0% found this document useful (0 votes)
56 views121 pages

Monitoring Sheet

sheet

Uploaded by

eulaabellar0130
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views121 pages

Monitoring Sheet

sheet

Uploaded by

eulaabellar0130
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS

PROJECT : BONCHON KITCHEN


LOCATION : SPACE NO. R246-R247 SECOND FLOOR PITX
TYPE OF PROJECT : FULL STORE

:
DESIGNER : ATTATCHMENTS
GENCON : BIBOSO :
:
MECHANICAL : RCT
REFERENCE NO.: CPRD001

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GENCON
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
19 *WATER METER CALIBRATION CERT. GENCON
20 *ELECTRIC METER CALIBRATION CERT. GENCON
21 FUNCTIONALITY CERTIFICATE SPECIALTY TRADE CONTRACTOR
22 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 GENCON
6 GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS
OTHER CONTRACTORS
Mechanical: RCT
Gas: RCT

HARD COPY Fire Suppression: RCT


SOFT COPY Fire Protection: PIODURAN ENGINEERING DEVELOPMENT INC.
FDAS:
GLASS:

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS










RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS



✔ 12
✔ 10

✔ 12

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS



✔ 1/3/2023 1

✔ 03/15/2023 1
✔ 06/17/2023 1










✔ 10/1/2023 1


✔ 3/5/2023 1


REMARKS DATE


REMARKS DATE

✔ 8/6/2023


6/26/2023



RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








G DEVELOPMENT INC.

RELEASED TO LIAISONS
DATE NO. OF SETS

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT : BONCHON KITCHEN
LOCATION : G/F, EDUYAS COMPLEX, 165 DEPARO RD., BRGY. 168, CALOOCAN
TYPE OF PROJECT : CLOUD KITCHEN

:
DESIGNER : ATTATCHMENTS
GENCON : CITILITES :
:
MECHANICAL :

REFERENCE NO.: CPRD002

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GENCON
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST GENCON
15 WATERLINE LEAK TEST GENCON
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
19 *WATER METER CALIBRATION CERT. GENCON
20 *ELECTRIC METER CALIBRATION CERT. GENCON
21 FUNCTIONALITY CERTIFICATE SPECIALTY TRADE CONTRACTOR
22 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 GENCON
6 GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS
OTHER CONTRACTORS
. 168, CALOOCAN CITY Mechanical: RCT
Gas: RCT

HARD COPY Fire Suppression: RCT


SOFT COPY Fire Protection:
FDAS:
GLASS:

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS










RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS
✔ 6
✔ 6
✔ 6
✔ 12
✔ 12
✔ 12


RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS























REMARKS DATE


REMARKS DATE

✔ 10/26/2023

10/26/2023


10/26/2023



RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RELEASED TO LIAISONS
DATE NO. OF SETS

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT : SFG CENTRAL KITCHEN
LOCATION : CENTRO MALL-CABUYAO, AH 26, CABUYAO LAGUNA
TYPE OF PROJECT : CLOUD KITCHEN

:
DESIGNER : ATTATCHMENTS
GENCON : CITILITES :
:
MECHANICAL :

REFERENCE NO.: CPRD003

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION GAS, FP, FS CONTRACTOR
6 GAS GAS, FP, FS CONTRACTOR
7 FIRE PROTECTION GAS, FP, FS CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GAS, FP, FS CONTRACTOR
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
19 *WATER METER CALIBRATION CERT. GENCON
20 *ELECTRIC METER CALIBRATION CERT. GENCON
21 FUNCTIONALITY CERTIFICATE SPECIALTY TRADE CONTRACTOR
22 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 Installation of sprinkler heads GENCON
6 GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS
OTHER CONTRACTORS
UNA Mechanical:
Gas: RCT

HARD COPY Fire Suppression: RCT


SOFT COPY Fire Protection:
FDAS:
GLASS:

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS


✔ 03/21/2023 1







RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS
✔ 12
✔ 12
✔ 12
✔ 12
✔ 9



RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS
✔ 5/4/2023 1


✔ 4/17/2023 3


✔ 4/19/2023 1

✔ 5/3/2023 1
n/a
✔ 5/4/2023 1












REMARKS DATE


REMARKS DATE


✔ 4/19/2023


RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RELEASED TO LIAISONS
DATE NO. OF SETS

