APRACN02-Professional Practice 2: 8.
Acoustic Design belongs to what Architect’s
Administering the Regular Services of the services?
Architect Specialized Allied Services
FINAL EXAMINATION_ 2T2324 9. Architectural Lighting Layout and Design
Multiple Choice: belong to what Architect’s services?
Specialized Allied Services
1. It includes services such as consultation,
pre-feasibility studies, feasibility studies, site 10. In these services, the Architect-in-charge of
selection and analysis, site utilization and land- construction (AICC) is directly and
use professionally responsible and liable for the
Pre-Design Services construction supervision of the project.
Fulltime Supervision Services
2. It includes services such as Architectural
Research, Space Planning, Architectural 11. In these services, the Architect’s scope of
Programming and Space Management work includes Quality Control, Evaluation of 12.
Studies. Construction Work, Preparation of Daily
Pre-Design Services Inspection Reports and Filing of documents.
Fulltime Supervision Services
3. It includes services such as Value
Management, Design Brief Preparation and 13. In these services, the Architect serves as
Promotional Services. the Construction Manager (CM). His/Her
Pre-Design Services training in the coordination of various
specialties allows him/her to supervise and
4. In these services, Architect acts as the assure proper monitoring of all construction
Owner’s/Client’s/Proponent’s Adviser and/or activities with regards to quality, workmanship
Representative. He translates the Owner’s and cost.
needs and requirements to space and forms in
the best manner of professional service. Construction Services
Design Services
14. In these services, the scope of work of the
5. These services have the following phases: Architect includes Coordination and
Project Definition, Schematic Design, Design Supervision, Cost and Time Control, Quality
Development, Contract Document, Bidding or Control of Work and Keeping of Records.
Negotiation and Construction phases. Construction Services
Design Services
15. In these services, the Architect may be
6. In these services, Architecture may also be engaged as the Building Administrator and/or
defined as the blending of aesthetics, Property Manager of a commercial, industrial,
functions, space, materials and its environment residential or institutional building, facility or
resulting from the application of various complex to maximize the lifespan of the
technologies and skills in different fields. building/s in order to produce the maximum
Specialized Allied Services economic return.
Post-Construction Services
7. Architectural Interiors (AI) belong to what
Architect’s services? 16. In these services, the Architect is not
Pre-Design Services expected to perform all the services. Rather,
Design Services he/she is to act as the agent of the Client in
Comprehensive Architectural Services procuring and coordinating the necessary
Specialized Allied Services services required by a project.
Comprehensive Architectural Services
17. Among those included in these services are
Pre-Design Services, Regular Design Services, 25. The duties and responsibilities of the
Specialized Allied Services, Construction Architect cannot be properly discharged unless
Services and Post-Construction Services. his/her motives, conduct, and sense of moral
Comprehensive Architectural Services values, sensitivity, and ability are such as to
command ________ and ________.
18. In these services, the Architect renders Respect, confidence
professional services in the implementation of
his/her design. He/She assumes the 26. The Architect is engaged in a profession
professional responsibility and civil liability for which carries with it _________ responsibilities
both the design and the construction of the towards the public, whether such
project. responsibilities are the natural outcome of good
Design-Build Services citizenship or of his/her professional pursuit, or
whether they partake of informative and
19. According to him: “May the Architect be educational matters or of his/her normal
high-minded; not arrogant, but faithful; Just, interest in public welfare.
and easy to deal with, without avarice; Not let Civil
his mind be occupied by receiving gifts, but let
him preserve his good name with dignity…” 27. Which of the following the Architect cannot
Marcus Vitruvius Pollio do?
Use paid advertisement
20. In the 3-D wheel of a building project,
he/she is the one who decides to build. 28. Which of the following the Architect must
Owner not do?
Endorse any material of construction
21. Which PRBOA resolution adopted and
promulgated the Code of Ethical Conduct for 29. The Architect’s relation to his/her Client is
Registered and Licensed Architects and for dependent upon on this.
