Professional Documents
Culture Documents
An initiative of:
Automation & Power Solutions FZE
Undertaken by:
PS-1 Team from BITS Pilani Dubai Campus
Battery bank
AC distribution
Advantages
Two years output needed to just equal the amount of energy used
in production
Product Manufacturer
Inverter Benning
Batteries Saft
Ground Floor 3 3 1
1st Floor 4 3 -
Backyard 1 - -
* Due to lack of space for storage of battery bank in the unit, Refrigirators,
Airconditioners, Water heaters, Water Pumps are not to be included in the Scope of
the project.
Certified by: