You are on page 1of 4

FS dan Pra DED PLTA BALIEM Kabupaten Jayawijaya dan Yahukimo Provinsi Papua 15 MW

Type ROR - Tahun Anggaran 2022

FS dan DED PLTM SISIRA - 10 MW DAS Aek Sisira Kabupaten Humbang Hasundutan Provinsi
Medan

FS PLTM KOMBIH 4 - 10 MW DAS Lae Kombih Kabupaten Phak pak Barat Provinsi Medan

FS dan DED PLTM TALUDA 2 Sungai Taluda - 3MW Provinsi Gorontalo Sulawesi Tenggara 2017
- PT. CMD Renewable Energy

FS dan DED PLTM Bulo Kabupaten Polewalimandar Provinsi Sulawesi Barat

FS dan DED PLTM Ordi ( 2 x 5 MW ) Kabupaten Phak pak Barat Sumatera Utara 2014

FS dan DED PLTM Enang enang ( 2 x 4 MW ) Kabupaten Bener Meriah Aceh 2014

FS PLTM Cibareno ( 2 x 1 MW ) Kabupaten Lebak Banten 2014

FS dan DED PLTM TANDIKE ( 2 x 3 MW ) Kabupaten Agam Sumatera Barat 2013

FS dan DED PLTM TOBLONG ( 2 x 3,7 MW ) Kabupaten Garut Jawa Barat 2013

Preliminary Studi PLTM SILAU 3 ( 2 x 4 MW ) Kabupaten Simalungun Sumatera Utara 2012

Studi Potensi dan FS PLTM Malino ( 2 MW ) Kabupaten Gowa Sulawesi Selatan 2011

FS dan DED PLTM Budong-Budong ( 2 x 1 MW ) dan PLTM Bonehau ( 2 x 2,2 MW ) Kabupaten


Mamasa dan Mamuju Sulawesi Barat 2010

Studi Melistriki PLTMH Distrik Pegaf, Membey, Yamara dan Mie Comty Provinsi Papua 2017

Studi Kelayakan PLTM Cikembang dan


PLTM Cimedang 8 MW – PT. KWARSA
FEASIBILITY STUDY and Pre DED of BALIEM
PLTA Jayawijaya and Yahukimo Regency Papua
Province 15 MW
ROR Type - Fiscal Year 2022

FS and DED PLTM SISIRA - 10 MW Aek Sisira


Watershed, Humbang Hasundutan Regency,
Province
Medan

FS PLTM KOMBIH 4 - 10 MW Lae Kombih DAS


West Phak Pak Regency Medan Province

FS and DED of PLTM TALUDA 2 Taluda River -


3MW Gorontalo Province Southeast Sulawesi
2017 - PT. CMD Renewable Energy

FS and DED PLTM Ordi (2 x 5 MW) West Phak Pak


Regency, North Sumatra 2014

FS and DED of PLTM Budong-Budong (2 x 1 MW)


and PLTM Bonehau (2 x 2.2 MW) Regency
Mamasa and Mamuju West Sulawesi 2010
Preliminary Study of PLTM SILAU 3 (2 x 4 MW)
Simalungun Regency, North Sumatra 2012

FS and DED PLTM TOBLONG (2 x 3.7 MW) Garut


Regency, West Java 2013

Cikembang PLTM Feasibility Study and


PLTM Cimedang 8 MW – PT. KWARSA

My offer for a feasibility study for a mini hydro


power plant for 2 locations in South Africa is IDR
300 million.
I worked on it from Indonesia with my team (I
received data on the location of the dam and its
topography, then I processed it starting from
hydrological analysis to the budget plan.
My contact number / WA is 087729389835 (Mr.
Fajar)

Thank you in advance for your trust in me to work


together on this Hidropower project. I can't come to
the job location in South Africa. I am used to
working on Mini Hydro Power Plant projects in
Indonesia, with topographic data and the location of
the dam already determined by the owner. Thank
You
The following is my Curriculum Vitae while I was
working on the Minihydro Power Plant Project:

You might also like