8.

Defects in Bus bay and shelter

9. LOOP A

S.No Location Side Nature of defect

LOOP A Embankment
2 LHS
Ch.0+060 to 0+080 eroded

Easing with
3 LOOP A NH road to be
done.

10. ECB

S.No Location Side Nature of defect

Structural
1 1+350 RHS
defect

Structural
2 29+700 LHS
defect

11. VMS
S.No Location Side Nature of defect

1 3+600 LHS Not working

2 24+900 RHS Not working

12. HM Stone/Kilo meter Stone Damaged

S.No Location Side Nature of defect

HM Stone
1 10+500 (40/4) LHS
Damaged

HM Stone
2 18+950 (48/6) LHS
Damaged

KM Stone
3 18+000 (48/0) RHS
Damaged

13. Parpet wall Missing/Damaged

S.No Location Side Nature of defect

1 11+780 RHS SR Missing


2 12+040 RHS SR Missing

3 18+050 LHS Damaged

14.Road Safety

S.No Nature of defects

Providing speed breakers as per IRC standards in


1 service road nearer to Entry and Exit points of
MCW & SR.
Providing sign boards flickering lights in Service
2 road and Main carriageway nearer to Entry and
Exit points of MCW & SR

All SOS (Save our soul) which is erected on Outer


Ring Road (ORR) must be visibly painted with
3 solar electronic scroll board fixed on the top of
post, so that the driver can easily access their help
without hindrance.

For every 2 KM there must be one SOS post and


every 1km one signage board carrying the message
4 of “SOS” facility, with Toll free number should to
be erected. (Suggested 5x4 feet) in Tamil and
English.

Every 1KM CCTV Camera must be erected and on


5
all the entry & exit of the service road.

In some Places the parapet wall and side iron


railing are not properly laid and there is a
6
discontinuity, which have to be linked for
continuity.
All the sign boards may be placed in English &
7
Tamil language.

All the eater shops, iron scrap shops, etc, which are
situated adjacent to the ORR must be issued with
notices carrying the instruction to park their
8 vehicles on service road (or) parking space. If any
accidents or incidents occurs due to parking of
vehicle on main road (or) the shop owner has to be
taken liability.

Some more Truck yard can be identified by


10
TNRDC to facilitate the Truck parking safely.

11 In all Toll Plaza, one ambulance must be placed.

Additional reflectors (or) solar flickers should be


12 pasted on side iron railings and side wall on the
entire stretch of Outer Ring Road.
Extra transmitter (or) some power backup must be
13 available so that power cut during night time on
this stretch can be solved.
Yellow painted Rumbles strip has to be provided
14 before all the entry points into service Road from
400 Feet Outer Ring Road.

In all the entry and exit points of 400 Feet Road to


Service Road in Outer Ring Road, flickering lights
15
should be fixed, for identification during Night
hours.

By raising the centre median wall, iron railing or


16 parapet wall, will prevent the cattle crossing and
also will prevent accidents due to cattle crossing.
1set of Heavy crane & JCB Vehicle must be placed
17
near each Toll Plaza.

Ambulance with life support equipment must be


18
available round the clock in each Toll plaza.

15.Balance work

Junction Improvement

S.No Location Side Land handed o

1 5+100 (vellacheri) LHS 03.06.2022

Bus bays

S.No Location Side Land handed o

1 Ch.11+665 (Vellanur) LHS 30.01.2020

2 Ch.19+590 (Pannivakkam) LHS 10.01.2021


3 Ch.20+180 (Angadu) LHS 10.01.2021

Rest Area

S.No Location Side Land handed o

26+375 to 26+755 LHS


1 LHS 08.04.2022
(Periyamullaivoyal)
Probable
Date of defect noticed Stage of work date of
completion

16.06.2022 Not completed 30.06.2022

26.05.2022 Not completed 30.06.2022

Probable
Date of defect noticed Stage of work date of
completion

16.06.2022 Not completed 30.06.2022

16.06.2022 Not completed 30.06.2022


Probable
Date of defect noticed Stage of work date of
completion

30.05.2022 Not completed 30.06.2022

30.05.2022 Not completed 30.06.2022

Probable
Date of defect noticed Stage of work date of
completion

8.06.2022 Not completed 30.06.2022

8.06.2022 Not completed 30.06.2022

21.06.2022 - -

Probable
Date of defect noticed Stage of work date of
completion

08.06.2022 Not completed 26.06.2022


08.06.2022 Not completed 26.06.2022

15.06.2022 Not completed 26.06.2022

Probable
Date of defect noticed Stage of work date of
completion

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given


06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

06.06.2022 Not completed Not given


06.06.2022 Not completed Not given

06.06.2022 Not completed Not given

Probable date of
Stage of work
completion

Yet to be commence -

Probable date of
Stage of work
completion

Yet to be commence -

Yet to be commence -
Yet to be commence -

Probable date of
Stage of work
completion

Yet to be commence -