This document provides an overview of permit to work and isolation training. It discusses the key objectives of learning the general principles and roles of the permit to work system. It outlines revisions to some terminology used. It then explains the general principles of the permit to work system and isolation procedures, including discussing permits, objectives, general rules, attachments, authorized permit receivers, isolations, locks and tags, and other guidelines. It also provides an overview of the related SAP workflow process.
This document provides an overview of permit to work and isolation training. It discusses the key objectives of learning the general principles and roles of the permit to work system. It outlines revisions to some terminology used. It then explains the general principles of the permit to work system and isolation procedures, including discussing permits, objectives, general rules, attachments, authorized permit receivers, isolations, locks and tags, and other guidelines. It also provides an overview of the related SAP workflow process.
This document provides an overview of permit to work and isolation training. It discusses the key objectives of learning the general principles and roles of the permit to work system. It outlines revisions to some terminology used. It then explains the general principles of the permit to work system and isolation procedures, including discussing permits, objectives, general rules, attachments, authorized permit receivers, isolations, locks and tags, and other guidelines. It also provides an overview of the related SAP workflow process.
COURSE OBJECTIVE Presentation of the Amendments To learn the General Principles of PTW System & Isolation Procedure To know the Key Roles and Responsibilities To learn the General Rules & Guidelines of PTW System Presentation of the Process Flow Revision of Terms Work Order – Maintenance Order Locked box key – Lock Out Box Key Closing Work Order – Closing Maintenance Order Supervisor –Engineer Child Work Maintenance Orders – Child Maintenance Orders AEB – includes Technical Asset Manager Validity of Permits*** General Principles of PTW System & Isolation Procedure Permit to Work System is a formal written procedural system used to plan and control work which is considered potentially hazardous, to ensure the work is completed in accordance with safe working practices. It requires communication and co-ordination between management, Shift In-charge, Engineers, Operators and those who perform the work including the contractors’ staff. The Permit to Work System should specify a systematic disciplined approach to assessing the risks of a job and specifying the precautions to be taken. PTW Objective 1. To set rules and procedures for carrying out all types of work 2. Control & authorize any non- operational work 3. Ensure: Hazards – recognized; Risk – assessed; Safety precautions – applied 4. Prevent incidents General Rules Only Authorized precautions in Personnel PTWC Hold pre-job APR to discussions acknowledge PTWC Consult senior No PTWC – No personnel for high Work risk jobs If no compliance – API to demand work should not be RA/JSA/MS for started jobs with significant risks State clearly specific safety General Principles Attachments to Safe Work Permits - Gas Free Certificates - Diving Permit - Pre-Excavation - Climbing Permit Certificate - Transfer of APR - Confined Space Entry Permit - SEC Transmission Request - Confined Space Entry/Exit Records - SEC Isolation & Earthing Request - Pre-Radiography Checklist - Record of Inter-System Safety Precautions - Portable Earth Schedule - Fire Protection System Notification Form Authorized Permit Receiver Competent to receive PTWC – shall be issued authorized card after completion of 1) training and 2) written and oral test Duties: Understand and inform Stop work and consult personnel involved in API for change in work of circumstances or new hazards 1. Details of job PTWC is signed 2. Hazards and risk off/cancelled as soon as associated job has been completed 3. Safety precautions Return original copy of Apply precautions as PTWC to API along with specified in PTWC before lock out box key starting job Confirm isolations as per “Shall be limited to receiving, isolation certificate suspending, completing and including locks and tags closing of PTW (Work Maintain precautions and good housekeeping till Orders) within their own completion of jobs discipline. Housekeeping Good housekeeping will eliminate 50% of job hazards! A place for everything and ...everything in its place! PTW Coordinator Duties: Coordinating with Operations and Maintenance department to plan for Permits. Prepares the safety precautions and isolation list for the Permits Ensures that all supporting documents are attached. Follows up with Shift operations on the permits to ensure that they are released in time. As API, to apply isolations, identify hazards and precautions, issue, partially suspend and Normalize PTW (WCA/WCD). Isolations Objective energy Outline requirements for Scope energy isolation through • Applicable for all documentation, locking works that are and tagging intended to be Control risks while performed under undertaking all works permit to work from any: certificate through a 1. Potential accidental supporting document start-up of process/ Isolation Work Sheet equipment 2. Other interaction with hazardous Locks and Tags Locking Tagging To prevent danger Red tags – for from interference isolations points Isolation points like Blue tags – for valves, breakers, carrying test or being etc., should be adjusted live locked Yellow tags – for Use chains or hasps specific information for locking Keep isolation keys in Lock Out Box in PTW office Identifying isolation points
For equipment under Test
Specific information, instructions or being adjusted alive or Caution are to be given 5 keys 8 keys Ventilation Electrical Guidelines Isolation Switching Earthing Earthing Other Guidelines Loss of PTW Hard Copy Loss of Isolation Lock Keys Loss of Lock Out Box Keys SAP Flow Chart Maintenance Department to plan for Work Notification In SAP Notification Released Based on priority of job, MD will create MO Any person can raise a notification. Shift Engineer (API) to review and release and WCA. Maintenance to put Operation (Ensure that tag no. description, priority notification. list, precautions, desired isolation and and work center are properly entered. date. (Min.48hrs plan – except 1&2 jobs)
Concerned APR PTW Coordinator/Evening Shift SCE –
API Night Shift Engineers can cross checks Checks the WCA’s planned for next day, Verifies isolations and safety precautions the WCA’s and WCD’s planned for next discusses with APR/Safety Officer/Fire and receives the PTW. He then releases day, print tags, apply isolation, change Inspector (if required), Adds safety the MO and starts work. On completion of status to tagged in WCD, issue WCA, precaution in WCA, prepares isolation list work he changes status of the Approved change status to WCAP and if applicable. Prints P&ID of each WCD and Maintenance Order to WOCO and returns print our WCA and WCD sign and put in marks clearly the Isolation required. PTW hard copies to operation. PTW tray in PTW Office Information is passed to Night Shift SCE.
Operation (API ) to normalize the
Operation (API) Change the status of WCA Maintenance (APR) to perform technical isolation. Do untagged in WCD and test to close. Do TPASS/Fail for maintenance (TECO) of work order and close work run if required and put system in order. order or plan rework. operation. PTW Flow Chart Operations API: WCA made by JOMEL maintenance Prepare isolations list (WCD) and department to operations includes hazards and precautions. department Carries out risk assessment if Prepare all detailed job plans necessary. inclusive of all named isolations and safety precautions Implements the locking and tagging. Explain Issues PTW (WCA)
PTW (WCA) received by APR.
Executes the job with his people. Isolations verified by concerned APR Returns PTW (WCA) after job Isolations okay completion.