WG-MST-0008 2nd Floor Column Works at Halim Station R2
WG-MST-0008 2nd Floor Column Works at Halim Station R2
We have already completed the Master Construction Program for 2nd Floor Column of
Halim Station Works (DAK 10+803.29 – DK 00+750.00), and it has been reviewed and
approved by our technical responsible person, please review it.
2
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
We have already completed the Master Construction Program for 2 nd Floor Column of
Halim Station Works (DAK 10+803.29 – DK 00+750.00), and it has been reviewed and
approved by our technical responsible person, please review it.
CM :
Principal :
Date :
Notes : 4 hard Copies needed, each 1 for Project Team, CM, CDJO and KCIC
For Master Construction Program (Project Team level) and Special Construction Plan
Review and Approval.
3
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
Project
Contractor WIKA Column
Scope
Name of Master Method Statement of 2nd Floor Column of Halim Station Works
Construction Program (DAK 10+803.29 – DK 00+750.00)
To CDJO:
The master construction program prepared by us has been completed. Please review.
4
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
Table of Contents
5
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
- Preparation Work
- Rebar Assembling
- Formwork Installation
- Casting Concrete
6
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
7
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
3. TEMPORARY FACILITIES
To start construction work, supporting facilities need to be prepared first. This supporting
facility will be used to supply construction material needs. The supporting facilities that
we have prepared are temporary facilities, following lay out of Temporary Facilities.
Temporary
Facilities
- Rebar Workshop
Rebar workshop is a place to produce reinforcement for column, beam, slab, and
others for station building. This facility is equipped with bar bending and bar cutter.
- Formwork Workshop
Formwork workshop is a place to produce formwork for column, beam, slab, and
others for station building.
- Material Stockyard
Material stockyard is a place to stock the material needed such as rebar, plywood
and PCH for formwork, etc.
- Storehouse
Storehouse is a place to store equipments and logistics.
- Site Office
Site office is a place to carry out supervision, work control, and administration of the
project.
8
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
START
Rebar Assembling
Formworks Installation
Casting Concrete
Formwork Removal
Curing Concrete
Concrete Casting
Formwork Removal
Curing Concrete
FINISH
9
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
17
1
15 13 11 9 7 5 3 1
9
2
18 16 14 12 10 8 6 4 2
0
The work of column started from grid 18-17 F, E, D then continued at grid 18-17 C, B, A
this cycle continues until grid 2-1. After grid 2-1 C, B, A are finished, grid 19 can be done
with the same sequence.
b. Preparation Work
Checking approval drawing & Bar Bending Schedule
- We must check the approved drawing & bar bending schedule before
cutting the rebar
- We should be check the column rebar as works sequence
- The labour must be wear safety shoes, safety helm, reflector vest, &
gloves before fabrication the rebar
Survey Work / Determine the column border line.
- Checking of coordinate of grid column
- Determine the column border line based on approved drawings. Also, the
surveyor need checking the column border line.
Install barrier from concrete brick around the column as height as one layer
to keep the cleanliness of the column.
Install scaffolding as a platform for the labour. The scaffolding will be check
by scaffolding inspector and will be sign a green tag before to use.
10
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
c. Formwork Fabrication
Panel Cutting
- Cutting the panel as per dimension based on drawing.
Steel Cutting
- Cutting the steel using circulaw saw, ensure the length of frame is as
per drawing.
11
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
- Ensure the worker is wear the gloves, safety goggles, safety helmet and
safety shoes.
Steel Assembling
- Assembling the UNP using welding joint, check the squareness of
horizontal beam.
- Then assembling the vertical beam to horizontal beam.
Formwork Assembling
- Install the panel to the steel formwork by screw it into the vertical beam.
- Check the squareness of formwork
- Ensure the inside of formwork is flat
12
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
Painting
- Apply the zinc chromate painting around steel surface.
- After the zinc chromate paint has been applied, then continue to apply
finish painting to the steel surface.
- The painting work is using a spray painting or a roller brush.
Phenolic t=18mm
Hollow 100.50.3
UNP 100.45.6
13
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
14
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
Option 1 Option 5
Option 2
Option 3
Option 4
15
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
Rebar
Pile Cap
16
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
e. Formwork Installation
Multiplywood thk.18 mm will be used for column formwork. Steel tie rod, hollow
steel & support will be applied for supporting system.
KAPASITAS LIFTING JIB 60M = 2,4 TON (Max Tip Load) KAPASITAS LIFTING JIB 75M = 2,5 TON (Max Tip Load) KAPASITAS LIFTING JIB 65M = 2 TON (Max Tip Load)
ERECTION KE 1 = 0,9 TON (OK) ERECTION KE 1 = 0,9 TON (OK) ERECTION KE 1 = 0,9 TON (OK)
ERECTION KE 2 = 0,9 TON (OK) ERECTION KE 2 = 0,9 TON (OK) ERECTION KE 2 = 0,9 TON (OK)
17
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
f. Casting Concrete
Casting concrete will be conducted by using concrete bucket concrete which
supported by mobile crane or tower crane if the column location is reachable
within the weight limit of the tower crane. Before placing of equipment, site
condition shall be checked by concrete pump operator and site condition shall
be modified if necessary. Ready mixed concrete will be supplied to the column
by truck mixers. Workability of fresh concrete will be checked by slump test at
the site prior to starting of concreting. Before casting concrete the workers
must be pouring mixture of bonding agent & cement to the concrete of bottom
column.
During the process of concreting, workers will use vibrators to prevent the
segregation and to ensure the concrete quality. The concrete shall be poured
continuously with monolithic process until designated top elevation. The
concrete of the column shall be placed under the condition without added
water.
The formworks can be removal after 8 hours after concreting. During the
hardening process, concrete shall be cured by watering to avoid the dry up for
ensuring of good quality up to 7 days.
KAPASITAS LIFTING JIB 75M = 2,5 TON (Max Tip Load) KAPASITAS LIFTING JIB 60M = 2,4 TON (Max Tip Load) KAPASITAS LIFTING JIB 65M = 2,0 TON (Max Tip Load)
Weight of Concrete Bucket = 0,1 TON Weight of Concrete Bucket = 0,1 TON Weight of Concrete Bucket = 0,1 TON
Weight of Concrete = 2,88 TON Weight of Concrete = 2,88 TON Weight of Concrete = 2,88 TON
Total = 2,98 TON (Not Ok) Total = 2,98 TON (Not Ok) Total = 2,98 TON (Not Ok)
NOTE : NOTE :
NOTE : MAX REACH FOR FULL CAPACITY CONCRETE BUCKET 50 M FOR MAX REACH FOR FULL CAPACITY CONCRETE BUCKET 47.5 M FOR
MAX REACH FOR FULL CAPACITY CONCRETE BUCKET 65 M FOR COLUMN THAT OUT OF CAPACITY REACH THE CONCRETE CASTING COLUMN THAT OUT OF CAPACITY REACH THE CONCRETE CASTING
COLUMN THAT OUT OF CAPACITY REACH THE CONCRETE CASTING PROCESS WILL USE A BUCKET WITH ONLY 0.8 M3 OF CONCRETE INSIDE
PROCESS WILL USE A BUCKET WITH ONLY 0.8 M3 OF CONCRETE INSIDE
PROCESS WILL USE A BUCKET WITH ONLY 0.8 M3 OF CONCRETE INSIDE (2 TON OF WEIGHT)
(2 TON OF WEIGHT) (2 TON OF WEIGHT)
18
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
1 day after the formwork was removed, the 2nd step of column concrete casting
work can be started. After marking the height of the formwork location, the
formwork can be installed at the marked area. The formwork support will be
rest on the platform. The platform is supported by PCH scaffolding. The worker
19
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
has to make sure that the truss is installed tightly and properly at the column.