Holders of Temporary/Special Permits under Good faith
RA 9266?
Resolution No. 03 series of 2006 30. The Architect must endeavor to protect the
Client’s interests, except
22. The profession of Architecture calls for men When public interest is at stake
and women of the following qualities, except for
one. 31. How shall the Architect be compensated?
Highest integrity Solely through his/her professional fee directly
Responsiveness billed to the Client
Business acumen
Artistic and technical ability 32. If the Architect see errors in the Contract
*not sure since no answer provided Document, he/she shall
Not knowingly call upon the Contractor to
23. The Architect acts as professional adviser correct or remedy the errors to the Contractor’s
to his/her Client and his/her advice must be or the Owner’s financial disadvantage
___________.
Unprejudiced 33. If a Contractor or Subcontractor offers free
professional engineering or allied design
services to the Architect, the Architect may
24. The Architect is charged with the exercise Reject the offer because it will tend to place
of mediation and conciliation functions between him/her in an obligation to return the favor.
Client and Contractor and must act with entire
__________.
Impartiality
34. If the Architect inspected each phase of the 43. If, as an Architect, you know that a project
work completed by the Contractor and found has been previously committed to another
according to the terms of the Contract Architect and the Client wants you to takeover,
Documents, what must he/she do? what should you do?
Issue the corresponding Certificates of Notify the other Architect in writing and
Payment and the Final Certificate of determine that he/she has been duly
Completion, respectively, to the Contractor compensated for upon termination of their
agreement.
35. Describe the relationship of the Architect
with Manufacturers, Dealers and Agents. 44. The Architect may criticize the work of
One of vendor and vendee another Architect, provided
One of exchange of technical information The criticism is fair and constructive
36. What should an Architect do, if an agent or 45. As an employer, which of the following
firm handling building materials or equipment should the Architect not do?
offer him/her commissions, discounts, fees, Ask employees to work overtime without
gifts or favors? overtime pay
Credit all market discounts to the Client
46. From the Architect’s Credo: I shall work
37. Describe the Architect’s responsibilities in with this virtuous commitment: to exercise to
relation to his/her colleagues and subordinates. the utmost my duty to myself, my country and
One of moral responsibilities my _____.
God
38. Which of the following should the Architect
do? 47. The Architect shall abide by the laws, rules
Secure a professional service agreement with and legal orders, statutory policies, and
his/her Client first before rendering professional measures of the country, including the
services following, except
Code of Ethical Conduct
39.If the Architect shall undertake a civic or Standards of Professional Practice
religious project, he may Articles of Incorporation and By-laws of IAPOA
Donate his professional service *not sure since no answer provided
40. The Architect may submit solicited or 48.Which provision in RA 9266 states in part
unsolicited sketches or drawings in competition that a candidate for licensure examination must
with other Architects have a specific record of a least 2 years or
Unless the arrangement is conducted equivalent of diversified architectural
substantially under the terms of Architectural experience duly certified by a
Competition Code. registered/licensed architect?
Section 13
41. If the Architect has direct involvement in the
formulation of the Program in an Architectural 49.What is currently the total minimum credit
Competition hours of diversified architectural experience
He/she shall not enter as competitor because required for a candidate for licensure
he/she will have an advantage over the other examination?
competitors 3840 hours
42. As an Architect who knew that a project is 50. Which law requires Continuing Professional
in the process of being committed to another Development (CPD) as the mandatory
Architect, requirement for the renewal of Professional
You shall not, under any circumstances or Identification Card?
through any means, solicit such project. RA 10912
6. Method of selection for an Architect most
51. The PRC issued Professional Identification often used by an individual person undertaking
Card for Architects is renewable every how a relatively small project
many years?
Three years Direct
52. What is the maximum creditable units for
Self-Directed and/or Lifelong Learning in a 7. What is the minimum basic fee for
compliance Period for Licensed and Registered museums?
Architects? 12%
10 CUs
For Departmental Exam 8. Duly notarized written contract or equivalent
public instrument stipulating the scope of
Prepared by: Ar. Phil Arlou Dela Cruz services and guaranteeing compensation of
such services.
1. The third phase of an architect's regular Service Agreement
services.
Design Development 9. The minimum fee per appearance of an
architect when rendering service as an expert
witness shall be.
2. Architect's construction period and burden of
services, the charges pertaining to services 200PHP
rendered shall be doubled. A suspension of 500PHP
construction for a period not exceeding ____
months shall not be covered by this provision. 750PHP
6 Months Free of Charge
None (not less than P5,000 per appearance)
3. In what phase in Architects regular design
services Does periodic visits to the site to
10. Invitations issued to prospective bidders,
familiarize himself with the general progress
giving information as to the nature of the
and quality of the work?
proposed project, conditions for the issuance of
Construction contract documents, date of bidding, and
estimated cost or information that would give
the Contractor a general idea of the magnitude
4. This shall be issued by the Owner to the and extent of the project.
Contractor following the execution of the Invitation To Bid
Contract Agreement.
Notice to Proceed
11. What is the general basis of the Architects
minimum basic fee?
5. Most expensive and time-consuming method PCC
of selecting the Architect.
Design Competition
12. Which work item is chargeable to the 21. In repetitive construction of building, what
Owner and not included in the regular scope of percent of the basic minimum fee is charged on
services? third structure?
3d model 40%
13. In Regular Design Services of an Architect, 22.Minimum basic fee for simple projects.
what is the minimum basic fee for projects that
are under Group 3: Exceptional Buildings? 5%
None (7%)
23. Minimum basic fee for
alterations/renovations.
14. Not included in the scope of practice of
Architecture. 150%
Structural Design
24. When the architect is engaged to render
opinion or advise, clarification or explanation
15. What pre-design service involves on technical matters pertaining to his
preliminary studies involve the procurement, profession, the minimum basic fee shall be
analysis and use of secondary information ___.
gathered for the project to aid the Client in
early decision-making? 200 / Hr
Pre-Feasibility Studies 500 / Hr
750 / Hr
16. What is PD 1096? Free of Charge
National Building Code None (not less than P1,000.00/hr)
Condominium and Subdivision Buyers 25. When rendering service as an expert
Protective Law 2 witness, the architect is compensated ___/ hr.
17. What is U.A.P Doc 201? 200 PHP
Pre-Design Services 500 PHP
1000 PHP 3
18. What is U.A.P Doc 202? Free of Charge
Regular Design Services None (not less than P1,000.00/hr)
19. What is U.A.P Doc 203? 26. What is Group 6 Project classification?
Specialized Architectural Services Repetitive
20. What is U.A.P Doc 205? 27. Under what classification of Project does
Hospitals and Medical Buildings fall?
Post Construction Services Exceptional
28. Under what classification of Project does 36-41 List down the 6 Phases of Regular
Stadium fall? Design Services (IN ORDER)
Exceptional project definition phase
Schematic design phase
29. In repetitive construction of building, what Design development phase
percent of the basic minimum fee is charged on
succeeding structures after the third structure? Contract document phase
None (30%) Bidding or negotiation phase
Construction phase
30. What part of Architects services is
architectural programming? 42-44: List down the 3-Methods of Selection
Schematic design of an Architect/Architectural Firm
Direct selection
31. Under what phase of design services does Comparative selection
the architect prepare complete construction Architectural design competition
drawings and specifications on
materials/construction methods?
Contract documents 45-49: List down the 5-External
Environment
Political and Regulatory
32. What is the meaning of “RLA”
Economic
Registered and Licensed Architect
Competitive
Technological
33. What is the meaning of “PCC”
Social and cultural
Project Construction Cost
34. Basic Fee based on PCC of Residential
Project?
10%
35. This Method Compensation may be applied
to government project since they entail more
paper works and time-consuming efforts.
Lump sum/ Fixed fee