EW17 EW13 Sanigwan EW1 TW2 EW4 TW3 EW7 EW10 EW15 Sanigwan Naubasta East Hanspuram Pasupathi Nagar Yashoda Nagar East Yashoda Nagar West LOCATION Shyam Nagr Sujat Ganj Shyam NagarKDA Colony OHST Present Work Status Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
KL KL KL KL KL KL KL KL KL KL KL KL KL KL KL KL KL KL KL KL KL
800 1600 1100 800 1600 800 1600 1700 1700 1700 600 1700 1600 1300 1300 2100 800 800 1700 800 775
Top Dome Completed and Railing Work Completed. Bottom Dome Completed and Top Dome shuttering in progress. Bottom Dome Completed and Top Dome casting completed. Bottom Dome Completed. Bottom Dome Completed. Above Wall 4th lift completed. Bottom Dome shuttering in progress. Full Staging Completed . Bottom Dome Completed.Top dome completed. Full staging completed Top Dome Completed. Top Dome Completed and Testing completed,Painting Work in progress. Full staging completed Bottom Dome Completed. Bottom dome slab Shuttering in completed and steel in progress. Full staging completed . Bottom dome slab casted and Top dome shuttering in progress. Top Dome Completed and Pipe work completed. Top Dome Completed. Bottom dome slab casted and 2nd lift tank wall shuttering in progress. Excavation is started.(But Hold By Local Public) Top dome slab Completed and Pipe work Completed. Court stay Work Stop due to Court Stay
GW4
SW3 SW9 CW2
Chedising ka Purrwa(Barra)
Naubasta West Bingawan TW+ Barrage Saraimita Dabouli
CW1 GW3 GW1 SW4 Ratan Lal Nagar Gujjaini Colony Barra East-II Barra East-I Tiwaripur jaj mau north Kidwai nagar South Atwa
SR.NO.
ZONE NO.
LOCATION Kalyanpur Sukhnipur Karrahi Chandari Delhi Sujanpur Village Krishnanagar Basant Vihar Chakeri Sekhpur Barra West Safipur Safipur Harjinder nagar
OHST
Remarks
22 23 24 25 26 27 28 29 30 31 32
KL KL KL KL KL KL KL KL KL KL KL
250 575 700 1700 900 1400 600 500 1400 1000 200
Top dome slab completed. Full staging completed and Bottom Dome salb Shuttering in progress Top Dome completed and Pipe work completed. Raft Completed and Work Completed up to 2nd brace. Top Dome completed and fittings completed. Half Staging Completed. Bottom Dome casting completed. RCC work completed up to GL and column up to second brace completed. Land Not cleared Land Not cleared location changed ,but new location yet not decided.
SHYAMNAGAR KDA 1 COLONY 2 Shyamnagar Sujat Ganj 3 JAJMAU SOUTH 4 JAJMAU NORTH 5 EAST IPS PHOOL BAGH 6 CWR AT 200 MLD 7 KALYANPUR 8 GANDHIGRAM 9 BARRA EAST-II 10 BARRA GAON 11 Bingawan 12 Yashodanagar East 13 Yashodanagar West 14 Tiwaripur jajmau north 15 Delhi Sujanpur Village 16 IPS Juhi Gaushala 17 Usman pur 18 Gujaini 19 Naubasta east
1000KL 500KL 200KL 200KL 3700KL 4200KL 500KL 540KL 400KL 665KL 1000KL 1000KL 1000KL 1000KL 500KL 1700KL 1000KL 1200KL 1000KL
Third lift wall completed. Top Slab casted and railing work completed. Top Slab of CWR casted. Full wall completed Top Slab of CWR completed. Full wall completed and 80% Top Slab Casting Completed. Top Slab of CWR casted and Railing completed. full Wall Completed . Top Slab of CWR casted . Top Slab of CWR casted. Top Slab of CWR casted. Top Slab of CWR casted. Top Slab of CWR casted. Top Slab of CWR casted and Railing completed. Top Slab of CWR casted. Top Slab of CWR casted. Top Slab of CWR casted and Railing completed. Top Slab of CWR casted. Half Wall Completed
Sr.No.