After finishing of formwork, concrete cover, marking of top elevation,
supporting system of formwork and any other requirements shall be checked
by civil engineer, QC team and safety team.
20
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
21
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
Equipment
1 Bar Cutter max. rebar 32mm 1 unit
2 Bar Bender max. rebar 32mm 1 unit
Jib Length 60m, 65m &
3 Tower Crane
75m
3 unit
4 Pliers steel pliers 6 unit
5 Scaffolding 40 set
6 Concrete Bucket capacity 1.2 m3 1 Set
7 Waterpass/Total Station/ Theodolite 1 Set
8 Concrete Vibrator 1 Set
9 Multiplywood 432 Set
10 Cat Walk 276 Pcs
11 Metal Plank 252 Pcs
12 Ring Base 144 Pcs
13 Stair 30 Pcs
14 Safety Net As Needed
15 Spotlightlight Lamp, Nein Lamp, Etc As Needed
16 Circular Saw 1 Unit
17 Spray Painting 1 Unit
18 Welding Machine 2 Unit
19 Screwdriver 2 Unit
Material
1 Rebar BJTD420B As designed
2 Concrete F'c 50 Mpa As designed
3 Rebar wire As Needed
4 Concrete Decking As Needed
5 Welding Electrodes RD As Needed
6 Formwork Oil As Needed
Labour
1 Site Manager 1 Person
2 Supervisor 2 People
3 Surveyor 2 Team
4 SHE Officer 1 Person
5 Operator 4 People
6 Rigger 4 People
7 Rebar Labourer 40 People
8 Formwork Labour 6 People
9 Concrete Labour 5 People
22
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
6. MANAGEMENT MEASURES
Following the flow of HSR project construction work management:
23
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
7. SAFETY PLAN
In case that construction work is conducted at existing road, safety for existing traffic and
labor shall be considered in priority to other matter.
The following is several rules of the 'Safety Rules and Regulations for All Workers' that
will be implemented and posted to all Site Safety Notice Boards within the worksite.
a. Safety Rules and Regulations for All Workers
• All workers on site must follow instructions by foremen/ supervisors.
• All workers must use safety helmets with chin straps, vest, and standard safety
shoes/boots at all times. All workers must wear and anchor their safety
belts/harnesses when working at height. Other protective equipment must be worn
and used correctly as and when necessary.
• All workers must refrain from smoking whilst working. Smoking is allowed at
designated areas only.
• All workers must participate in the daily/weekly housekeeping so as to maintain
site cleanliness at all times.
• All workers must strictly abide and comply with all existing safety rules and
requirements.
• All workers must maintain tools and equipment issued in a safe working condition
and report defects to the supervisor immediately for corrective actions.
• All workers will report any hazardous conditions or unsafe acts to the supervisor.
• All workers must report any accident or dangerous occurrence without delay to
his supervisor for necessary action.
• AII workers must be responsible for taking reasonable care for the health of
oneself and of others who may be affected by what he does or fails to do at work.
• All workers must understand that failure to work safely or follow safe work
practices will result in disciplinary actions including removal from site.
b. Control of Employees and Visitors
All employees of the contractor and all subcontractor at all level, including labor and
all employees of other contractors who are working within the Site shall at all times
wear suitable identification when on the Site and display a permit. The permit shall
be in English and the Indonesian language, dated and clearly show the person's and
his employer's names.
24
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
All visitors shall report to security guard and follow instructions prior entering the sites.
At the location of the toll area where the work is ongoing, the job site is closed using
the MCB and fence. If there are location adjacent to resident, the project site remains
closed from public road users using fences, so that residents do not have access to
the project area.
c. Security and Social Responsibility
• To reduce potential loss or theft or other criminal acts during construction works
• To ensure effectiveness of managing security.
• All personnel at construction site shall adhere all security policy that have been
stated by Contractor
• Detail of Security management will be explained on Security Management Plan
documents which will be submitted separately.
During all construction work, WIKA Gedung will provide relevant traffic signs throughout
construction, signaling, banners and flags in every access to the area. This is done to
prevent vehicle accidents leading to the site due to extreme access conditions.
Continuous maintenance is also carried out so that the road can be passed by the vehicle
safely.
a. Prevention for Falling Down of Crane
Lifting work by crane is always required to carry out the work including rebar
installation, unloading of rebar, concreting etc. Once accident of crane falling down is
occurred, terrible impact for public cannot be avoid. In the worst case, dead and
injured will be happened. So, to avoid the above situation followings counter
measures are required;
• Confirmation of maximum lifting weight & working radius of crane
• Confirmation for ground condition of working area
• Prohibition of quick turning during lifting of heavy weight
• Installation of steel plate (if ground condition is not suitable)
b. Prevention for Contact with Heavy Equipment and Worker
In case that operator of equipment does not aware surrounding situation during
operation of the equipment, this accident will be occurred. Countermeasures for this
accident are;
• Keeping out for turning radius of heavy equipment
25
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
Temporary lighting will be prepared, if there is a work that will be doing at night time.
Lighting work is using spotlight lamp, neon lamp, etc. The lighting system shall be at
the right position, efficient and safe. For night work, every access to the location must
have a sufficient lighting. Lighting will be located at safe place. Electrical supply for
lighting is taken from electrical source of PLN or generator.
26
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
8. ENVIRONMENTAL PLAN
WIKA Gedung will consider environmental impact during column work. The consents of
the environmental plan for this activity are as follows:
a. Cleaning Area
WIKA Gedung will keep and protect cleanliness in the working area and around the area.
During the process of work and transportation activity, WIKA Gedung will provide Water
Jet Washer on exit access from the working area. This method could keep the cleanliness
of the road from mud soil on tire from Truck and another vehicle. The water will be
provided on access to the working area for cleaning it. WIKA Gedung will always control
the cleanness inside the working area and around, especially on the existing road.
b. Dust Control
The possible treatment on dust control is to use the Personal Protective Equipment (PPE)
for the worker.
