY LIABILITY
ALL RISK
BREAKDOWN INSURANCE
INSURANCE
Covering physical loss All sums which the Insured
INDONESIAN destruction or damage to all
real and personal tangible
Covering physical loss
destruction or damage to all
shall become legally liable to
pay for compensation and all
STANDARD property of whatsoever kind
except as hereinafter
real and personal tangible
property of whatsoever kind
cost and expenses of
litigation arising out of
EARTHQUAKE excluded as now existing or
hereinafter acquired in any
except as hereinafter
excluded as now existing or
accidental bodily injury

INSURANCE form the insured own, held in hereinafter acquired in any


and/or accidental property
damage sustained by third
trust or on commission or for form the insured own, held parties including but not
which the insured may be in trust or on commission or limited to the
liable or responsible or have for which the insured may visitors/tourist/tenants
accepted responsibility or in be liable or responsible or arising out of operation of
which the insured has an have accepted responsibility the insured and/or any
insurable interest. or in which the insured has person in the Insured’s
an insurable interest. service while engaged in the
Insured business or trade.
EPC TIMELINE

ENGINEERING &
FEASIBILITY STUDY PROCUREMENT CONSTRUCTION

1st Month 2nd Month 3rd Month 5th Month

Agreement Technical Detailed Logistic Construction to COD: 2 months*


Preliminary
Site Visit Process Site Visit Engineering
Design

*subject to project size and condition


Legal Basis

Power Plant
Parallel Operations
with PLN Electricity
lines Permit Utilization
Required and Permit
Dir. PLNR No.
0733.K/DIR/2013 MEMR No. 49/2018 MEMR No. 16/2019

2013 2017 2018 2019 2019 2021

MEMR No. 01/2017 MEMR No. 13/2019 MEMR No. 26/2021

Utilization of Utilization of Parallel Fee


Solar PV Rooftop Solar PV Revision
Electricity by by PLN
PLN consumers consumers
Izin Usaha Jasa Konstruksi
Our Legal (IUJK)

Documents
No. Surat 76/C.31.7/31.74.02.1004.02.012.
K.1.a.b/2/-1.785.56/e/2020
Klasifikasi Bidang Usaha Menengah

Izin Usaha Jasa Penunjang


Tenaga Listrik (IUJPTL)
No. 3/IUJPTL/OSS/2020
• Pembangun dan Pemasangan
Instalasi Penyedia Tenaga Listrik.
No. SBU 2564.01.L19
• Pemeliharaan Instalasi Tenaga
Listrik No. SBU 0279.01.B20
• Pengoperasian Instalasi Tenaga
Listrik No. SBU 0220.01.B20
Operating Projects

2018
PT Wahyu Abadi (200kWp),
a rooftop PV to supply the energy
requirements for the printing and
packaging factory
2019
Indomaret Pramuka (11.8kWp +
23kWp), pilot project within
Indomarco Prismatama Group

Residential (14.5 kWp), rooftop PV


systems to supply the energy
requirements for daily housholds

2020
Bulan Hybrid PV-DG-Biogas (560 kWp), a
hybrid between PV, DG and Biogas for
electricity supply on an agriculture farm to
reduce the consumption of existing Diesele
Genset
2021
Indomaret Tangerang (96 kWp across 8
outlets), rooftop PV systems to supply the
energy requirements for the
daily operation of the stores

Indomaret Utan Kayu 1 (35 kWp),


rooftop PV systems to supply the
energy requirements for
the daily operation of the stores

Tamaris Hydro T Station (12.8 kWp), a


rooftop PV utilizing a canopy to supply the
energy requirements for Tamaris Hidro Head
Office, a renewable energy company.
Intiland Development (24 kWp),
Serenia Club Mansion a pilot
project with a potential of
expansion within Intiland Group

Quickprint Indonesia (78 kWp)


a rooftop PV to supply the
energy requirements for the
factory of corporate digital
printing company.
Cosmax Indonesia (604 kWp) a
rooftop PV to supply the energy
requirements for Cosmax Indonesia,
an ODM for skincare and color
cosmetic products manufacturer.

Batamindo Investment
Cakrawala (470 kWp),
a rooftop PV to reduce
Powerhouse auxiliary
consumption, a pilot project with
expansion potential towards the
tenant within the industrial
estate.
Hamatetsu Indonesia (695 kWp) a
rooftop PV to supply the energy
requirements for a manufacturing
engine and body parts for 2-wheel
and 4-wheel vehicles and general-
purpose vehicles.
Mitrametal Perkasa (1,553 kWp) a
rooftop PV to supply the energy
requirements for an automotive
components company, with OEM
company customers for vehicle
products.

On-Going Construction 2022

Astra Honda Motors (8,259 kWp)


a rooftop PV to supply the
energy requirements for Astra
Honda Motors, a transportation
manufacturing company.

Bintan Resort Cakrawala (4,000


kWp) ground PV project will be a
landmark for Salim Group at its
renowned Resort in Bintan Island.
Sanghiang Perkasa (1,603 kWp),
a rooftop PV to supply the energy
requirements for Sanghiang
Perkasa, a farmaceutical company.

Project Pipeline 2022


Indopoly Swakarsa Industry (3,000
kWp)
a rooftop PV to supply the energy
requirements for Indopoly, a plastic
processing company.

Prysmian Cable Indonesia (2,000


kWp)
a rooftop PV to supply the energy
requirements for Prysmian, a well
known cable manufacturing
company.
Indofood Ingredients (334 kWp)
a rooftop PV to supply the energy
requirements for ingredients
factory, manufacturing Indomie
Noodle Ingredients

KFC (16 kWp + 18 kWp)


a rooftop PV to supply the energy
requirements for restaurant
outlet in Cinere and Mayor O
King.

Indofood Corrugated Packaging


(1,230 kWp), a rooftop PV to supply
the energy requirements for
Indofood Packaging, manufacturing
corrugated packaging for Indofood
…and many more
Let’s Talk!
Main Address
Gedung Setiabudi Atrium Lt. 4, Suite 403
Jl. HR Rasuna Said Kav. 62
Jakarta 12920

Contact Person :
Novitawati
Head of Sales & Marketing
+62 856-9460-0782 / novitawati@mavmaven.com

Alvan Hidayat
Head of Project and Operations
+62 812-1666-5345 / alvan.hidayat@mavmaven.com

Edward Soelistio
Head of Business Development
+62 818-0809-3005 / edward@mavmaven.com
Thank you!

WE'RE EXCITED TO WORK WITH


YOU

You might also like