Location
CAPACITY
Remarks
20 Saraimita 21 Ompurwa 22 Sanigwan 23 Karhi(200KL) 24 Karhi (400KL) 25 Jarauli 26 Naubasta West 27 Krishna Nagar 28 Safipur Safipur Harijender 29 Nagar 30 Chandari 31 Pasupathi Nagar 32 Kidwai nagar South 33 Basant vihar 34 Barra West 35 Barra East-I 36 Dabouli 37 Ratan Lal Nagar
Chedising ka
1000KL 900KL 700KL 200KL 400KL 200KL 800KL 1000KL 600KL 1000KL 1000KL 900KL 500KL 900KL
800KL 400KL 800KL 800KL
Top Slab of CWR casted. Raft completed. Top Slab of CWR casted and Railing completed. Top Slab of CWR casted and Railing completed. Top Slab of CWR casted and Railing completed. Half Wall Completed Top Slab of CWR casted and Railing completed. Excavation completed. Land not Cleared Land not Cleared Land not Cleared Land not Cleared Land not Cleared CWR Cancelled. Land not Cleared Raft Completed and second lift wall completed. Full Wall Completed. Raft Completed and third lift wall completed. Court Stay Court Stay Court Stay
STATUS OF WORK PROGRESS OF PUMP HOUSE AT KANPUR WATER SUPPLY PROJECT PHASE-II
Sr.No. Location Area in Sqm Present Work Status Remarks
SHYAMNAGAR KDA 1 COLONY 2 Shyamnagar Sujat Ganj 3 JAJMAU SOUTH 4 JAJMAU NORTH 5 EAST IPS PHOOL BAGH 6 CWR AT 200 MLD 7 KALYANPUR 8 GANDHIGRAM 9 BARRA EAST-II 10 BARRA GAON 11 Bingawan 12 Yashodanagar East 13 Yashodanagar West
96 60 60 60 360 360 80 60 60 60 96 96 96
Work completed up to Plith level and plinth slab completed. Work Completed up to Raft . Work completed of roof slab and finishing work in progress. Old tube well in Area Work completed up to Plith level and plinth slab completed. Work complete up to Ground level. Work completed up to Roof slab. Work Completed up to Roof slab level Work Completed up to Roof slab level roof slab shuttering in progress. Work completed up to Raft level and 3rd lift Wall in progress. Work completed up to plinth slab in progress. Work completed up lintel level.
Sr.No.
Location
Area in Sqm
Remarks
14 Tiwaripur jajmau north 15 Delhi Sujanpur Village 16 IPS Juhi Gaushala 17 Usman pur 18 Gujaini 19 Naubasta east 20 Saraimita 21 Ompurwa 22 Sanigwan 23 Karhi 24 Karhi 25 Jarauli 26 Naubasta West 27 Krishna Nagar 28 Safipur Safipur Harijender 29 Nagar 30 Chandari 31 Pasupathi Nagar 32 Kidwai nagar South 33 Basant vihar
96 60 250 96 96 96 96 96 60 60 60 60 60 96 60 96 96 96 60 96
Land problem due to OHT Work completed up lintel level. Work completed up to plinth level slab in progress. Work completed up Plinth level. Work completed of raft and lintel level completed. Work completed up to Raft level and 3rd lift Wall in progress. Plinth slab shuttering in progress. Filled up soil at site Excavation and PCC Completed and Raft completed and third lift in progress. Work completed lintel level Hindrance problem due to pipe Work will Start in month of August 2011. Work completed up lintel level. Filled up soil at site Land not Cleared Land not Cleared Court Stay Court Stay Court Stay Already pump house existing.
Sr.No.
Location
Area in Sqm
Remarks
60 60 60 60 96 60
Land not Cleared Work completed up Raft level. Work will Start in month of August 2011. Work will Start in month of August 2011. Land Space problem Land not cleared.
39 Ravidas Puram
SHYAMNAGAR KDA 1 COLONY 2 Shyamnagar Sujat Ganj 3 JAJMAU SOUTH 4 JAJMAU NORTH 5 EAST IPS PHOOL BAGH 6 CWR AT 200 MLD 7 KALYANPUR 8 GANDHIGRAM 9 BARRA EAST-II 10 BARRA GAON 11 Bingawan 12 Yashodanagar East 13 Yashodanagar West
22 22 22 22 22 22 22 22 22 22 22 22 22
Work Completed up to Roof slab and plaster completed. Work Completed up to Roof slab and plaster completed. Excavation statred Work Completed up to Roof level. Work Completed up to Roof level. Work will Start in month of August 2011. Work Completed up to slab level and door and windows completed. Work Completed up to Roof level. Work completed up to Roof Slab and plaster completed. Work Completed up to Roof slab level. Work Completed up to Roof slab level. Land space problem due to pump house Labour hutment problem
Sr.No.