27
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
Attachment 1
Attachment 2
āTask Milestone Rolled Up Milestone Project Summary Inactive Summary Manual Summary
Progress Rolled Up Critical Task External Tasks Inactive Milestone Manual Summary Rollup Deadline
Page 1
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
Attachment 3
Work List
Jakarta-Bandung High Speed Railway (HSR) Project
Master Construction Program for 2nd Floor Column of Station Works (Halim)
(DAK 10+803.29 – DK 00+750.00)
Attachment 4
Quality Plan
No. Dok : WIKA-BG-PDSMM-PM-02
No. Revisi : 00
PT Wijaya Karya Bangunan Gedung Tanggal : 12 Oktober 2020
REVISI :
TANGGAL :
Q U A L I T Y P L A N
PROSEDUR UMUM RENCANA MUTU
PEMBANGUNAN KERETA CEPAT INDONESIA CHINA STASIUN HALIM
START
Pek. Persiapan
P1 P1
N
Q1
Y
Pek. Tanah P2 Pek. Atap P5 Pek. Entrance P15 Pek. Elektrikal P16
N N N N
Q2 Q5 Q15 Q16
Y Y Y
Y
Pek. Struktur atas P3 Pek. Finishinf Dinding P6 Pek. Plumbing P17
N N N
Q3 Q6 Q17
Y Y Y
Pek. Rangka Atap Baja P4 Pek. Plafond P7 Pek. Tata Udara P18
N N N
Q4 Q7 Q18
Y Y Y
Pek. Lantai P8 Pek. Pemadam Kebakaran P19
N N
Q8 Q19
Y Y
Pek. Pintu dan Jendela P9 Pek. Elevator P20
N N
Q9 Q20
Y Y
Pek. Sanitary P10 Pek. Penangkal Petir P21
N N
Q10 Q21
Y Y
Pek. Pengecetan P11
N
Q11
Y
Pek. Enterance to Walkway P12
N
Q12
Y
Pek. Interiror Access P13
N
Q13
Y
Pek. Facade P14
N
Q14
Y
Serah Terima 2 P27
N
Q27
Finish
KODE NAMA KEGIATAN NOMOR INSTRUKSI KERJA JUDUL INSTRUKSI KERJA PROSES ALAT YANG DIGUNAKAN PENANGGUNG JAWAB
A PERSIAPAN
P1 PEKERJAAN PERSIAPAAN
1) Pengukuran Site WIKA-BG-PDENG-IK-01 Instruksi Kerja Proses Theodolite, waterpass, roll meter, bak ukur, Surveyor
Pekerjaan Pengukuran unting2, penggaris siku, spidol, tinta cina,
cat Pilox
3) Pekerjaan Penyedaan Air dan Daya Instruksi Kerja Proses Sesuai yang dibutuhkan Pelut MEP
Listrik Untuk Bekerja Pekerjaan Penyedaan Air dan Daya
Listrik
4) Pekerjan Penyediaan Alat Pemadam Instruksi Kerja Proes Sesuai yang dibutuhkan SHE
Kebakaran Pekerjaan Penyediaan Alat Pemadam
Kebakaran
5) Pekerjaan Drainage Proyek Instruksi Kerja Proses Pekerjaan Drinage Proyek Pipa, cangkul Manager Konstruksi
6) Pembuatan Pagar Keliling, Papan Nama IK House Keeping Bahan pagar adalah seng, rangka kayu Manager Konstruksi
Proyek, Papan WIKA Gergaji, meteran, palu
7) Pembuatan Site Office dan Gudang IK House Keeping Alat gali, gergaji, meteran, palu Manager Konstruksi
8) Shop Drawing WIKA-BG-PDENG-IK-02 Instruksi Kerja Shop Drawing Visual, komputer, spidol Engineering
(sesuai dengan metode kerja)
9) Pengajuan Material # - Semua material yang digunakan harus Visual, SOP Konsultan MK QA / Eng
diajukan ke Owner
B STRUKTUR
P2 PEKERJAAN TANAH
1) Pekerjaan Galian WIKA-BG-PDENG-IK-03 Instruksi Kerja Proses Pekerjaan Galian Excavator, Auto Level, Thedolite Manager Konstruksi
2) Pekerjaaan Urugaan dan Pemadatan WIKA-BG-PDENG-IK-04 Instruksi Kerja Proses Excavator, Cangkul, Stamper Manager Konstruksi
Pekerjaaan Urugan dan Pemadatan
1) Pekerjaan Bekisting WIKA-BG-PDENG-IK-05 Instruksi Kerja Proses Pekerjaan Bekisting Gergaji, palu, Tower Crane Manager Konstruksi
2) Pekerjaan Pembesian WIKA-BG-PDENG-IK-06 Instruksi Kerja Proses Pekerjaan Pembesian Bar Cutter, Bar Bender Manager Konstruksi
3) Pekerjaan Pengecoran Beton WIKA-BG-PDENG-IK-07 Instruksi Kerja Proses Tower Crane/Concrette Pump, Bucket, Manager Konstruksi
Pekerjaan Pengecoran Beton Truk Mixer, Vibrator
4) Pekerjaan Pembongkaran Bekisting WIKA-BG-PDENG-IK-08 Instruksi Kerja Pembongkaran Bekisting Linggis, palu, catut. Manager Konstruksi
Lampiran 9.14
PT Wijaya Karya Bangunan Gedung No. Dok. : WIKA‐BG‐PDSMM‐PM‐02
No. Revisi : 00
PT. WIJAYA KARYA BANGUNAN GEDUNG
PEMBANGUNAN KERETA CEPAT INDONESIA CHINA STASIUN HALIM
KODE NAMA KEGIATAN NOMOR INSTRUKSI KERJA JUDUL INSTRUKSI KERJA PROSES ALAT YANG DIGUNAKAN PENANGGUNG JAWAB
1) Pekerjaan Rangka Atap Baja WIKA-BG-PDENG-IK-09 Instruksi Kerja Proses Pekerjaan Rangka Baja Screw, bor baut, Alat potong, Las Manager Konstruksi
C ARSITEKTUR
P5 PEKERJAAN ATAP
1) Pekerjaan Metal Roof WIKA-BG-PDENG-IK-10 Instruksi Kerja Proses Screw, bor baut, Alat potong Manager Konstruksi
Metal roof
2) Pekerjaan Skylight Roof WIKA-BG-PDENG-IK-11 Instruksi Kerja Proses Screw, bor baut, Alat potong Manager Konstruksi
Skylight Roof
3) Pekerjaan Skylight WIKA-BG-PDENG-IK-12 Instruksi Kerja Proses Screw, bor baut, Alat potong Manager Konstruksi
Skylight
4) Pekejaan ACP Listplank WIKA-BG-PDENG-IK-13 Instruksi Kerja Proses Screw, bor baut, Alat potong Manager Konstruksi
ACP Listplank
5) Pekerjaan Insulasi WIKA-BG-PDENG-IK-14 Instruksi Kerja Proses Screw, bor baut, Alat potong Manager Konstruksi
Insulasi
1) Pekerjaan Pasangan Bata WIKA-BG-PDENG-IK-15 Instruksi Kerja Proses Pekerjaan Bak air, alat angkut, alat aduk, tempat adukan, Manager Konstruksi
Pasangan Bata benang, unting-unting, alat potong, bor, palu
