You are on page 1of 3

S.

No Consultancy Package NH No Project Stretch Project Length Project Cost Assignment Periods

1 Chennai Outer Ring Road Phase -II SH-234 Ch.0+000 to 30+500 30.05km on BHS 1250 crores 01.11.2021 to 31.10.2024

S.NO Particulars Details

1 Mode of Consultancy Package EPC


EPC/HAM/BOT

2 Construction/o&M/ OMT O&M

3 Legth of main carriageway and Lane 6 lane= 30.5km


2/4/6 2 lane=--------Km 4 Lane= --------KM 8 lane= -----------km Total Length= 61.00 km

4 Details of service Road 5.50m width of 30.5km on BHS

5 Please Attach all TCS with Sheet and Mention Length of Carriage Way in Which particular TCS attached
Type of TCS with Applied KM TO KM

6 Type of Pavement (Flexible/Rigid) with


Length Flexible - 30.036 and Rigid - 464m

7 No of Toll Plaza's 2

8 No of Bus Lay Byes 50

9 No of Truck Lay Byes 2

10 LHS - 2 RHS -1
Construction Of AT-grade Intersection

11
No's of RUB'S -

12 Relocation OF HT No of Poles Electric Cable used at toll No of DG's set at toll


Electrical Work Line's with KM plaza's in Meter Plaza

S.NO 4

1 2567 nos
Highway light

2 16 nos
Highmast
3 VUP/PUP 216/176

13 Date Of Agreement 18.09.2013

14 Date Of Commencement 18.09.2013

15 Date Of Completion 29.10.2022

16 Date of PCOD 27.04.2017

17 PIU Name Tamil Nadu Road Development Company Ltd.,

18 PD Name and Contact No. Chief General Manager and 044 2495 2800/3800

19 Appointed Date Of Contractor 18.09.2013

21 Concern Person Name & Mobile No Mr.R.Vijaya Kumar, Contact No.9944557589


Contractor (PM/VP)

22 Progress % Till Date 99%.

23 Team Leader Name & Number Mr.P.Manogaran, Contact No.9444010365

24 RE/HME Name & Number


-

25 Total No. Of Major Bridges 1

Total Length of
S.NO TYPE OF Structure & Chainage NO. OF Span/Span Arrangement Approach Length Type of foundation Cost of Structure
bridge

26 Total No. Of Minor Bridges

Total Length Of
S.NO TYPE OF Structure & Chainage NO. OF Span/Span Arrangement Approche Length Type of Foundation Cost of Structure
Bridge

i) Ch.4+950 Minor briger 1 87m 38m( Avg) Pile

ii) Ch.17+555 Minor bridge 1 80m 30m Pile

iii) Ch.21+600 Minor bridge 1 150m 27.116 m Pile

iv) Ch.26+750 Minor bridge 1 200 m 10 m Pile

v) Ch.27+935Minor bridge 1 70m 10 m Pile

vi) Ch.29+455Minor bridge 1 80m 10 m Pile

27 No. Of ROB'S & Length

Total Length Of
S.NO TYPE OF Structure & Chainage NO. OF Span/Span Arrangement Approche Length Cost of Structure
Bridge
28 No. Of VUP/LVUP'S/Flyover VUP-14 Flyover-1 VUP -12m

Total Length Of
S.NO TYPE OF Structure & Chainage NO. OF Span/Span Arrangement Approches Length Cost of Structure
Bridge

Flyover (2no of 20m )+(1no of 30m) 120m 70m

29 Approval Status Of Drwaing And


Design -

Details of Innovative Bridge


30
( Cable Stay, Double Dose Cable etc)
Nil

You might also like