Location
Area in Sqm
Remarks
14 Tiwaripur jajmau north 15 Delhi Sujanpur Village 16 IPS Juhi Gaushala 17 Usman pur 18 Gujaini 19 Naubasta east 20 Saraimita 21 Ompurwa 22 Sanigwan 23 Karhi 24 Karhi 25 Jarauli 26 Naubasta West 27 Krishna Nagar 28 Safipur Safipur Harijender 29 Nagar 30 Chandari 31 Pasupathi Nagar 32 Kidwai nagar South 33 Basant vihar 34 Barra West
22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
Land problem due to OHT Work Completed up to Roof slab and plaster completed. Work Completed up to Lintel level. Work completed up to roof slab level Land problem due to OHT Work Completed up to Raft. Work will Start in month of August 2011. Work Completed up to Roof slab and plaster completed. Work Completed up to Roof slab and plaster completed. Work completed up to plinth level Hindrance problem due to pipe Work will Start in month of August 2011. Work Completed up to Roof slab and plaster completed. Filled up soil at site Land not Cleared Land not Cleared Court Stay Court Stay Court Stay Work Completed up to Lintel level. Land not Cleared
Sr.No.
Location
Area in Sqm
Remarks
22 22 22 22 22
Excavation started Work Completed up to Roof slab . Work will Start in month of August 2011. Land Space problem Land not cleared.
39 Ravidas Puram
SHYAMNAGAR KDA 1 COLONY 2 Shyamnagar Sujat Ganj 3 JAJMAU SOUTH 4 JAJMAU NORTH 5 EAST IPS PHOOL BAGH 6 CWR AT 200 MLD 7 KALYANPUR 8 GANDHIGRAM 9 BARRA EAST-II 10 BARRA GAON 11 Bingawan 12 Yashodanagar East 13 Yashodanagar West
16 16 16 16 16 16 16 16 16 16 16 16 16
Work Completed up to Roof slab and plaster completed. Work Completed up to Roof slab and plaster completed. Excavation statred Work Completed up to Roof level. Work Completed up to Roof level. Work will Start in month of August 2011. Work Completed up to slab level and door and windows completed. Work Completed up to Roof level. Work completed up to Roof Slab and plaster completed. Work Completed up to Roof slab level. Work Completed up to Lintel level. Land space problem due to pump house Labour hutment problem
Sr.No.
Location
Area in Sqm
Remarks
14 Tiwaripur jajmau north 15 Delhi Sujanpur Village 16 IPS Juhi Gaushala 17 Usman pur 18 Gujaini 19 Naubasta east 20 Saraimita 21 Ompurwa 22 Sanigwan 23 Karhi 24 Karhi 25 Jarauli 26 Naubasta West 27 Krishna Nagar 28 Safipur Safipur Harijender 29 Nagar 30 Chandari 31 Pasupathi Nagar 32 Kidwai nagar South 33 Basant vihar 34 Barra West
16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
Land problem due to OHT Work Completed up to Roof slab level. Excavation completed. Work completed up to roof slab level Land problem due to OHT Excavation completed. Work will Start in month of August 2011. Work Completed up to Roof slab and plaster completed. Work Completed up to Roof slab. Work will Start in month of August 2011. Hindrance problem due to pipe Work will Start in month of August 2011. Work Completed up to Roof slab. Filled up soil at site Land not Cleared Land not Cleared Court Stay Court Stay Court Stay Excavation completed. Land not Cleared
Sr.No.
Location
Area in Sqm
Remarks
16 16 16 16 16
Excavation started Work Completed up to Roof slab . Work will Start in month of August 2011. Land Space problem Land not cleared.
39 Ravidas Puram
STATUS OF WORK PROGRESS OF METER ROOM AT KANPUR WATER SUPPLY PROJECT PHASE-II
Sr.No. Location Area in Sqm Present Work Status Remarks
SHYAMNAGAR KDA 1 COLONY 2 Shyamnagar Sujat Ganj 3 JAJMAU SOUTH 4 JAJMAU NORTH 5 EAST IPS PHOOL BAGH 6 CWR AT 200 MLD 7 KALYANPUR 8 GANDHIGRAM 9 BARRA EAST-II 10 BARRA GAON 11 Bingawan 12 Yashodanagar East 13 Yashodanagar West
9 9 9 9 9 9 9 9 9 9 9 9 9
Work Completed up to Roof slab and plaster completed. Work Completed up to Roof slab and plaster completed. Excavation statred Work Completed up to Roof level. Work Completed up to Roof level. Work will Start in month of August 2011. Work Completed up to slab level and door and windows completed. Work Completed up to Roof level. Work completed up to Roof Slab and plaster completed. Work Completed up to Roof slab level. Work Completed up to Lintel level. Land space problem due to pump house Labour hutment problem
Sr.No.