2) Pekerjaan Plester dan Aci WIKA-BG-PDENG-IK-16 Instruksi Kerja Proses Pekerjaan Drum, Benang dan Paku utk Lot, Unting2 Manager Konstruksi
Plester dan Aci Gerobak dorong, ayakan pasir, sekop
Cangkul, ember, cetok, kotak adukan
Waterpass
3) Pekerjaan keramik dinding WIKA-BG-PDENG-IK-17 Instruksi Kerja Proses Pekerjaan Ayakan Pasir, Kotak adukan, cangkul, Manager Konstruksi
Keramik Dinding sekop, gerobak dorong, Palu Karet
benang dan paku utk kepalaan
4) Pekerjaan Expose dinding WIKA-BG-PDENG-IK-18 Instruksi Kerja Proses Pekerjaan Roskam Manager Konstruksi
Skimcoat Dinding
5) Pekerjaan Double Brickwall WIKA-BG-PDENG-IK-19 Insttruksi Kerja Proses Pekerjaan Drum, Benang dan Paku utk Lot, Unting2 Manager Konstruksi
Double Brickwall Gerobak dorong, ayakan pasir, sekop
Cangkul, ember, cetok, kotak adukan
Waterpass
6) Pekerjaan Glass Partition WIKA-BG-PDENG-IK-20 Instruksi Kerja Proses Pekerjaan Untung-unting, Waterpass, Bor screw Manager Konstruksi
Glass Partition
7) Pekerjaan Wooden Board WIKA-BG-PDENG-IK-21 Instruksi Kerja Proses Pekerjaan Untung-unting, Waterpass, Bor screw Manager Konstruksi
Wooden Board
Lampiran 9.14
PT Wijaya Karya Bangunan Gedung No. Dok. : WIKA‐BG‐PDSMM‐PM‐02
No. Revisi : 00
PT. WIJAYA KARYA BANGUNAN GEDUNG
PEMBANGUNAN KERETA CEPAT INDONESIA CHINA STASIUN HALIM
KODE NAMA KEGIATAN NOMOR INSTRUKSI KERJA JUDUL INSTRUKSI KERJA PROSES ALAT YANG DIGUNAKAN PENANGGUNG JAWAB
8) Pekerjaan Gypsum Board WIKA-BG-PDENG-IK-22 Instruksi Kerja Proses Pekerjaan Cangkul, ember, cetok, kotak adukan Manager Konstruksi
Gypsum Board
9) Pekerjaan Finish Andesit WIKA-BG-PDENG-IK-23 Instruksi Kerja Proses Pekerjaan Drum, Benang dan Paku utk Lot, Unting2 Manager Konstruksi
Finish Andesit Gerobak dorong, ayakan pasir, sekop
10) Pekerjaan Waterproofing WIKA-BG-PDENG-IK-24 Instruksi Kerja Proses Pekerjaan Kuas, ember Manager Konstruksi
Waterproofing
11) Pekerjaan Laser Cutting WIKA-BG-PDENG-IK-25 Instruksi Kerja Proses Pekerjaan Untung-unting, Waterpass, Bor screw Manager Konstruksi
Laser Cutting
P7 PEKERJAAN PLAFOND
1) Pekerjaan Plafond Gypsumboard WIKA-BG-PDENG-IK-26 Instruksi Kerja Proses Pekerjaan Plafond Cutter, ramset, Bor, Kape Manager Konstruksi
Gypsumboard
2) Pekerjaan Plafond Kalsiboard WIKA-BG-PDENG-IK-27 Instruksi Kerja Proses Pekerjaan Plafond Cutter, ramset, Bor, Kape Manager Konstruksi
Kalsiboard
3) Pekerjaan expose Plafond WIKA-BG-PDENG-IK-28 Instruksi Kerja Proses Pekerjaan Expose Plafond Kape, ember, roskam, jidar Manager Konstruksi
4) Pekerjaan Wood Panel WIKA-BG-PDENG-IK-29 Instruksi Kerja Proses Pekerjaan Cutter, ramset, Bor Manager Konstruksi
Wood Panel
5) Pekerjaan Baffle WIKA-BG-PDENG-IK-30 Instruksi Kerja Proses Pekerjaan Cutter, ramset, Bor Manager Konstruksi
Baffle
6) Pekerjaan Cell Metal Ceiling WIKA-BG-PDENG-IK-31 Instruksi Kerja Proses Pekerjaan Cutter, ramset, Bor Manager Konstruksi
Cell Metal Ceiling
7) Pekerjaan Metal Tiles Ceiling WIKA-BG-PDENG-IK-32 Instruksi Kerja Proses Pekerjaan Cutter, ramset, Bor Manager Konstruksi
Metal Tiles Ceiling
P8 PEKERJAAN LANTAI
1) Pekerjaan Floor Hardener WIKA-BG-PDENG-IK-33 Instruksi Kerja Proses Pekerjaan Mesin trowel
Floorhardener
2) Pekerjaan pasangan Homogenous Tile WIKA-BG-PDENG-IK-34 Instruksi Kerja Proses Pekerjaan Ayakan Pasir, Kotak adukan, cangkul, Manager Konstruksi
Pemasangan Homogenous Tile sekop, gerobak dorong, Palu karet
benang dan paku utk kepalaan
3) Pekerjaan Waterproofing WIKA-BG-PDENG-IK-24 Instruksi Kerja Proses Pekerjaan Kuas, Ember Manager Konstruksi
Waterproofing
4) Pekerjaan Keramik WIKA-BG-PDENG-IK-35 Instruksi Kerja Proses Pekerjaan Ayakan Pasir, Kotak adukan, cangkul, Manager Konstruksi
Keramik sekop, gerobak dorong, Palu karet
benang dan paku utk kepalaan
Lampiran 9.14
PT Wijaya Karya Bangunan Gedung No. Dok. : WIKA‐BG‐PDSMM‐PM‐02
No. Revisi : 00
PT. WIJAYA KARYA BANGUNAN GEDUNG
PEMBANGUNAN KERETA CEPAT INDONESIA CHINA STASIUN HALIM
KODE NAMA KEGIATAN NOMOR INSTRUKSI KERJA JUDUL INSTRUKSI KERJA PROSES ALAT YANG DIGUNAKAN PENANGGUNG JAWAB
5) Pekerjaan Rised Floor WIKA-BG-PDENG-IK-36 Instruksi Kerja Proses Pekerjaan Ayakan Pasir, Kotak adukan, cangkul, Manager Konstruksi
Rised Floor sekop, gerobak dorong, Palu karet
benang dan paku utk kepalaan
6) Pekerjaan Andesite WIKA-BG-PDENG-IK-37 Instruksi Kerja Proses Pekerjaan Palu Karet, Waterpass, Untuing-unting Manager Konstruksi
Andesite
7) Pekerjaan Tiles Batik Pattern WIKA-BG-PDENG-IK-38 Instruksi Kerja Proses Pekerjaan Palu Karet, Waterpass, Untuing-unting Manager Konstruksi
Tiles Batik Pattern
1) Pekerjaan Pintu Aluminium Frame WIKA-BG-PDENG-IK-39 Instruksi Kerja Proses Pekerjaan Waterpass Unting-unting, bor Manager Konstruksi
Aluminium Frame
2) Pekerjaan Pintu Kayu WIKA-BG-PDENG-IK-40 Instruksi Kerja Proses Pekerjaan Gergaji kayu, Waterpass mistar, Manager Konstruksi
