TOLL PLAZA 1 + 200 NCR NO : 015

Si.no Description Units Quantity

Canopy Structure painting work( 21.00 m x


1 Sqm 1081.5
51.50 m)
PVC PIPES vertical from canopy for
2 Rtm
raimwater
Safety ladder all around barrication to be
3 Nos 10
done
Damages in yellow and black painting for
4 Sqm 215
raised plat form kerb in toll

5 W- frame balance to be done Rtm 50

Door shutters hinges , door stopper and


6 Nos 12
catcher to be done

7 Internal painting ground floor Sqm 974

8 internal painting First floor Sqm 1009.6

9 Safety and traffic island kerb to be done Rtm 20

Road marking / lane marking for parking


10 Rtm 100
area

11 Automatic connection to be done for genset Nos 2

TOTAL AMOUNT

TOLL PLAZA Equipements 1 + 200 NCR NO : 0

Si.no Description Units Quantity

1 WIM ir sensor are not working properly Nos 10


2 The POS terminal are to be provided. Nos 1
The 5 CCTV camera for office to be Nos 1
3
provided.
4 Smart card reader to be provided Nos 5
Big size fire extinguisher, bucket with sand Nos 2
5
are to be provided.
The godrej defender safe supplied is to be Nos 1
6
fixed in proper position with pedestal.
Total Amount

Total Amount ( Toll Plaza + Toll Equipement ) (704768+1361


1 + 200 NCR NO : 015
10%
COS Rate as per
maintenance Total Amount
Amount 2021
cost

117 126536

13781 1378 1378

83304 8330 8330

191 41065

5864 293200

8664 866.4 10397

140207 14021 14021

159921 15992 15992

285 5700

84.1 8410

1797400 179740 179740

TOTAL AMOUNT 704768

ents 1 + 200 NCR NO : 015


10%
COS Rate as per
maintenance Total Amount
Amount 2021
cost
2220300 222030 222030
76125 7612.5 7612
4230 4230

12050 60250

528640 1057280
101815 10181.5 10181

nt 1361583

pement ) (704768+1361583) 2066351