Location
Area in Sqm
Remarks
14 Tiwaripur jajmau north 15 Delhi Sujanpur Village 16 IPS Juhi Gaushala 17 Usman pur 18 Gujaini 19 Naubasta east 20 Saraimita 21 Ompurwa 22 Sanigwan 23 Karhi 24 Karhi 25 Jarauli 26 Naubasta West 27 Krishna Nagar 28 Safipur Safipur Harijender 29 Nagar 30 Chandari 31 Pasupathi Nagar 32 Kidwai nagar South 33 Basant vihar 34 Barra West
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
Land problem due to OHT Work Completed up to Roof slab level. Excavation completed. Work completed up to roof slab level Land problem due to OHT Excavation completed. Work will Start in month of August 2011. Work Completed up to Roof slab and plaster completed. Work Completed up to Roof slab. Work will Start in month of August 2011. Hindrance problem due to pipe Work will Start in month of August 2011. Work Completed up to Roof slab. Filled up soil at site Land not Cleared Land not Cleared Court Stay Court Stay Court Stay Excavation completed. Land not Cleared
Sr.No.
Location
Area in Sqm
Remarks
9 9 9 9 9
Excavation started Work Completed up to Roof slab . Work will Start in month of August 2011. Land Space problem Land not cleared.
39 Ravidas Puram
1
Jajmau North (EW-14)
NO. NO.
Shyamnagar Sujat ganj
10 10 10 10 10 10 10 10 10 10 10 10
Location changed by jal sansthan(new layout drawing to be submitted) Work completd up to lintel level.
2 3
Ompurwa
NO. NO.
Gandhigram
Work will Start in month of August 2011. RCC of Roof Slab Completed . Work will Start in month of August 2011. Work will Start in month of August 2011. court Stay for land Work will Start in month of August 2011. Land Space problem Land Space problem Work will Start in month of August 2011. Work will Start in month of August 2011.
4 5
Shyamnagar KDA
NO. NO.
Pashupati nagar
6 7
Kalyan pur
NO. NO.
Yashodanagar East
8 9
Naubasta East
NO. NO.
Naubasta West
10 11
Bingawan TW+ Barrage
NO. NO.
12
Sr.No.
Location
No.s
Area
Work Status
Remarks
Sanigwan
13
Yashodanagar West
NO. NO.
Barra East-II
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
Work will Start in month of August 2011. Work will Start in month of August 2011. RCC of Roof Slab Completed and plaster completed. RCC of Roof Slab Completed . Work Completed up to Lintel level. Work Completed up to Lintel level. RCC of Roof Slab Completed . Work will Start in month of August 2011. Work Completed up to roof slab level. RCC of Roof Slab Completed and plaster completed. RCC of Roof Slab Completed and plaster completed.
Filled up soil Land not cleared Land not cleared Land space problem due to OHT. Court Stay for land
14 15
Barra Gaon
NO. NO.
Saraimita
16 17
Jarauli
NO. NO.
Usmanpur Ratanlalnagar Dabouli
18 19 20 21
Karhi-1
22
Karhi-2
23 24 25 26 27 28 29
Krishna Nagar Safipur Safipur Harijender Nagar Tiwari pur Jajmou North Chandari East IPS Phool baug
Sr.No.
Location
No.s
Area
Work Status
Remarks
30 31 32 33 34 35 36 37 38 39 40
Hanspuram Delhi Sujanpur KDA Colony Kidwai Nagar South South IPS - JUHI GAUSHALA Basant Bihar Sanigwan Chedising ka Purrwa(Barra) Barra West Barra East-I Gujjaini Colony Ravidas Puram
NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO.
10 10 10 10 10 10 10 10 10 10 10
Work will Start in month of August 2011. Work will Start in month of August 2011. Work will Start in month of August 2011.
Land Space problem Land not cleared
STATUS OF WORK PROGRESS OF TUBE WELL AT KANPUR WATER SUPPLY PROJECT PHASE-II
Sr.No. Location Present Work Status Remarks
1 Hanspuram(tadakpur) 2 Bingawan(Asha Devi temple) 3 Bingawan(Primary School) 4 Hanspuram (OHST site) 5 Sanigwan-II 6 Bingawan 7 Tulsiapur(Bingawan) 8 Sukhnipur 9 Chakeri,Atwa 10 Chakeri,Atwa-II 11 Chaeri khajuria-2 12 Chakeri Sekhpur
Bore Completed and Pipe Casing Completed and Wash of Water completed. Bore Completed and Pipe Casing Completed and Wash of Water completed. Bore Completed and Pipe Casing Completed and Wash of Water completed. Bore Completed and Pipe Casing Completed and Wash of Water completed. Bore Completed and Pipe Casing Completed and Wash of Water completed. Boring work not started due to Passage problem Location cancelled Boring Completed and Pipe lowering completed. Final Testing completed and Civil work of Pump house started. Final Testing completed and Civil work of Pump house started. Boring Completed and Pipe lowering completed. Boring Completed and Pipe lowering completed.