Pintu Kayu Selang waterpass, penggaris siku, pahat,
3) Pekerjaan Pintu Besi WIKA-BG-PDENG-IK-41 Instruksi Kerja Proses Pekerjaan Waterpass Unting-unting, bor Manager Konstruksi
Pintu Besi
4) Pekerjaan Pintu Folding WIKA-BG-PDENG-IK-42 Instruksi Kerja Proses Pekerjaan Waterpass Unting-unting, bor Manager Konstruksi
Pintu Folding
P10 PEKERJAAN SANITAIR WIKA-BG-PDENG-IK-43 Instruksi Kerja Proses Pekerjaan Sanitair Obeng, bor, kunci pas Manager Konstruksi
1) Pekerjaan Cat Dinding WIKA-BG-PDENG-IK-44 Instruksi Kerja Proses Pekerjaan Kape, Scrap, Amplas, Roll, Ember Cat, Kuas Manager Konstruksi
Finishing Pengecatan Dinding
Internal
2) Pekerjaan Cat Plafond WIKA-BG-PDENG-IK-45 Instruksi Kerja Proses Pekerjaan Cat Plafon Kape, Scrap, Amplas, Roll, Ember Cat, Kuas Manager Konstruksi
1) Pekerjaan Keramik Enterance WIKA-BG-PDENG-IK-46 Instruksi Kerja Proses Pekerjaan Palu Karet, Waterpass, Untuing-unting Manager Konstruksi
Keramik Enterance
2) Pekerjaan Stop Nosing Entrance WIKA-BG-PDENG-IK-47 Instruksi Kerja Proses Pekerjaan Palu Karet, Waterpass, Untuing-unting Manager Konstruksi
Stop Nosing Entrance
3) Pekerjaan Expose finish Weathercoat Paint WIKA-BG-PDENG-IK-48 Instruksi Kerja Proses Pekerjaan Roskam, ember Manager Konstruksi
Expose finish weathercoat paint
4) Pekerjaan Finish Andesit WIKA-BG-PDENG-IK-37 Instruksi Kerja Proses Pekerjaan Palu Karet, Waterpass, Untuing-unting Manager Konstruksi
Finish Andesit
Lampiran 9.14
PT Wijaya Karya Bangunan Gedung No. Dok. : WIKA‐BG‐PDSMM‐PM‐02
No. Revisi : 00
PT. WIJAYA KARYA BANGUNAN GEDUNG
PEMBANGUNAN KERETA CEPAT INDONESIA CHINA STASIUN HALIM
KODE NAMA KEGIATAN NOMOR INSTRUKSI KERJA JUDUL INSTRUKSI KERJA PROSES ALAT YANG DIGUNAKAN PENANGGUNG JAWAB
1) Pekerjaan Railing Steel Pipe WIKA-BG-PDENG-IK-50 Instruksi Kerja Proses Pekerjaan Bor, Las, Unting, Waterpass Manager Konstruksi
Railing Steel Pipe
2) Pekerjaan Void Railing Stainless Steel WIKA-BG-PDENG-IK-51 Instruksi Kerja Proses Pekerjaan Bor, Las, Unting, Waterpass Manager Konstruksi
Void Railing Stainless Steel
3) Pekerjaan Tangga Stainless Steel WIKA-BG-PDENG-IK-52 Instruksi Kerja Proses Pekerjaan Bor, Las, Unting, Waterpass Manager Konstruksi
Tangga Stainless Steel
4) Pekerjaan Tempered Glass Laminated WIKA-BG-PDENG-IK-53 Instruksi Kerja Proses Pekerjaan Bor, Las, Unting, Waterpass, kunci inggris Manager Konstruksi
Tempered Glass Laminated
1) Pekerjaan Concrete Smooth Finish Weathercoat WIKA-BG-PDENG-IK-54 Instruksi Kerja Proses Pekerjaan Ramset, Waterpass, bor Manager Konstruksi
Concrete Smooth Finish Weathercoat
2) Pekerjaan Clanding Perforated WIKA-BG-PDENG-IK-55 Instruksi Kerja Proses Pekerjaan Ramset, Waterpass, bor Manager Konstruksi
Clanding Perforated
3) Pekerjaan Perforated Metal WIKA-BG-PDENG-IK-56 Instruksi Kerja Proses Pekerjaan Ramset, Waterpass, bor Manager Konstruksi
Perforated Metal
4) Pekerjaan GRC WIKA-BG-PDENG-IK-57 Instruksi Kerja Proses Pekerjaan Ramset, Waterpass, bor Manager Konstruksi
GRC
5) Pekerjaan Aluminium Composite Panel WIKA-BG-PDENG-IK-58 Instruksi Kerja Proses Pekerjaan Ramset, Waterpass, bor Manager Konstruksi
Aluminium Composite Panel
6) Pekerjaan Railing Stainless Steel WIKA-BG-PDENG-IK-59 Instruksi Kerja Proses Pekerjaan Ramset, Waterpass, bor Manager Konstruksi
Railing Stainless Steel
7) Pekerjaan Louver WIKA-BG-PDENG-IK-60 Instruksi Kerja Proses Pekerjaan Ramset, Waterpass, bor Manager Konstruksi
Louver
D INFRASTRUKTUR
1) Pekerjaan Canopy Glass WIKA-BG-PDENG-IK-61 Instruksi Kerja Proses Pekerjaan Ramset, Waterpass, bor Manager Konstruksi
Canopy Glass
E MEP
KODE NAMA KEGIATAN NOMOR INSTRUKSI KERJA JUDUL INSTRUKSI KERJA PROSES ALAT YANG DIGUNAKAN PENANGGUNG JAWAB
3) Pekerjaan Instalasi Penerangan dan Stop Kontak Obeng, tang, bor Pelut MEP
8) Pekerjaan Testing & Commingsioning Sistem berfungsi dengan benar Pelut MEP
2) Pekerjaan Pipa Air Kotor, Bekas Gergaji pipa, bor, gerinda, kunci pas Pelut MEP
& Vent
3) Pekerjaan Instalasi Pipa Saluran Obeng, bor, gerinda, kunci pas Pelut MEP
& Air Hujan
4) Pekerjaan Instalasi Pipa Kitchen Obeng, bor, gerinda, kunci pas Pelut MEP
5) Pekerjaan Testing & Commingsioning Sistem berfungsi dengan benar Pelut MEP
P18 PEKERJAAN TATA UDARA WIKA-BG-PDENG-IK-64 Instruksi Kerja Proses Pekerjaan Tata Udara
1) Pekerjaan Unit AC VRF & Split Duct Palu, alat Bor, Kunci Pas, Waterpass Pelut MEP
2) Pekerjaan Unit Fan Palu, alat Bor, Kunci Pas, Waterpass Pelut MEP
3) Pekerjaan Ducting, Grille, Diffuser Palu, alat Bor, Kunci Pas, Waterpass Pelut MEP
dan Instalasinya
4) Pekerjaan Pengkabelan Palu, alat Bor, Kunci Pas, Waterpass Pelut MEP
Lampiran 9.14
PT Wijaya Karya Bangunan Gedung No. Dok. : WIKA‐BG‐PDSMM‐PM‐02
No. Revisi : 00
PT. WIJAYA KARYA BANGUNAN GEDUNG
PEMBANGUNAN KERETA CEPAT INDONESIA CHINA STASIUN HALIM
KODE NAMA KEGIATAN NOMOR INSTRUKSI KERJA JUDUL INSTRUKSI KERJA PROSES ALAT YANG DIGUNAKAN PENANGGUNG JAWAB