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT : BONCHON JAKA
LOCATION : JAKA PLAZA, PARAÑAQUE CITY
TYPE OF PROJECT : CLOUD KITCHEN

:
DESIGNER : ATTATCHMENTS
GENCON : ANDRES & GONZAGA :
:
MECHANICAL :

REFERENCE NO.: CPRD004

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GENCON
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
19 *WATER METER CALIBRATION CERT. GENCON
20 *ELECTRIC METER CALIBRATION CERT. GENCON
21 FUNCTIONALITY CERTIFICATE SPECIALTY TRADE CONTRACTOR
22 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 GENCON
6 GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS
OTHER CONTRACTORS
Mechanical:
Gas:

HARD COPY Fire Suppression:


SOFT COPY Fire Protection:
FDAS:
GLASS:

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS










RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS
✔ 6/20/2023 6

✔ 6/20/2023 2
✔ 6/20/2023 8
✔ 6/20/2023 10
✔ 6/20/2023 10
✔ 6/20/2023 10
✔ 6/20/2023 12
RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS








✔ 8/2/2023






REMARKS DATE


REMARKS DATE





RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RELEASED TO LIAISONS
DATE NO. OF SETS

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT : GO BENTO BGC
LOCATION : BHSE BGC TAGUIG CITY THE SPA BUILDING
TYPE OF PROJECT : FULL STORE

:
DESIGNER : ATTATCHMENTS
GENCON : ROBOLITE :
:
MECHANICAL :

REFERENCE NO.: CPRD005

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GENCON
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
19 *WATER METER CALIBRATION CERT. GENCON
20 *ELECTRIC METER CALIBRATION CERT. GENCON
21 FUNCTIONALITY CERTIFICATE SPECIALTY TRADE CONTRACTOR
22 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 GENCON
6 GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS
OTHER CONTRACTORS
Mechanical:
Gas: RCT

HARD COPY Fire Suppression: RCT


SOFT COPY Fire Protection:
FDAS:
GLASS: TYPE ONE GLASS

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS










RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS
✔ 5/11/2023 1

✔ 10/26/2023 1







✔ 5/1/2024


✔ 11/23/2023 1
✔ 11/23/2023 1
✔ 01/29/2024 1






✔ 2/2/2024 2

REMARKS DATE


REMARKS DATE

✔ 2/2/2024

2/2/2024


01/21/2023



RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RELEASED TO LIAISONS
DATE NO. OF SETS

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT : BONCHON SM BAGUIO
LOCATION : SM BAGUIO
TYPE OF PROJECT : FULL STORE

:
DESIGNER : ATTATCHMENTS
GENCON : BIBOSO :
:
MECHANICAL :

REFERENCE NO.: CPRD006

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GENCON
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
*WATER METER CALIBRATION CERT. GENCON
*ELECTRIC METER CALIBRATION CERT. GENCON
19 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 Automatic Kitche Hood Fire Suppression GENCON
CoC - Installation of additional exhaust duct,
6 relocate 1 sprinkler, repotion exhaust blower,
installation of 1 unit AC GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS
OTHER CONTRACTORS
Mechanical: RCT
Gas: RCT

HARD COPY Fire Suppression: RCT


SOFT COPY Fire Protection:
FDAS:
GLASS:

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS










RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS



✔ 5/3/2024
✔ 5/3/2024
✔ 5/3/2024


RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS



✔ 10/16/2023


















REMARKS DATE


REMARKS DATE

✔ 8/11/2023

10/11/2023


8/11/2023
✔ 10/11/2023

1/28/2024

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RELEASED TO LIAISONS
DATE NO. OF SETS

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT : BONCHON SM TANZA
LOCATION : SM TANZA TANZA, CAVITE
TYPE OF PROJECT : FULL STORE

:
DESIGNER : ATTATCHMENTS
GENCON : ANDRES & GONZAGA :
:
MECHANICAL :

REFERENCE NO.: CPRD008

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GAS, FP, FS CONTRACTOR
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
*WATER METER CALIBRATION CERT. GENCON
*ELECTRIC METER CALIBRATION CERT. GENCON
19 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 Automatic Kitche Hood Fire Suppression GENCON
6 Installation of Sprinkler GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS
OTHER CONTRACTORS
Mechanical: CONCEPTRADE
Gas: RCT

HARD COPY Fire Suppression: RCT


SOFT COPY Fire Protection:
FDAS:
GLASS:

