Equipment Severity
Item Detail of Activity /Tools used Risks Involved Preventive Measures Responsible Person Rating
1 Installation of flood lights at top EWP/CHERRY 1. Equipment/Crane Crane must be thoroughly inspected by E&P and fit for the job 1. I/C E & P 4
of poles at a ht. of 60 ft. using PICKER CRANE, failure. The crane must have a valid third party certification 2. HSE Personnel
EWP (elevated work platform). PLIERS Daily Checklist 3. Area Incharge
FLOOD LIGHTS Certified slings/shackles 4.Operator of
/SEARCH LIGHTS Compaction/placement of metallic plates in case soil is soft. Equipment
2. Inexperienced and The crane to be operated by trained/competent & qualified 4
unconcerned personnel. operators only.
2 Light Installation at poles of CHERRY PICKER 3. Danger of collision/ A flag-man to be present. 1. I/C E & P 4
height 60 ft CRANE accident. The working area to be roped/cordoned off and barricaded, 2. HSE Personnel
indicating that men and equipment are at work. 3. Area Incharge
Targetted safety Talk of rapid lift and crane operator/rigger. 4.Operator of
Area supervisor to be present during parallel operation of rapid lift Equipment
and crane.
4. Danger from falling All tools or equipment at the elevated platform to be properly 3
tools or equipment. tied down & ensure they do not fall.
Ensure safety helmets with chin straps.
Pole to be guy wired

Severity Rating: (1) First Aid/Minor Property Damage (2) Recordable Accident/Property Damage
(3) Lost Time Accident/Major Property Loss (4) Catastrophic Accident

What am I going to do? How am I going to do? What are the risks? How do I control risks? Is risk too high?

AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE

This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly
prohibited. © Copyrights Ordinance 2002, All rights reserved.
Doc. No.: HSE/FRM-22
Rev.: 01
JOB SAFETY ANALYSIS Date: JUL 23, 05
Page: 1 of 1

Project: ECPL Area: Plant Area PPEs Required: Safety Harness, Safety Goggles, Safety Gloves, Safety Shoes, Safety
Date: 31-12-2007 Supervisor: Farrukh Shah Helmet With Chin Straps
Equipment Severity
Item Detail of Activity /Tools used Risks Involved Preventive Measures Responsible Person Rating
3 Electrical Connection to the 5. Danger of electrocution Remove the main electrical breaker supplying power to the 1. Vehicle Operator 4
Pole pole and put a tag "MEN WORKING DO NOT OPERATE" 2. HSE Personnel
3. Area Incharge
6. Fire Hazard Place Fire Extinguisher. 1. Vehicle Operator 4
7. Men falling from the Men in the basket to use safety harness-properly anchored. 2. HSE Personnel 4
cradle/basket 3. Area Incharge
8. Electrocution due to Check for any over-head elect. Conductors. Maintain a min. 1. Vehicle Operator 4
over-head elect.cond- distance of 10 ft. from the cables for voltages upto 50 kv. 2. HSE Personnel
uctors. Add 1 cm. for every kv over and above 50 kv. 3. Area Incharge
9. Danger of rolling/tilting Place the crane on level surface and chocks under 1. Vehicle Operator 4
and tiping of elevated the wheels. 2. HSE Personnel
platform/machine 3. Area Incharge
10. Crane/Equipment Never Exceed the Crane Rated Lifting Capacity at specific 4
Failure Due To angle of boom. Label Maximum allowable load (225 Kg) at
Overloading. the cage of rapid lift (Load at maximum allowable height)

Severity Rating: (1) First Aid/Minor Property Damage (2) Recordable Accident/Property Damage
(3) Lost Time Accident/Major Property Loss (4) Catastrophic Accident

What am I going to do? How am I going to do? What are the risks? How do I control risks? Is risk too high?

AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE

This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly
prohibited. © Copyrights Ordinance 2002, All rights reserved.
Doc. No.: HSE/FRM-22
Rev.: 01
JOB SAFETY ANALYSIS Date: JUL 23, 05
Page: 1 of 1

Project: ECPL Area: Plant Area PPEs Required: Safety Harness, Safety Goggles, Safety Gloves, Safety Shoes, Safety
Date: 31-12-2007 Supervisor: Farrukh Shah Helmet With Chin Straps
Equipment Severity
Item Detail of Activity /Tools used Risks Involved Preventive Measures Responsible Person Rating
4 DEMOBILISATION - Remove
any left over materials and
maintain good housekeeping.

Severity Rating: (1) First Aid/Minor Property Damage (2) Recordable Accident/Property Damage
(3) Lost Time Accident/Major Property Loss (4) Catastrophic Accident

What am I going to do? How am I going to do? What are the risks? How do I control risks? Is risk too high?

AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE

This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly
prohibited. © Copyrights Ordinance 2002, All rights reserved.
JOB SAFETY ANALYSIS

Project: ECPL Area: Plant Area PPEs Required: Safety Harness, Safety Goggles, Safety Gloves, Safety
Date: 31-12-2007 Supervisor: Farrukh Shah Helmet With Chin Straps
Equipment
Item Detail of Activity /Tools used Risks Involved Preventive Measures
3 Electrical Connection to the 4. Danger of electrocution Remove the main electrical breaker supplying power to th
Pole pole and put a tag "MEN WORKING DO NOT OPERATE

5. Fire Hazard Place Fire Extinguisher.


6. Men falling from the Men in the basket to use safety harness-properly anchore
cradle/basket
7. Electrocution due to Check for any over-head elect. Conductors. Maintain a m
over-head elect.cond- distance of 10 ft. from the cables for voltages upto 50 kv.
uctors. Add 1 cm. for every kv over and above 50 kv.
8. Danger of rolling/tilting Place the crane on level surface and chocks under
and tiping of elevated the wheels.
platform/machine
9. Crane/Equipment Never Exceed the Crane Rated Lifting Capacity at specifi
Failure Due To angle of boom. Label Maximum allowable load at the cag
Overloading. rapid lift (Load at maximum allowable height)

Severity Rating: (1) First Aid/Minor Property Damage (2) Recordable Accident/Property Damage
(3) Lost Time Accident/Major Property Loss (4) Catastrophic Accident

What am I going to do? How am I going to do? What are the risks?

AREA ENGINEER / SUPERVISOR


Doc. No.: HSE/FRM-22
Rev.: 01
ETY ANALYSIS Date: JUL 23, 05
Page: 1 of 1

Harness, Safety Goggles, Safety Gloves, Safety Shoes, Safety

Severity
Preventive Measures Responsible Person Rating
Remove the main electrical breaker supplying power to the 1. Vehicle Operator 4
pole and put a tag "MEN WORKING DO NOT OPERATE" 2. HSE Personnel
3. Area Incharge
Place Fire Extinguisher. 1. Vehicle Operator 4
Men in the basket to use safety harness-properly anchored. 2. HSE Personnel 4
3. Area Incharge
Check for any over-head elect. Conductors. Maintain a min. 1. Vehicle Operator 4
distance of 10 ft. from the cables for voltages upto 50 kv. 2. HSE Personnel
Add 1 cm. for every kv over and above 50 kv. 3. Area Incharge
Place the crane on level surface and chocks under 1. Vehicle Operator 4
2. HSE Personnel
3. Area Incharge
Never Exceed the Crane Rated Lifting Capacity at specific 4
angle of boom. Label Maximum allowable load at the cage of
rapid lift (Load at maximum allowable height)

(2) Recordable Accident/Property Damage


(4) Catastrophic Accident

How do I control risks? Is risk too high?

HSE REPRESENTATIVE

You might also like