5) Pekerjaan Pipa Refrigrant dan Pipa Drain Palu, alat Bor, Kunci Pas, Waterpass Pelut MEP
2) Pekerjaan Fire Hydrant Bor, gerinda, tang, kunci pas, kunci inggris Pelut MEP
3) Pekerjaan Fire Sprinkler Bor, gerinda, tang, kunci pas, kunci inggris Pelut MEP
4) Pekerjaan Fire Extinguisher Bor, gerinda, tang, kunci pas, kunci inggris Pelut MEP
P20 PEKERJAAN ELEVATOR WIKA-BG-PDENG-IK-66 Instruksi Kerja Proses Pekerjaan Elevator Las, bor, obeng Pelut MEP
P21 PEKERJAAN PENANGKAL PETIR WIKA-BG-PDENG-IK-67 Instruksi Kerja Proses Pekerjaan Penangkal Petir Bor, obeng Pelut MEP
P23 COMPLETION WORK # Sesuai dengan item pekerjaan yang harus Manager Konstruksi
dituntaskan
P26 MASA PEMELIHARAAN WIKA-P0-09-PM-001 Prosedur Pelaksanaan Masa Sesuai dengan item pekerjaan yang harus Manajer Proyek
Pemeliharaan diperbaiki
Keterangan :
# = Tidak dibuat IK Proses karena termasuk pekerjaan kategori biasa
Attachment 5
a. Pekerjaan Bekisting - Gunakan APD ( Helm, Rompi, Safety Shoes) WIKA-BG-PDENG-IK-05 WIKA-BG-PDENG-PM-05 - Persiapan - K3 dan alat - Meteran - Setiap pekerjaan bekisting V V -
- Pekerja tertimpa material (Prosedur QPASS) - Kondisi pengisian materal
- Pekerja menginjak benda tajam - Kondisi permukaan panel plywood
- Dibuatkan jalan kerja pada lahan yang sulit dijangkau oleh
Akurasi marking pada lantai
pekerja -
- Pada saat pekerjaan bekisting, pekerja harus
menggunakan sarung tangan untuk menghindari kontak Akurasi marking ketinggian
langsung dengan material -
- Perbaikan dan pembersihan panel
- Ukuran - Toleransi ukuran penampang +10 mm, -
5mm
-
Toleransi untuk opening/block out : +10 mm
untuk ukuran dan ± 25 mm untuk letak
- Toleransi untuk panel pracetak :±6 mm utk
panjang ≤ 3m, ± 9mm utk 3 sd 4,5 m dan ±12
mm utk setiap 6 m
- Kondisi bekisting - Bekisting harus bebas cacat
- Bagian dalam harus bebas dari kotoran
-
Semua sambungan harus bebas dari celah
- Perancah kuat, tidak longgar, terpasang benar
b. Pekerjaan Pembesian - Gunakan APD ( Helm, Rompi, Safety Shoes) WIKA-BG-PDENG-IK-06 WIKA-BG-PDENG-PM-05 - Persiapan - K3 dan alat - Meteran - Setiap pekerjaan pembesian V V -
(Prosedur QPASS) - Test tarik (Jika sertifikat dari pabrik tidak
- Pekerja tertimpa material
diterima)
- Pekerja menginjak benda tajam - Jenis material
- Dibuatkan jalan kerja pada lahan yang sulit dijangkau oleh - Kondisi visual besi bebas dari kotoran
pekerja
- Pada saat pekerjaan pembesian, pekerja harus - Diameter besi
menggunakan sarung tangan untuk menghindari kontak
langsung dengan material
- Mutu besi BJTD-420B dan BJTD-52
- Fabrikasi - Metode cutting & bending
- Bentuk bending
- Bentuk kait
- Dimensi besi spiral
- Dimensi beugel / sengkang
- Penyetelan - Posisi dan kelurusan besi dari pengecoran
sebelumnya
- Ukuran besi, jumlah, arah sesuai gambar
- Jumlah besi sesuai gambar
- Arah besi sesuai gambar
- Overlapping sesuai yang disyaratkan
- Panjang penjangkaran
- Kondisi lengkungan
- Penjarakan besi
- Kondisi pemasangan beton decking
- Final total checking
- Selimut beton 25 mm/ sesuai disyaratkan
c. Pekerjaan Pengecoran - Gunakan APD ( Helm, Rompi, Safety Shoes) WIKA-BG-PDENG-IK-07 WIKA-BG-PDENG-PM-05 - Persiapan - K3 dan alat - Theodolite - Setiap pekerjaan pengecoran V V -
- Pekerja tertimpa material (Prosedur QPASS) - Bucket (sesuai kebutuhan) - Meteran
- Pekerja menginjak benda tajam - Concrete Pump - Level
- Dibuatkan jalan kerja pada lahan yang sulit dijangkau oleh -
Vibrator
pekerja
- Pada saat pekerjaan pengecoran, pekerja harus - Compresor
menggunakan sarung tangan dan kaca mata safety untuk
menghindari kontak langsung dengan material
- Chain block
- Proses pengecoran - Area yang dicor bersih dari kotoran
- Cek terhadap sambungan & perkuatan
bekisting
- Urutan pengecoran sesuai metode kerja
- Mutu beton sesuai spek
- Elevasi & batas cor sesuai gambar
- Hasil pengecoran - Tidak boleh ada nampak agregat kasar
- Sambungan harus rata
- Tidak "hamil"
- Bebas tempelan bekisting,paku,busa, dll
- Bebas retak dan rusak
- Pengecoran - Silinder benda uji (unit)
- Uji slump (cm)
- Volume beton (m3)
- Item lain - Penempatan block out (jika ada)
- Penempatan conduit (jika ada) / MEP
d. Pekerjaan Bongkar Bekisting - Gunakan APD ( Helm, Rompi, Safety Shoes) WIKA-BG-PDENG-IK-08 - Umur beton pada saat - Kuat tekan dan umur beton telah - Hasil tes beton - Setiap pembongkaran bekisting V - -
- Pekerja tertimpa material dibongkar sesuai pada syarat di metode
- Pekerja menginjak benda tajam - Kuat tekan beton pada saat dibongkar kerja
- Dibuatkan jalan kerja pada lahan yang sulit dijangkau oleh
- Repropping balok dan plat sesuai metode kerja
pekerja
- Pada saat pekerjaan pembongkaran bekisting, pekerja
harus menggunakan sarung tangan dan kaca mata safety
untuk menghindari kontak langsung dengan material
Attachment 6
Attachment 7
Additional Attachment
Formwork Calculation
