�:,gruull �1,l JOB SAFETY ANALYSIS RECORD SHEET <:f>w,son
ser..id, aromcO
SHAYBAH NGL RECOVERY PLANT DEPARTMENT
JOB SAFETY ANALYSIS RECORD SHEET
PLANT/EQUIPMENT: SHAY8AH SNGL DEPARTMENT: Gas Facility Projects Dept. Revision No. Rev. D Date: 15-Feb-25
DIVISION/UNIT: SAGPD/ DPCU Shaybah JSA NO.: 19162-HS0602-JSA-022
DESCRIPTION OF JOB/TASK: Piping Installation, Fit-Up (tack/spot welding), ARC/Automatic Welding (SMAW/STICK, GMAW/MIG, GTAW/TIG), Gas Cutting, Grinding & SIMOPS Activities
LOCATION: 858 D69, 897, 896, 891 Tl/T2, 894, B53 and Laydown Area
PREPARED BY: Contrac REVIEWED BY: Construe · n Representa APPROVED BY: Unit Foreman
�A __.-,,---, /
DATE: DATE: /,6'"'-_h,b- v,
REVIEWED BY: PMT Construct on Representative
� ){,
DATE: DATE:
.
•
CSM Part 1-03 PPE
CSM Part 1-01 Emergency Reporting and
•
•
SAES-L-108-Selection of Valves
SAES-L-132-Materials Selection for Pipelines,
•
•
Hand tools
Power tools
•
• Safety Glass
PPE's:
Safety Hard hats (Welder Helmet�
Response 05-2018 Piping and Process Equipment • Crane • Safety Shoes
• CSM Part 1-02 Incident Reporting and • SAES-L-136-Pipe, Flange, and Fitting Material • Trailer truck • Safety Gloves
Investigation Requirements • Boom truck • Dust Mask
• CSM Part 1-04 Work Permit System and Stop • SAES-L-150-Pressure Testing of Plant Piping and • Forklift • Filtered Respiratory Mask
Work Authority Pipelines • Generators set • Face Shield
• CSM Part 1-05 Isolation Lockout a&Use of Hold • SAES-L-350-Construction of Plant Piping • Manlift/Scissor lift • Welding Apron
Tag • SAES-L-125-Safety Instruction Sheet for Piping • Air Blowers • Welding Hood/leg guard
• CSM Part 1-07 Fire Prevention and Pipelines • Air-compressor • Full Sleeve FRC Clothing
• CSM Part 1-08 Traffic Vehicle Safety • SAES-L-110-Limitations on Piping Joints and • Welding Machines (Semi-auto Welding Machine • Ear Plug/ear muff
• CSM Part 1-11 Hand Tools and Power Tools Components p260 DC 400, Auto Gas Cutting Machine with torch, • Full body Harness
• CSM Part 1-12 Material Handling • SAES-S-070-Installation ofUtility Piping Systems Auto Welding Machine with torch) • High Visibility Vest
• CSM Part 1-13 Heat Stress • SAES-W-011-Welding Requirements for On-Plot • Electrode heater
• CSM Part 11-02 Scaffolding. Piping • Rigging/Lifting gears
• CSM Part 11-04 Temporary Walking and • SAEP-324-Certification Review and Registration of • Pipe Jack Stands
Working Surfaces Project Welders • Chain Block/Come-along
• CSM Part 11-05 Fall Protection • SAEP-351-Bolted Flange Joints Assembly • Pulley
• CSM Part 11-10 Cutting Welding and Brazing • SAEP-352-Welding Procedures Review &Approval • Flange Jack
• CSM Part III-01 Machine Guarding • SAEP-1142-Qualification of Non-SA NOT • Wrap Around
• CSM Part III-02 Mechanical and Heavy Personnel • Hydraulic Jack
Equipment • SAEP-1160-Tracking and Reporting of Welding, • Preheating (ring fire Burner & Induction)
• CSM Part III-03 Electrical Equipment NOT and Pressure Testing for Capital Projects • Bolt Torqueing Machine
• CSM PartIII-07 Cranes and Lifting Equipment • SAMSS-010-Fabricated Steel Piping • Digital Temperature Machine
• CSM PartIII-08 Slings and Rigging Hardware • ASME Section IX Welding and Brazing • Electrical & Induction Heater machine
• SAES-A-004-General Requirements for Pressure Qualifications •
Testing • SAMSS-005-Butt Welding Pipe Fittings •
Pipe Roller, Roller trolley
• SAES-A-2060 Positive Material Identification • ASME Section VNon-Destructive Examination
Drip Tray /Secondary Containment for all stationary
equipment
• SAES-L-105-Pi in Line Classes
Page 1 of 22