Welcome to the Presentation on

Proposal for Shifting Transmission


Towers (Pylons)

Project: 2- Laninig of Potin to Pangin Section of


NH-13 from Package 1 to Package 9 in the State of
Arunachal Pradesh under Arunachal Pradesh
Package of Roads and Highways of SARDP-NE on
EPC Mode
PROJECT INTRODUCTION

• Project Name: 2- Laninig of Potin to Pangin Section of NH-13


in the State of Arunachal Pradesh under Arunachal Pradesh
Package of Roads and Highways of SARDP-NE on EPC Mode.
• Existing Length: 407 Kms
• Design Length: 351.383 Kms
• No. of Packages: 9 (Nine)
• The Existing alignment of the Project Road Passes through 4
(four) Districts of the State i.e. Lower Subansiri, Upper Siang,
West Siang and Siang.
KEY PLAN
Reasons for Shifting Pylons

1. Due to Encumbrance within the ROW.


2. Chances of Unitability of slope after earthwork
cutting during construction activity.
3. Impact on Pylon due to shifting the adjacent Pylon.
Abstract of 132 KV/HT Tower on Potin-Pangin
Within
Sr. no. Package no. Within ROW Outside ROW Total Nos
Formation

1 Package 1 Nil Nil Nil Nil

2 Package 2 Nil Nil 2 2

3 Package 3 1 3 3 7

4 Package 4 1 0 Nil 1

5 Package 5 Nil Nil Nil 0

6 Package 6 Nil 6 10 16

7 Package 7 Nil 1 1 2

8 Package 8 Nil Nil Nil 0

9 Package 9 Nil Nil Nil 0

Total(Nos) 28
Details of Pylons to be shifted and their respective Proposed
Locations:

• Detail List of Pylon to be shifted.xlsx


Some Examples of Pylon shifting
Location are Shown in next slides
THANK YOU