STATUS OF WORK PROGRESS OF TUBE WELL PUMP M AT KANPUR WATER SUPPLY PROJECT PHASE-II
Sr.No. Location Present Work Status Remarks
1 Bingawan(ashadevi temple) 2 Hanspuram (todak pur) 3 Hanspuram 4 Chakeri kulgaon 5 Ckakeri Sukhnipur 6 Ckakeri Trilok pur 7 Chakeri Sekhpur 8 Chaeri khajuria-2 9 Bingawan(primary school) 10 Sanigawan-II 11 Bingawan 12 Tulsiapur(Bingawan)
Finishing(painting) completed. RCC Slab Completed and Plaster completed and handover completed to UP jal nigam RCC Slab Completed and Plaster completed and handover completed to UP jal nigam Finishing(painting) completed. Boring work in progress Finishing(painting) completed. Boring work completed. Work completed up to slab level. Finishing(painting) completed. RCC Slab Completed and Plaster work completed. Finishing(painting) completed. Location cancelled
1
Jajmau North (EW-14)
NO. NO.
Shyamnagar Sujat ganj
34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2
Finishing completed Finishing completed Finishing completed Roof slab completed. Finishing completed Finishing under progress Finishing completed Finishing completed Finishing completed Finishing completed Finishing completed Finishing completed Finishing completed
2 3
Ompurwa
NO. NO.
Gandhigram
4 5
Shyamnagar KDA
NO. NO.
Pashupati nagar
6 7
Kalyan pur
NO. NO.
Yashodanagar East
8 9
Naubasta East
NO. NO.
Naubasta West
10 11
Bingawan TW+ Barrage
NO. NO.
Sanigwan
12 13
NO.
Sr.No.
Zone
Location
No.s
Area
Work Status
Remarks
Yashodanagar West
14
Barra East-II
NO. NO.
Barra Gaon
34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2 34.2
Finishing completed Finishing completed Finishing completed Finishing completed Finishing completed Finishing completed Finishing completed Finishing completed Finishing completed Finishing completed
Work completed up to roof slab level Land not cleared Land not cleared Land space problem due to OHT. Court Stay for land
15 16
Saraimita
NO. NO.
Jarauli
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Usmanpur Ratanlalnagar Dabouli Karhi-1 Karhi-2 Krishna Nagar Safipur Safipur Harijender Nagar Tiwari pur Jajmou North Chandari Hanspuram Kidwai Nagar South South IPS - JUHI GAUSHALA Basant Bihar Sanigwan
NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO. NO.
Work will Start in month of August 2011. Work will Start in month of August 2011. Work will Start in month of August 2011.
Sr.No.
Zone
Location
No.s
Area
Work Status
Remarks
34 35 36 37 38 39 40
Chedising ka Purrwa(Barra) Delhi sujanpur Gujjaini Colony Ravidas Puram Chakeri kalyanpur Chakeri Atwa Chakeri sekhpur
Land Space problem Work Completed up to roof slab level excavation completed. Land not cleared Work Completed up to lintel level Work Completed up to roof slab level Work completed up to lintel level
Shayamnagar KDA 1 Chakeri Atwa(kulgaon) 2 Chakeri Atwa(trilokpur) 3 Chakeri Kalyanpur 4 Chakeri Atwa 5 Shyanagar Sujatganj 6 Gandhigram 7 Pashupatinagar 8 9 10 11 12 Hanspuram Naubasta East Sanigwan Yashodanagar West Bk work up to coping about 219 RM is completed Bk work up to coping about 149 RM is completed Bk work up to coping about 60 RM is completed Bk work up to coping about 145 RM is completed Bk work up to coping about 210 RM is completed Bk work up to coping about 110 RM is completed Bk work up to coping about 222 RM is completed Bk work up to coping about 133 RM is completed Bk work up to coping about 112 RM is completed Bk work up to coping about 52 RM is completed Bk work up to coping about 85 RM is completed Bk work up to coping about 189 RM is completed
13
Bk work up to coping about 119.50 RM is completed Bk work up to coping about 260 RM is completed Bk work up to coping about 357 RM is completed Bk work up to coping about 240 RM is completed
SR.NO.