PROJECT KCIC STASIUN HALIM JAKARTA
DESIGN ELEMENT COLUMN FORMWORK TYPE 160x160
ENGINEER
REVISION
90.00
Tie Rod
90.00
Tie Rod
90.00
Tie Rod
90.00
Tie Rod
Tie Rod
30.00
Tie Rod
B. FORMWORK PRESSURE
P9
10.00
H8 Ph
P8
90.00
H7 Pg
P7
90.00
H6 Pf
P6
90.00
H5 Pe
P5
90.00
H4 Pd
P4
90.00
H3 Pc
P3
90.00
H2 Pb
30.00
Average Pressure
(1) From P1 up to P2
Pa = P1 + P2 = 8,624.00 kg/m2
2
(2) From P2 up to P3
Pb = P2 + P3 = 8,288.00 kg/m2
2
(3) From P3 up to P4
2
Pc = P3 + P4 = 7,184.00 kg/m
2
(4) From P4 up to P5
2
Pd = P4 + P5 = 5,648.00 kg/m
2
(5) From P5 up to P6
Pe = P5 + P6 = 3,920.00 kg/m2
2
(6) From P6 up to P7
2
Pf = P6 + P7 = 2,000.00 kg/m
2
C. TIEROD PRESSURE
10.00
90.00
Pa = 8,624.00 kg/m2
Pb = 8,288.00 kg/m2
90.00
Pc = 7,184.00 kg/m2
Pd = 5,648.00 kg/m2
Pe = 3,920.00 kg/m2
90.00
Pf = 2,000.00 kg/m2
90.00
90.00
90.00
30.00
30.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
Wx = 1/6 x b x h^2
= 0.1667 x 35.00 x 25.00
= 145.83 cm3
10.00
90.00
90.00
90.00
90.00
PROJECT KCIC STASIUN HALIM JAKARTA
DESIGN ELEMENT COLUMN FORMWORK TYPE 160x160
ENGINEER
REVISION
90.00
90.00
30.00
@Hollow Frame 100x50 mm for Vertical Beam
28.00 28.00 28.00
q = Lbeam x P1
= 0.20 x 8,624.00
= 1,724.80 kg/m'
= 17.25 kg/cm'
Mmax = q x L x L/2
= 17.25 x 20.00 x 10.00
= 3,449.60 kgcm
PROJECT KCIC STASIUN HALIM JAKARTA
DESIGN ELEMENT COLUMN FORMWORK TYPE 160x160
ENGINEER
REVISION
M max = Wx x τ
= 7.16 x 2,816.33
= 20,177.81 kgcm > 3,449.60 kgcm ...... OK
10.00
90.00
90.00
90.00
90.00
90.00
30.00
q = Lbeam x P2
= 0.20 x 8,624.00
= 1,724.80 kg/m'
= 17.25 kg/cm'
Mmax = q x L x L/2
= 17.25 x 20.00 x 10.00
= 3,449.60 kgcm
M max = Wx x τ
= 7.16 x 2816.33
= 20,177.81 kgcm > 3,449.60 kgcm ...... OK
PROJECT KCIC STASIUN HALIM JAKARTA
DESIGN ELEMENT COLUMN FORMWORK TYPE 160x160
ENGINEER
REVISION
As = P
τ
= 2,414.72
2,400.00
= 1.01 cm2
- Separator diameter :
2
As = π x D
4
D = 11.32 mm Use D = 16.00 mm ...... OK
Mpermissible = Wx x τ x 2 Unit
= 66.72 x 2,816.33 x 2
= 375,796.19 kgcm
Mpermissible = Wx x τ x 2 Unit
= 7.16 x 2,816.33 x 2
= 40,355.61 kgcm
Mpermissible = Wx x τ x 2 Unit
= 7.16 x 2,816.33 x 2
= 40,355.61 kgcm
Pmax = P1
= 3,920.00 kg
Push Pull Prop = 2,548.42 kg
RS 450 L ( Dobel ) 2,548.42 kg > 1,960.00 kgcm .............. OK
TABEL PERI UP
TABEL PROPERTIES BY
PERI UP
PROJECT KCIC STASIUN HALIM JAKARTA
DESIGN ELEMENT COLUMN FORMWORK TYPE 160x160
ENGINEER
REVISION
Pmax = 2 . wo + 0.8 wo ( H - 2 )
Pmax = 1.05 t/m2
Po = 0.105 kg/cm2
Tegangan lentur :
M max
σb = = 9.68 kg/cm2 < fb = 75 kg/cm2
Z
Lendutan max :
4
5 .W 1 . L 1 = 0.01 cm < δ ijin = 0.30 cm
δ max =
384 . EI
STASIUN HALIM JAKARTA
BONGKAR BEKISTING KOLOM
URAIAN HITUNGAN
DATA PERENCANAAN
Mutu :
Beton f'c : 50 Mpa K: 602,41 kg/cm2
Beton 1 hari 5,59 Mpa
Baja fy : 400 Mpa
Modulus Elastisitas Baja Es : 2,00E+05 Mpa
Tampang :
Tebal Plat t: 150 mm
Panjang Kolom L: 4,5 m 450 cm
Panjang Kolom h: 1.600 mm 1,6 m
Lebar Kolom b: 1.600 mm 1,6 m
Selimut Beton c: 40 mm
Tinggi Efektif d: 1.560 mm
Tulangan Yang Digunakan : Lebar Plat yang Ditahan Balok
Diameter 32,00 mm 1,20 m
Jumlah Tulangan Atas : 40,00 buah
Jumlah Tulangan Bawah : 40,00 buah
Luas Tulangan As : 0,25 x π x Ø^2 : 804,2477193 mm2
Luas Tulangan Total Atas as' : 40,00 x As : 32169,90877 mm2
Luas Tulangan Total Bawah as : 40,00 x As : 32169,90877 mm2
Beban - Beban :
Beban hidup LL : - kg/m2
Berat jenis beton g: 2.200 kg/m3
Momen Kapasitas
T : as x fy : 32169,9088 x 400= 12.867.963,509 N
a : T 12.867.963,509 = 1692,61858 mm
=
0,85 x f'c x b 0,85 x 5,59 x 1.600
= 0,005 cm
STASIUN HALIM JAKARTA
BONGKAR BEKISTING KOLOM
URAIAN HITUNGAN
Lendutan Ijin
Gambar 1. 3D Permodelan
2. Analisa Pembebanan
Berat jenis beton = 2400 Kg/m3
Tekanan Beton
P(C) = (Berat jenis beton x 1m ) / 2
= (2400 * 1 )/ 2
= 1200 Kg/m2
Tekenan Concrete Pump
P(P) = 80 Kg/m2
1
Gambar 2. Arah Pembebanan
P1 = (H1 + H2 + H3 + H4 + H5 ) x (PC +PP)
= (0,15 + 0,8 + 1 +1 + 0,55) x ( 1200 + 80)
= 3,5 x 2480
= 8680 Kg/m2
P2 = (H2 + H3 + H4 + H5 ) x (PC +PP)
= (0,8 + 1 +1 + 0,55) x ( 1200 + 80)
= 3,35 x 2480
= 8308 Kg/m2
P3 = (H3 + H4 + H5 ) x (PC +PP)
= (1 +1 + 0,55) x ( 1200 + 80)
= 2,55 x 2480
2
= 6342 Kg/m2
P4 = (H4 + H5 ) x (PC +PP)
= (1 + 0,55) x ( 1200 + 80)
= 1,55 x 2480
= 3844 Kg/m2
P5 = (H5 ) x (PC +PP)
= (0,55) x ( 1200 + 80)
= 0,55 x 2480
= 2604 Kg/m2
3
Gambar 4. Assign Pembebanan Permukaan Bekisting Y=0 & Y= 1,6m
4
3. Hasil Analisa Struktur
a. Gaya Dalam
6
b. Rekapitulasi Rasio Tegangan
Tabel 1. Rekapitulasi Rasio Tegangan
7
Gambar 8. Perspektif Rasio Tegangan
Berdasarkan tabel 1 dan gambar 10, mayoritas frame berada pada warna cyan
dengan nilai rasio tegangan terbesar yaitu 0,17 (< 1,00) menandakan formwork
tersebut aman untuk digunakan.
c. Joint Reaction
Tabel 2. Rekapitulasi Joint Reaction
d. Kapasitas Standard
Dari hasil perhitungan SAP2000 didapatkan gaya joint reaction sebesar 0,422 ton.
Dari hasil pengetesan, pipa standard mampu menahan gaya sebesar 4 ton ( >
0,422 ton). Berdasarkan hasil tersebut maka pipa standard aman digunakan untuk
menahan beban bekisting dengan safety factor sebesar 9,48.
8
e. Tierod
H1 = 0,15 m
H2 = 0,8 m
Luas = ((H1+H2)/2) x (Lebar Kolom /2)
= ((0,15/0,8)/2) x (1,6/2)
= 0,55 x 0,8
= 0,44 m2
Tekanan, P = Luas x ((P1+P2)/2)
= 0,44 x ((8680+8308)/2)
= 0,44 x 8494
= 3737,36 Kg
Mutu Tie Rod = 5798,6 Kg/cm2
As = P/fy
= 3737,36 / 5798,6
= 0,64 cm2
As = 0,25 x π x D2
D = 9,06 mm
Digunakan tie rod Ukuran D16 (> 9,06 mm)
9
B. ANALISA PERANCAH AKSES
1. Permodelan Struktur
5 @ 1,2 m = 6m
1,8 m
1,8 m
5 @ 1,2 m = 6m
5 @ 1,2 m = 6m
10
2. Analisa Pembebanan
a. Beban mati
Berat dari bekisting (SIDL) = 422 Kg
11
3. Hasil Analisa Struktur
a. Gaya Dalam
12
Gambar 15. Gaya Momen
13
b. Rekapitulasi Rasio Tegangan
Tabel 3. Rekapitulasi Rasio Tegangan
14
Gambar 16. Perspektif Rasio Tegangan
Berdasarkan tabel 1 dan gambar 10, mayoritas frame berada pada warna cyan
dengan nilai rasio tegangan terbesar yaitu 0,56 (< 1,00) menandakan perancah
tersebut aman untuk digunakan.
c. Kapasitas Standard
Dari hasil perhitungan SAP2000 didapatkan gaya aksial sebesar 1,87 ton. Dari
hasil pengetesan, pipa standard mampu menahan gaya sebesar 4 ton (> 1,87 ton).
Berdasarkan hasil tersebut maka pipa standard aman digunakan untuk menahan
beban bekisting dengan safety factor sebesar 2,14.
15
I,PT,RI
PT BETON
PEFlK-ASA
Con<kt torirtp..i.litt
Jakada 10210
Max. 60 kN/m'
Member of
"rpdagroup
I vantO GT 24 Girder Wall Formwork
Panel Standar
Pada panel standar PERI Vario GT 24 memiiki beberapa
macam jenis, panel dengan lehat 1.22 m dan 2.44 m.
2444
1224 1224
J.
7
1224 ,."
154 355
t
.-1
,
I
Pelindung Panel
1
Crane Splice GT 24
Ctane Splice GT 24 bedungsi sebagai alat
banlu pemindahan Panel PER|Vario cT 24,
pemindahan panel dilakukan dengan bantuan
Crans Splice GT 2l
lnternal Sudut
Vario lnternal Edge IRZ 60/60 diqunakan untuk
pekerjaan penyambungan pane pada sudut bagian
sisi dalam Wall / dinding.
vKz
wKz
eKz 3.60
GKZ
1.20
il
I!la: 0,48 m
vKz't47
A. coupllnq compre.lon
I
PIATO KDP t
ID D
E E
ut lu
A o-
B,$hds. K ;
\
\
Sambungan Panel (Vertikal)
Penyambunqan panel formwork dilak!kan
dengan menggunakan Extension Splice 24-2.
Pernasangan Exiension Splice 24-2 sangat mudah
dan cepat tanpa harus melubangi girder.
)Wi-'ji,i
"
Dengan kel nqg an dind ng kurang ebrh
8 M dapal menggunaka. Extension Splice 24-2
sebaga penyambunq Fane PERIVano GT24
'a- CFRT
13 52
Scaffold Bracket GB 80
Scafold Brackel GB 80 lem No
flI
Ltj
027110 ada ah bagian darikomponef
ulama pada pemasangan lantai kerja
Selain balok kayu 5/10 sebaga
pagar pengaman )09a papan 5l2A
berlungs sebagai anla
,ar4.l
sale,
0\,l.
{-:-J \
-=J2
Count€rprare oW 15, 120 x 120 I 15
,&
,t"^."arrfug
Girder Headpiece GT 24
Alal pengikat/ Penghub!ng
pada G rder GT 24 dengan 3. Pin D 16x42. ga v
4. Cotler Pin FS 4/1, g. v
2. 11
3, '12.
Quantity List
Quantity List
BLOW UP - 2A
Up
E
BLOW UP - 1 BLOW UP - 2 BLOW UP - 3 BLOW UP - 4 BLOW UP - 5
Up
Up
B
BLOW UP - 6 Up BLOW UP - 7 Up
BLOW UP - 8 BLOW UP - 9 BLOW UP - 10
D'
D
K1616 K1616 K1616 K1616
D'
D
K1616 K1616 K1616 K1616
D'
D
K1616 K1616 K1616 K1616 K1616
Up
KT66 (STAIR COLUMN)
D'
D
K1616 K1616 K1616 K1616
D'
D
K1616 K1616 K1616 K1616 K1616
C
NAME POSITION SIGN MARK PROJECT CLIENT :
YATI RUSMIYATI ENGINEER
ENDORSED BY CDJO
WANG XIAOBING ENGINEER
C
K1616 K1616 K1616 K1616
B'
3
NAME POSITION SIGN MARK PROJECT CLIENT :
1 2 4
YATI RUSMIYATI ENGINEER
ENDORSED BY CDJO
WANG XIAOBING ENGINEER
C
K1616 K1616 K1616 K1616
B'
5 6 7 8
NAME POSITION SIGN MARK PROJECT CLIENT :
YATI RUSMIYATI ENGINEER
ENDORSED BY CDJO
WANG XIAOBING ENGINEER
Up
KT66 (STAIR COLUMN)
C
K1616 K1616 K1616 K1616 K1616
B'
8 9 10 11 12
NAME POSITION SIGN MARK PROJECT CLIENT :
YATI RUSMIYATI ENGINEER
ENDORSED BY CDJO
WANG XIAOBING ENGINEER
B'
13 15
NAME POSITION SIGN MARK PROJECT CLIENT :
12 14
YATI RUSMIYATI ENGINEER
ENDORSED BY CDJO
WANG XIAOBING ENGINEER
C
K1616 K1616 K1616 K1616 K1616