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS










RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS




✔ 6/20/2023 10
✔ 6/20/2023 10
✔ 6/20/2023 10

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS





✔ 8/12/2023

✔ 8/12/2023


✔ 12/22/2023











REMARKS DATE


REMARKS DATE

✔ 12/28/2023

12/28/2023


12/28/2023

✔ 6/6/2023

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RELEASED TO LIAISONS
DATE NO. OF SETS

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
10/25/2022 2
10/25/2022 2
10/25/2022 2
10/25/2022 2
10/25/2022 2
10/25/2022 2
10/25/2022 2
10/25/2022 2
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT : BONCHON FARMERS
LOCATION : FARMERS PLAZA, QUEZON CITY
TYPE OF PROJECT : FULL STORE

:
DESIGNER : ATTATCHMENTS
GENCON : :
:
MECHANICAL :

REFERENCE NO.: CPRD007

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GENCON
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
*WATER METER CALIBRATION CERT. GENCON
*ELECTRIC METER CALIBRATION CERT. GENCON
19 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 Automatic Kitche Hood Fire Suppression GENCON
CoC - Installation of 3 units chilled water ACU &
6
EAB Rehab GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS
OTHER CONTRACTORS
Mechanical:
Gas: RCT

HARD COPY Fire Suppression: RCT


SOFT COPY Fire Protection:
FDAS: FEMSCO INDUSTRIES
GLASS:

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS










RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS



✔ 5/3/2024
✔ 5/3/2024
✔ 5/3/2024


RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS





✔ 12/28/2023
















REMARKS DATE


REMARKS DATE

✔ 1/30/2024

1/30/2024


1/30/2024
✔ 1/30/2024

2/2/2024

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RELEASED TO LIAISONS
DATE NO. OF SETS

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT : BONCHON NEWTON PLAZA
LOCATION : NEWTON PLAZA OLD STA. MESA MANILA
TYPE OF PROJECT : CLOUD KITCHEN

:
DESIGNER : ATTATCHMENTS
GENCON : :
:
MECHANICAL :

REFERENCE NO.: CPRD009

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GENCON
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
*WATER METER CALIBRATION CERT. GENCON
*ELECTRIC METER CALIBRATION CERT. GENCON
19 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 Automatic Kitche Hood Fire Suppression GENCON
6 GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS
OTHER CONTRACTORS
Mechanical:
Gas: TRES-A

HARD COPY Fire Suppression: TRES-A


SOFT COPY Fire Protection:
FDAS:
GLASS:

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS

03/29/2023 1


✔ 4/4/2022






RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS
✔ 12
✔ 12
✔ 12





RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS











✔ 06/13/2023










REMARKS DATE


REMARKS DATE



06/13/2023
✔ 06/13/2022


RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RELEASED TO LIAISONS
DATE NO. OF SETS

4/4/2023 1

4/4/2022 2
4/4/2022 3
4/4/2022 4

4/4/2023 2

4/4/2023 23

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT : BONCHON TUTUBAN
LOCATION : TUTUBAN CENTER, TONDO MANILA
TYPE OF PROJECT : FULL STORE

:
DESIGNER : ATTATCHMENTS
GENCON : CITILITES :
:
MECHANICAL :

REFERENCE NO.: CPRD010

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GENCON
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
*WATER METER CALIBRATION CERT. GENCON
*ELECTRIC METER CALIBRATION CERT. GENCON
19 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 Automatic Kitche Hood Fire Suppression GENCON
6 Sprinkler Installation GENCON
7 Installation of exhaust, freshair & ac units GENCON
8 Certificate of Completion ECE equipments GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS
OTHER CONTRACTORS
Mechanical: RCT
Gas: RCT

HARD COPY Fire Suppression: RCT


SOFT COPY Fire Protection: ALGON FIRETECH
FDAS: YEK YEU
GLASS:

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS










RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS



✔ 02/22/2024 12
✔ 02/22/2024 12
✔ 02/22/2024 12
✔ 02/22/2024 12

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS



✔ 12/23/2024

✔ 12/19/2023
✔ 6/1/2024










✔ 01/16/2024




REMARKS DATE


REMARKS DATE

✔ 1/17/2024

1/17/2024

✔ 1/17/2024
✔ 5/1/2024
✔ 1/17/2024

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RELEASED TO LIAISONS
DATE NO. OF SETS

