muk-38765-4
muk-38765-4
: 2986-ESP-LRU-CI-CAL-0001
SOUTH OIL COMPANY TWO BRAND NEW SOLAR GAS TUBRO GAS REV : 0
COMPRESSOR PACKAGE EPC CONTRACT DATE : 31-Mar-15
CONTRACTOR : TITLE: PREP'D : RKA
UNA & EC CHK'D : RKA/TPL
DESIGN OF COMPRESSOR FOUNDATION
APPR'D : AKN/BSK
N
Lf
9400
D1 C1 B1
3000
Wf
A
D2 C2 B2
X
Y
PLAN
m
FGL EL. +100.000
(B2, C2, D2) (B1, C1, D1)
800
Dp
Y
1400
Tf
600
Df
ELEVATION
CLIENT: PROJECT: DOC. NO. : 2986-ESP-LRU-CI-CAL-0001
SOUTH OIL COMPANY TWO BRAND NEW SOLAR GAS TUBRO GAS REV : 0
COMPRESSOR PACKAGE EPC CONTRACT DATE : 31-Mar-15
CONTRACTOR : TITLE: PREP'D : RKA
UNA & EC CHK'D : RKA/TPL
DESIGN OF COMPRESSOR FOUNDATION
APPR'D : AKN/BSK
FOUNDATION PAD A B1 B2 C1 C2 D1 D2
TOTAL STATIC
363.14
LOAD ON FDN (kN)
FOUNDATION PAD A B1 B2 C1 C2 D1 D2
HORIZONTAL LOAD (kN) ± 1.42 ± 4.7 ± 4.7 ± 1.33 ± 1.33 ± 0.19 ± 0.19
VERTICAL LOAD (kN) ± 1.98 ± 6.72 ± 6.72 ± 1.88 ± 1.88 ± 0.26 ± 0.26
Since the wind speed considered in the vendor drawing is on conservative side, the wind load on each foundation pad provided in the vendor
drawing is considered for the foundation design and the same is provided in the below table.
FOUNDATION PAD A B1 B2 C1 C2 D1 D2
HORIZONTAL LOAD (kN) ± 24.6 ± 12.5 ± 12.5 ± 3.6 ± 3.6 ± 3.6 ± 3.6
VERTICAL LOAD (kN) ± - ± 50 ± 50 ± 5 ± 5 ± 5 ± 5
The seismic load provided in the vendor drawing for '0.5g' acceleration, for conservative side the load provided by vendor is considered for the
design.
FOUNDATION PAD A B1 B2 C1 C2 D1 D2
HORZ. LOAD (kN) ± 39.1 ± 45.6 ± 45.6 ± 19.7 ± 19.7 ± 5.9 ± 5.9
0.5g
VERTI. LOAD (kN) ± - ± 115.5 ± 115.5 ± 34.9 ± 34.9 ± 10.5 ± 10.5
CLIENT: PROJECT: DOC. NO. : 2986-ESP-LRU-CI-CAL-0001
SOUTH OIL COMPANY TWO BRAND NEW SOLAR GAS TUBRO GAS REV : 0
COMPRESSOR PACKAGE EPC CONTRACT DATE : 31-Mar-15
CONTRACTOR : TITLE: PREP'D : RKA
UNA & EC CHK'D : RKA/TPL
DESIGN OF COMPRESSOR FOUNDATION
APPR'D : AKN/BSK
Wind Load
for D1-D2 couple, M= 11.69 kNm
D2 = -5 kN for C1-C2 couple, M= 11.69 kNm D1 = 5 kN
C2 = -5 kN for B1-B2 couple, M= 116.9 kNm C1 = 5 kN
B2 = -50 kN B1 = 50 kN
D2 = 3.6 kN A = 24.6 kN D1 = 3.6 kN
C2 = 3.6 kN C1 = 3.6 kN
B2 = 12.5 kN B1 = 12.5 kN
z
2.337
Seismic Load
for D1-D2 couple, M= 24.54 kNm
D2 = -10.5 kN for C1-C2 couple, M= 81.57 kNm D1 = 10.5 kN
C2 = -34.9 kN for B1-B2 couple, M= 269.9 kNm C1 = 34.9 kN
B2 = -115.50 kN B1 = 115.5 kN
D2 = 5.9 kN A = 39.1 kN D1 = 5.9 kN
C2 = 19.7 kN C1 = 19.7 kN
B2 = 45.6 kN B1 = 45.6 kN
z
2.337
Fz Fy Mx
S. No. PRIMARY LOAD CASE
(kN) (kN) (kNm)
H P M
S. No. LOAD COMBINATIONS
(kN) (kN) (kNm)
1 Ds+De+L 0 1660.34 0
2 Ds+De+W 64 1660.34 140.28
3 0.9(Ds+De)+0.7EQ 127.05 1494.306 263.228
4 Ds+Do 13.86 1660.34 20.72
5 Ds+Do+L 13.86 1660.34 20.72
6 Ds+Do+0.7EQ 140.91 1660.34 283.948
7 0.9(Ds+Do)+0.7EQ 139.524 1494.306 281.876
8 Ds+Do+W 77.86 1660.34 161
CLIENT: PROJECT: DOC. NO. : 2986-ESP-LRU-CI-CAL-0001
SOUTH OIL COMPANY TWO BRAND NEW SOLAR GAS TUBRO GAS REV : 0
COMPRESSOR PACKAGE EPC CONTRACT DATE : 31-Mar-15
CONTRACTOR : TITLE: PREP'D : RKA
UNA & EC CHK'D : RKA/TPL
DESIGN OF COMPRESSOR FOUNDATION
APPR'D : AKN/BSK