LOCATION
Work Status
Remarks
Bk work up to coping about 370 RM is completed Bk work up to coping about 70 RM is completed Bk work up to coping about 45 RM is completed Bk work up to coping about 70 RM is completed
STATUS FOR GA DRAWINGS AND STRUCTURAL DRAWINGS FOR 200 MLD WTP & INTAKE
Sr. No. Drawing No Description Sheet Revision Design & Drawing Work in progress Remarks
RIL/09-01/R0/09/WTP200/civil -102
Inlet Works
01 nos
Approved fm IIT
Silt Excluder With Raft and Columns up to Base Slab Completed and Inlet Channel Footings and Plinth Beam And Column Completed 2 No's Clarifiers ready for errection,3rd clarifier only 10% Work remaning,4th Clarifier Launder base Slab casting in progress. RCC Work up to header base Channel Completed and Filter bed Casting in progress.
RIL/09-01/R0/09/WTP200/civil -103
Clariflocculator
01 nos
Approved fm IIT
RIL/09-01/R0/09/WTP200/civil -104 RIL/09-01/R0/09/WTP200/civil -105 RIL/09-01/R0/09/WTP200/civil -105 RIL/09-01/R0/09/WTP200/civil -106 RIL/09-01/R0/09/WTP200/civil -107 RIL/09-01/R0/09/WTP200/civil -108 RIL/09-01/R0/09/WTP200/civil -109
Filter House
04 nos
Approved fm IIT
01 nos
Approved fm IIT
Top Slab of CWR Casting completed Work completed up to ground Floor Slab .
01 nos
Approved fm IIT
01 nos
Approved fm IIT
Brick masonary and Roof Shed Completed and Plaster work Completed RCC of First Floor and Slab Completed and Second floor Slab Shuttering in progress Excavation and PCC,RaftCompleted of one tank . About 119 Rm is completed up to coping
7 8 9 10
01 nos 01 nos
0 0 0
HT, LT Transformer room 01 nos Boundry wall with piles Boundry wall without piles 120 Rm 500 Rm
RIL/09-01/R0/09/WTP200/civil -101
02 nos
Approved fm IIT
Ground Floor Slab Completed and Columns Completed up to Bracket level ,Brick masonry in progress
Sr. No.
Drawing No
STATUS FOR GA DRAWINGS AND STRUCTURAL DRAWINGS FOR 28.5 MLD WTP Description Sheet Revision Remarks First Clarifier is ready for Errection, Second Clarifier only 10% Work remaining for Errection Approved fm IIT 1 0 Approved fm IIT Work Completed up to Slab Bottom and Slab Shuttering in progress
1 2
RIL/09-01/R0/09/WTP- Clariflocculator 01 nos 28.5/civil -101 Inlet / Outlet Plan for Clariflocculator 01 nos RIL/09-01/R0/09/WTP28.5/civil -102 RIL/09-01/R0/09/WTP28.5/civil -103 RIL/09-01/R0/09/WTP28.5/civil -104 RIL/09-01/R0/09/WTP28.5/civil -105
Filter House
04 nos
Approved fm IIT
RCC Work Completed up to Filter Bed and Wall Above filter bed in progress Top roof Slab Casted. Bk masonary completed up to First slab. RCC Wall Completed up to Top of One settling Tank and Recirculation pump House Raft Completed
4 5 6
Chemical House Settling Tank with pump huose HT, LT Transformer room
01 nos 01 nos
0 0 0
RAMKY INFRA STRUCTURE LIMITED KANPUR WATER SUPPLY PROJECT Pipe Laying Status Date:- 25.10.2011
SR NO Description of Pipe BOQ Quantity Quantity Received Laying Completed Remarks
PSC Pipes
1 2 3 4 5 6 7 8 9 10 11 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1400 mm 1500mm Total 3846 2342 530 1600 6881 5226 2750 970 350 6000 9075 1100 40670 16385 5835 3972 26192 26026 1929 1086 1249 687 551 332 106 55 32021 7160 3600 10760 35100 40373 22227 17822 10736 3424 1767 532 131981 841492 43136 19244 903872 3990.0 2695.0 590.0 1350.0 6880.0 5210.0 2750.0 740.0 270.0 5560.0 8140.0 1100 39275.0 16385 5835 3972 26192 26005.5 1929 1134 1247 685.5 539 328.5 102 54 32024.5 7160 3600 10760 35080 40360 22227 17810 10720 3424 1767 532 131920 818961 43136 19244 881341 3100 1415 320 0 4125 4290 2267 545 255 1500 2250 950 21017 5872 3452 3816 13140 2104.5 1003.5 808 1096 657 530 50 100 0 6349 3028 3085 6113 26878 28168 21254 9743 4945 1959 1454 60 94461 743937 32954 13177 790068 201315 1845 1280 204440
GRP Pipes
12 13 14 350 mm 400 mm 450 mm Total
DI Pipes (K-7)
15 16 17 18 19 20 21 22 23 100 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm Total
DI Pipes (K-9)
24 25 250 mm 300 mm Total
AC Pipes
26 27 28 29 30 31 32 33 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm Total
PVC Pipes
34 35 36 110 mm 140 mm 160 mm Total
STATUS FOR GA DRAWINGS AND STRUCTURAL DRAWINGS FOR 200 MLD WTP & INTAKE
Sr. No. Drawing No Description Sheet Revision Design & Drawing Work in progress