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT : BONCHON STA. ANA
LOCATION : NO.5 BURKE BUILDING STA. ANA MANILA
TYPE OF PROJECT : CLOUD KITCHEN

DESIGNER : ATTATCHMENTS
GENCON :

MECHANICAL :

REFERENCE NO.: CPRD011

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GENCON
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
*WATER METER CALIBRATION CERT. GENCON
*ELECTRIC METER CALIBRATION CERT. GENCON
19 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 Automatic Kitche Hood Fire Suppression GENCON
6 GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
TS & DOCUMENTS
;
OTHER CONTRACTORS
Mechanical:
Gas:

:
HARD COPY Fire Suppression:
: SOFT COPY Fire Protection:
: FDAS:
GLASS:

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


RNED PARTY REMARKS
DATE NO. OF SETS DATE

ENCON ⧑

ENCON ⧑
ENCON ⧑
ENCON ✔
ENCON ✔
ENCON ✔
ENCON ⧑
ENCON ✔
MF ⧑
MF ⧑
MF ⧑


ENCON


ENCON


MF
RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
RNED PARTY REMARKS
DATE NO. OF SETS DATE
ENCON ✔ 12
ENCON ✔ 12
ENCON ✔ 12
AL CONTRACTOR ⧑
ADE CONTRACTOR ✔ 6/20/2023 12
ENCON ✔ 6/20/2023 10
ADE CONTRACTOR ⧑
ENCON ✔ 12
RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
RNED PARTY REMARKS
DATE NO. OF SETS DATE
ENCON ⧑
ENCON ⧑
ENCON ⧑
AL CONTRACTOR ⧑
AL CONTRACTOR ⧑
AL CONTRACTOR ⧑
ENCON ⧑
ENCON ⧑
ENCON ⧑
ENCON ⧑
ENCON ⧑
ADE CONTRACTOR ⧑
ADE CONTRACTOR ⧑
ADE CONTRACTOR ⧑
ADE CONTRACTOR ⧑
ADE CONTRACTOR ⧑
ENCON ⧑
ADE CONTRACTOR ⧑
AL CONTRACTOR ⧑
ADE CONTRACTOR ⧑
ENCON ⧑
ENCON ⧑
ADE CONTRACTOR ⧑

RNED PARTY REMARKS DATE

ENCON ⧑

ENCON ⧑

RNED PARTY REMARKS DATE

ENCON ⧑

ENCON


ENCON


ENCON
ENCON ⧑

ENCON ⧑

ENCON ⧑

ENCON ⧑

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


RNED PARTY REMARKS
DATE NO. OF SETS DATE
DCM ⧑
DCM ⧑
DCM ⧑
DCM ⧑
DCM ⧑
DCM ⧑
DCM ⧑
DCM ⧑
ELEASED TO MALL ADMIN RELEASED TO LIAISONS
NO. OF SETS DATE NO. OF SETS

04/19/2022 2
04/19/2022 3
04/19/2022 4

04/19/2022 2

04/19/2022 25

ELEASED TO MALL ADMIN RELEASED TO LIAISONS


NO. OF SETS DATE NO. OF SETS
ELEASED TO MALL ADMIN RELEASED TO LIAISONS
NO. OF SETS DATE NO. OF SETS
ELEASED TO MALL ADMIN RELEASED TO LIAISONS
NO. OF SETS DATE NO. OF SETS
CHECKLIST OF PLANS, REQUIREMENTS & DOCUMENTS
PROJECT :
LOCATION :
TYPE OF PROJECT :

:
DESIGNER : ATTATCHMENTS
GENCON : :
:
MECHANICAL :

REFERENCE NO.: CPRD001

ITEM PERMITS CONCERNED PARTY

1 CONTRATOR'S ALL RISK INSURANCE(CARI) GENCON

2 DOLE CERTIFICATE GENCON


3 CONSTRUCTION LOGBOOK GENCON
4 BUILDING PERMIT GENCON
5 ELECTRICAL PERMIT GENCON
6 SANITARY PERMIT GENCON
7 ELECTRONICS PERMIT GENCON
8 MECHANICAL PERMIT GENCON
9 BUSINESS PERMIT MF
10 SIGNED PERMIT MF
11 OCCUPANCY PERMIT MF

