RC Slab
400 400
Property
a. Plywood checking
Concrete Self-weight
= × ×1
= 25 / × 0.25 ×1 = 6.25 / /
Live Load
=2 ⁄ =2 / /
Load Combination
= 1.35 × + 1.6
= 1.35 × 6.25 + 1.6 × 2 = 11.64 / /
= . / /
= =
Bending Strength
=
10
11.64 × 0.40
= = 0.18 ⁄
10
= . ⁄
Stress in Plywood
Plywood =
1
= ×
= 12
1
= = × 1000 × 18
12
Prepared by Voek Pitou (Technical Manager) Pg. 3
=
0.18 × 10 × 9
= = 3.33
486000
= . < = ,
Maximum displacement
×
=
185
11.64 × 400
= = 0.27
185 × 12000 × 486000
= .
=
270
400
= = 1.5
270
= . < = . ,
∅ @1200mm
= × ×
= 25 / × 0.25 × 0.40 = 2.50 /
Live Load
=2 ⁄ × 0.40 = 0.80 /
Load Combination
= 1.35 × + 1.6
= 1.35 × 2.5 + 1.6 × 0.80 = 4.65 /
= . /
= .
= =
Bending Strength
=
10
4.65 × 1.0
= = 0.46
10
= .
Main Purlin =
1
= ×ℎ
12
1
= × 40 × 80
= 12
= .
=
0.46 × 10 × 40
= = 10.78
1706666.66
Maximum displacement
×
=
185
4.65 × 1000
= = 1.23
185 × 12000 × 1706666.66
= .
=
270
1000
= = 3.70
270
= . < = . ,
Steel Pipe-1:∅
Concrete Self-weight
= ×
= 25 / × 0.25 = 6.25 /
Live Load
=2 ⁄
Load Combination
= 1.35 × + 1.6
= 1.35 × 6.25 + 1.6 × 2 = 11.63 /
= . /
=− .
=
,
0.57 × 10
= × 24.50 = 121.27
115159.00
= . < = ,
Maximum displacement
×
=
185
11.63 × 1.0 × 1000
= = 2.6
185 × 210000 × 115159.0
= . < = = = . , .
For more stability in site construction, double steel pipes are used during the
construction.
2. Steel pipe-2 support system checking
Bracing:∅
Steel Pipe-2:∅