RIL/09-01/R0/09/WTP200/civil -102
Inlet Works
01 nos
Approved fm IIT
RIL/09-01/R0/09/WTP200/civil -103 RIL/09-01/R0/09/WTP200/civil -109 RIL/09-01/R0/09/WTP200/civil -104 RIL/09-01/R0/09/WTP200/civil -105 RIL/09-01/R0/09/WTP200/civil -105 RIL/09-01/R0/09/WTP200/civil -106 RIL/09-01/R0/09/WTP200/civil -107 RIL/09-01/R0/09/WTP200/civil -108 RIL/09-01/R0/09/WTP200/civil -109
Clariflocculator
01 nos
Approved fm IIT
4 5 6 7
Inlet / Outlet Plan for Distribution Chamber/ Filter House Clear Water Reserviours
0 1 1
01 nos
Approved fm IIT
7 8 9
Chlorine Tonner Shed. Chemical House Settling Tank with pump house HT, LT Transformer room Boundry wall with piles Boundry wall without piles
0 0 0
10 11
Approved fm IIT Received from Jal Nigam Received from Jal Nigam
Sr. No. 1 2
STATUS FOR GA DRAWINGS AND STRUCTURAL DRAWINGS FOR 28.5 MLD WTP Description Sheet Revision Clariflocculator 01 nos 1 Inlet / Outlet Plan for RIL/09-01/R0/09/WTPApproved fm IIT Clariflocculator 01 nos 0 28.5/civil -101 Drawing No RIL/09-01/R0/09/WTP28.5/civil -102 RIL/09-01/R0/09/WTP28.5/civil -103 RIL/09-01/R0/09/WTP28.5/civil -104 RIL/09-01/R0/09/WTP28.5/civil -105
Remarks
3 4 5
04 nos 01 nos
1 0 0
STATUS OF OVERHEAD TANK DESIGN DRAWING AT KANPUR WATER SUPPLY PROJECT PHASE-II
SR.NO.ZONE NO. LOCATION OHST Design & Drawings of OHST Remarks
TW1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Chakeri OHST
EW2 EW3 EW5 EW11 EW17 EW13 EW16 EW1 TW2 EW4 TW3 EW7 EW8 EW10 EW15 SW1 SW3 SW9 CW2 CW1 GW3 GW4 GW1 GW2 GW5 SW4 SW6
Atwa Krishna Nagar Safipur Safipur Harijender Nagar Tiwari pur Jajmou North Shyam Nagr Sujat Ganj Shyam NagarKDA Colony Chandari Sanigwan Sanigwan Naubasta East Hanspuram Pasupathi Nagar Delhi Sujanpur Village Yashoda Nagar East Yashoda Nagar West Kidwai Nagar South Naubasta West Bingawan TW+ Barrage Saraimita Dabouli Ratan Lal Nagar Chedising ka Purrwa(Barra) Gujjaini Colony Barra West Barra East-I Barra East-II Karrhi 1
Total OHT Total Land Cleared Not cleared land Land Cleared But Public Hindrance no space for OHT Total Drawings Approved
500 250 575 775 1200 1000 200 1700 800 1600 1700 1100 800 1600 800 1600 900 1700 1700 800 600 1700 1600 1300 1300 1700 2100 1400 800 800 700
31 25 4 1 1 26
In progress Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi In progress
Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi on 15.03.2010 Approved From IIT Delhi on 15.03.2010 Approved From IIT Delhi( TO BE REVISED) Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi Approved From IIT Delhi Land Not Cleared Approved From IIT Delhi Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
EW2 EW3 EW5 EW11 EW17 EW13 EW16 EW06 EW09 EW12 EW14
Krishna Nagar Safipur Safipur Harijender Nagar Tiwari pur Jajmou North Shyam Nagr Sujat Ganj Shyam NagarKDA Colony Chandari Ompurwa Jajmou South Gandhi Gram Jajmau North East IPS Phool baug
1000 600 1000 1000 500 1000 1000 900 200 540 200 3700 700 1000 900 500 1000 1000 Approved From IIT Delhi Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi on 30.04.2011 Approved From IIT Delhi on 30.04.2010 Approved From IIT Delhi on 15.03.2010 Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi on15.03.2010 Approved From IIT Delhi on 15.03.2010
Sanigwan Naubasta East Pasupathi Nagar Delhi Sujanpur village Yashoda Nagar East Yashoda Nagar West
19 20 21 22 23 24 25 26 27
SW1 SW3
Kidwai Nagar South Naubasta West South IPS - JUHI GAUSHALA Cw pump House at Barrage IPS Juhi Gaushala
500 800 1700 4200 1700 500 1000 900 1000 Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi on 27.03.2010 Approved From IIT Delhi Approved From IIT Delhi on 15.03.2010 Approved From IIT Delhi Public Hindrance for
28 29 30 31 32 33
CW1 GW3 GW4 GW1 GW2 GW5 Ratan Lal Nagar Chedising ka Purrwa(Barra) Gujjaini Colony Barra West Barra East-I Barra East-II
34 35 36
KL KL KL
Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi
Usmanpur 37 38 39 40 GW6 SW7 SW10 SW8 Barra Gaon Ravidas Puram Jarauli Total CWR Total Land Cleared Not cleared land Land Cleared But Public Total Drawings Approved KL KL KL KL NO. NO. NO. NO. NO. 1000 665 200 200 40 31 5 4 31 Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi Approved From IIT Delhi
BARRAGE DIVISION
PART-1(OVERHEAD TANK)
SR.NO. ZONE NO.