COC (Civil Works, Electrical, Plumbing/Sanitary,


Mechanical & Electronics Installation
12 GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
13
PROFESSIONALS - BUILDING PERMIT GENCON
SIGNED AND SEALED COPY OF PRC AND PTR OF
14
PROFESSIONALS - OCCUPANCY PERMIT MF

ITEM AS-BUILT PLANS CONCERNED PARTY

1 ARCHITECTURAL GENCON
2 ELECTRICAL GENCON
3 PLUMBING GENCON
4 MECHANICAL MECHANICAL CONTRACTOR
5 FIRE SUPPRESSION SPECIALTY TRADE CONTRACTOR
6 GAS GENCON
7 FIRE PROTECTION SPECIALTY TRADE CONTRACTOR
8 ECE GENCON
ITEM TEST RESULT AND CERTIFICATE CONCERNED PARTY
1 WATERPROOFING GENCON
2 FLOOD TEST GENCON
3 FIRE RETARDANT GENCON
4 SMOKE / LIGHT TEST MECHANICAL CONTRACTOR
5 CHEMICAL FLUSHING MECHANICAL CONTRACTOR
6 HYDRO TEST FOR AC PIPE (HYDROSTATIC) MECHANICAL CONTRACTOR
7 HYDRO TEST FOR FIRE PROTECTION PIPE GENCON
8 HYDRO TEST FOR WATERLINE GENCON
9 SLOPE / FLOW TEST GENCON
10 GRAVITY TEST GENCON
11 MEGGER TEST GENCON
12 NITROGEN LEAK TEST SPECIALTY TRADE CONTRACTOR
13 BUBBLE TEST SPECIALTY TRADE CONTRACTOR
14 SANITARY LEAK TEST SPECIALTY TRADE CONTRACTOR
15 WATERLINE LEAK TEST SPECIALTY TRADE CONTRACTOR
14 GLASS TEMPERING CERTIFICATE SPECIALTY TRADE CONTRACTOR
15 LOAD BALANCING (ELECTRICAL) GENCON
16 FDAS CERTIFICATE SPECIALTY TRADE CONTRACTOR
17 AIR BALANCING (EXHAUST & FRESHAIR) MECHANICAL CONTRACTOR
18 FIRE SUPPRESSION CERTIFICATE SPECIALTY TRADE CONTRACTOR
*WATER METER CALIBRATION CERT. GENCON
*ELECTRIC METER CALIBRATION CERT. GENCON
19 FIRE SAFETY CLEARANCE SPECIALTY TRADE CONTRACTOR
ITEM CHECKLIST CONCERNED PARTY

1 PUNCHLIST DCM GENCON


2 PUNCHLIST MALL GENCON

ITEM CERTIFICATE OF COMPLETION CONCERNED PARTY

1 Installation of Gas leak detector- Auto off GENCON


Installation of Fire Suppression System (Amerex
2
Brand) with Mechanical Shut-Off Valve
GENCON
Installation of Fire Suppression System (Lehavot
3
LVT Brand) with Auto Shut-Off Valve
GENCON
Installation of LPG Piping System with LPG Leak
4
test
GENCON
5 Automatic Kitche Hood Fire Suppression GENCON
6 GENCON
7 GENCON
8 GENCON

ITEM BUILDING PERMIT REQUIREMENTS CONCERNED PARTY

1 Sanitary/Plumbing Technical Specification DCM


2 Mechanical Technical Specification DCM
3 Electrical Technical Specification DCM
4 Electrical Design and Analysis DCM
5 Fire Protection Technical Specification DCM
6 Electronics Technical Specification DCM
7 Bill of Materials DCM
8 General Construction Specification DCM
DOCUMENTS

HARD COPY
SOFT COPY

RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS










RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN
REMARKS
DATE NO. OF SETS DATE NO. OF SETS






















REMARKS DATE


REMARKS DATE





RECEIVED FROM CONTRACTOR RELEASED TO MALL ADMIN


REMARKS
DATE NO. OF SETS DATE NO. OF SETS








RELEASED TO LIAISONS
DATE NO. OF SETS

RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
RELEASED TO LIAISONS
DATE NO. OF SETS
 OK
 NOT OK
 PENDING



GENCON
DCM CLOUD KITCHEN
MF FULL STORE
ELECTRICAL CONTRACTOR REN OVATION
MECHANICAL CONTRACTOR
S & P CONTRACTOR
GAS, FP, FS CONTRACTOR