5 RCC Facia & Band Cum. 2 11.5 49.63 3 66.13 12850 849770.5 500 33065
6 Fly Ash Brick Work Cum. 41.04 184.00 225.04 5800 1305232
7 AAC Block Work 9" Cum. 25.0 46.0 231.0 302.0 5100 1540200 500 151000
8 AAC Block Work 4.5" Sqm. 402 20 422 775 327050 500 21100
9 VACCUM DEWATERING Cum. 6.00 23.00 75.00 376.8 480.8 6800 3269440
10 VACCUM DEWATERING Sqm. 60.00 230.00 750.00 1884.00 2924.00 180 526320
11 IPS floor Sqm. 100.00 100.00 100.00 150.00 450.00 564 253800
13 Gypsum Plaster Work Sqm. 1037 9922 10959.00 345 3780855 45 49315.5