1 2
LOCATION
CHAKERI-1(Sekhpur) Safipur
CAPACITY
500 KL 1000 kL
LAND STATUS
Land Not Cleared. Land Not Cleared. Location changed But in new location Still Land not cleared
Remarks
Not Cleared By KDA No New Land Identified
TW1 EW3
200 KL
Public Hindrance
EW3 EW5
600KL 1000KL
Tubewell
3
Tubewell 4
5
Rail Crossing
6
SafipurZPS Land Clearance still not recived From UP Jal Nigam as we Have completed already Four Road Crossing out of Five Crossing , so this Crossing is pending only due to land Clearance. We have got Land Clearance and Design and Drawing Approval From Railway Authority for Jaipuria Crossing But Still We not able to start due To deposit amount for lease still not paid by UP Jal Nigam
PART-3 ( PIPELINE)
PARTICULARS
PVC AND AC PIPE LINE 1 PSC PIPE LINE 2 PSC PIPE LINE 3
HINDRANCE
Bitumen and Cement Road is not allowed by Local Public & nagar Nigam in all areas. PSC Pipeline Laying Permission Still Not Received From UP Jal Nigam.(nagarnigam,PWD,NHAI,KDA) Barragaon,ravidaspuram,karahi,saraimita for all areas Indian oil Corporation permission still required
HINDRANCE
Continue Water Leakage from Exsiting Filter house ,so it is very hard to work
LOCATION
Kidwai Nagar South Pashupatinagar
CAPACITY
800 KL 1600KL
LAND STATUS
Land Not Cleared. Land Not Cleared.
Remarks
Public Hindrance Court Stay
HINDRANCE
KDA did not allow to lay PVC,AC Line (around 8 km)
PWD and NHAI did not allow to lay PSC,AC,PVC pipe for these areas
Local public and Parshad did not allow to lay PVC,AC Pipe. PSC Pipeline Laying Permission Still Not Received From UP Jal Nigam.(nagar nigam,PWD,NHAI,KDA)
Approach road to Take Driiling Machine for that location of Tubewell is not possible.
STATUS OF HINDRANCES OF AT KANPUR WATER SUPPLY PROJECT PHASE-II CONSTRUCTION DIVISION- III PART-1(OVERHEAD TANK) SR.NO. ZONE NO.
1
CAPACITY
LAND STATUS
Land Not Cleared.
SW1
800 KL
500KL Land Not Cleared. 900KL Land Not Cleared. PART-3 ( PIPELINE)
HINDRANCE
PARTICULARS
1
KDA did not allow to lay PVC,AC Line (around 8 km) Awas Vikas did not allow to lay PVC,AC Line (around 25 km) PWD stopped work of PSC Pipe Laying From Naubasta Churaha to Juhi Gaushala Local public and Parshad did not allow to lay PVC,AC Pipe.
2 3
PART-3 ( PIPELINE)
PARTICULARS
PVC AND AC PIPE LINE 1 PSC PIPE LINE 2 PSC PIPE LINE 3
HINDRANCE
Bitumen and Cement Road is not allowed by Local Public & nagar Nigam in all areas. PSC Pipeline Laying Permission Still Not Received From UP Jal Nigam.(nagarnigam,PWD,NHAI,KDA) Barragaon,ravidaspuram,karahi,saraimita for all areas Indian oil Corporation permission still required