TOLL PLAZA 30*562 NCR NO : 016

Si.no Description Units Quantity

6 Door shutters hinges , door stopper and catcher to be done Nos 12

7 Internal painting ground floor Sqm 974


8 internal painting First floor Sqm 1009.6
9 Safety and traffic island kerb to be done Rtm 20
10 Island filling in weigh bridge area to be done cum 15
11 Balance CC flooring in weigh bridge area M15 cum 10
12 Automatic connection to be done for genset Nos 2
TOTAL AMOUN

Toll Plaza Equipements at Ch.27+150

Si.no Description Units Quantity

1 WIM ir sensor are not working properly Nos 10


Damaged in Treadle base provided in Toll lanes are to be Nos 3
2
rectified.
3 Server with OS is to be provided. Nos 1
4 The POS terminal are to be provided. Nos 1
5 Manager terminal are to provided. Nos 1
6 The PTZ camera are to be provided. Nos 2
7 The 5 CCTV camera for office to be provided. Nos 5
8 DVR/NVR for video recording to be provided. Nos 3
9 Smart card reader to be provided Nos 5
Big size fire extinguisher, bucket with sand are to be Nos 2
10
provided.
The godrej defender safe supplied is to be fixed in proper Nos 1
11
position with pedestal.
The defects in 1no of siren provided for the emergency is to Nos 1
12
be rectified.
13 Bio-metric attendance/locker are to be provided. Nos 2

14 Fake currency note detector machine 10nos to be provided. Nos 10

Total Amount

Total Amount ( Toll Plaza + Toll Equipement ) (752142+ 2193536


62 NCR NO : 016
10%
COS Rate as per
maintenance Total Amount
Amount 2021
cost

8664 866.4 10397

140207 14021 14021


159921 15992 15992
285 5700
505.59 7584
4820 48200
1797400 179740 179740
TOTAL AMOUNT 281633

ents at Ch.27+150
10%
COS Rate as per
maintenance Total Amount
Amount 2021
cost
2220300 222030 222030

12700 38100

211450 211450
76125 76125
63450 63450
63450 126900
4230 21150
52850 158550
12050 60250

528640 1057280

101815 10181.5 10181

10570 10570

42300 84600

5290 52900

2193536

ent ) (752142+ 2193536) 2475169