Quality Control system.

RUIZ FAJARDO
INGENIEROS
Objective : Construction in shop and field Boiler, Pressure Vessel and parts meet the ASOCIADOS S.A.S
standards required by the customer, engineering and ASME Section VIII Division 1. And INGENIERIA DE
repair and alterations accordance with NBIC of National Board. AVANZADA.

Start 1 1
No
Adjudication Si Drawings, calculations
OP consecutive
of the order and / or technical
Quotation / tender adjudicated.
or service? specifications.
Project Si Drawings,
calculations and
FO 3350
No
2 specifications are
2 FO 2208
correct?

Examination, inspection Planning project


and test plan Si
FO 3393 3
FO 3391 3
Purchase order
PO and quality Receipt and Material
inspection of according?
certificates. No
List of materials The material No purchased
Delivery of Drawings,
and quantities. is in stock? material.
specifications
approved and hold FO 3302a
FO 3352 Material accepted and Si Material
point to manufacturing. Exhibit 8.1 rejected.
released. Or
Exhibit 8.2 Si Reinspected
PR 3303
Delivery of material
Line and cut pieces manufacturing.
requested
7 7
Si
equipment Delivery of inspection
4 Liberation
4 complies? Name plate stamp reports, testing, quality
equipment quality
“U” and “U part” certificates and photo
6 6 control approval.
sign data report report.
Preformed and / or No
assembly. Inspection and
testing
equipment. Inspection and Si

5 5 testing to
PR 3313ª Make available to the
PR 3314 coating. equipment
PR 3321 client completed dossier
Production complies?
PR 3322 PP 3340 and manufacturing
welding. PR 3323 equipment.
PR 3324
PR 3310 PR 3325
PR 3312
Rejection of equipment or repair
coating. No
Rejection of parts or End
repair welds PR 3341
Reinspection. FO: control formats
PR 3311 PR: Internal procedures 1
RUIZ FAJARDO
INGENIEROS ASOCIADOS
S.A.S

Control Calidad. Quality control system INGENIERIA DE


AVANZADA.

Listado de procedimientos / List of formats.


FO 3350 Requerimientos de usuario / User desing requirements
FO 3351 Especificaciones del cliente / Customer´s specification
FO 3352 Lista de materiales / Bill materials
FO 2208 Control de documentos / Documentas control
FO 2209 Control envio de documentos / Control document delivery
FO 2205 Aclaracion tecnica / Technical clarification
Exhibit 8.1 Oren de compra / Purchase order
Exhibit 8.2 Especificacion de compra / Purchasing specification
FO 3302a Recepcion y solicitud de materiales / Materials receiving and inspection request
FO 3302b Reporte de recepcion de lamina / Plate receiving report
FO 3302c Reporte de recepcion de cabezales / Receiving inspection report (Head)
FO 3302d Reporte de recepcion de tuberia / Pipe tube receiving report
FO 3302e Reporte de recepcion de accesorios / Miscellaneuos receiving report
FO 3381 Consolidado de materiales / Consolidated of materials
FO 3391 Plan de exmenes, inspecciones y pruebas / Examination, inspection and test plan
FO 3325 Reporte prueba de presion hidrostatica / Hydrostatic test pressure report
Exhibit 9.3 Placa de identificacion / Name plate
FO 3302f Cetificado de conformado de cabezas / Forming heads certificate
FO 3302i Certificado de conformado de cilindros / Forming rings certificate
FO 3301a Manejo de producto no conforme / Nonconforming product management
FO 3312b Registro de soldadores / Welder log
FO 3312a Registro de recibo yentrega de soldadura / Welding receipt and delivery record
FO 3310i Reporte de soldadores calificados / Qualified welder operator record
FO 3312c Reporte de inspeccion de juntas soldadas / Report of inspection of welded joint
FO 3395 Registro del numero del National Board / National Board log
FO 3397 Reparaciones y alteraciones / Repair and alterations

AD 3301 2
RUIZ FAJARDO
INGENIEROS ASOCIADOS
S.A.S

Control Calidad. Quality control system INGENIERIA DE


AVANZADA.

Listado de formatos / List of procedures.


PR 3301 CONTROL DE PRODUCTO NO CONFORME / Control of nonconformities.
PR 3302 RECEPCION E INSPECCION DE MATERIALES / Receiving and inspection of materials.
PR 3304 IDENTIFICACION Y TRAZABILIDAD DE MATERIALES / Material Identification and Traceability.
PR 3310 CALIFICACION DE WPS, WPQ Y WOPQ / Qualification wps, wpq and wopq.
PR 3311 REPARACION DE DEFECTOS DE MATERIAL BASE/ Repair of defects in material base.
PR 3312 APLICACIÓN DE SOLDADURA / Welding application.
PR 3313aTRATAMIENTO TERMICO POSTERIOR A LA SOLDADURA / Procedure PWHT.
PR 3314 TRATAMIENTO TERMICO POSTERIOR A LA SOLDADURA PARA REPARACIONES / Procedure PWHT for repairs and
alterations.
PR 3321 INSPECCION VISUAL / Visual inspection.
PR 3322 LIQUIDOS PENETRANTES / PT inspection.
PR 3323 RADIOGRAFIA / RT inspection.
PR 3324bPRUEBA NEUMATICA A REFUERZOS / PNEUMATIC TEST A PAD.
PR 3325bPRUEBA HIDROSTATICA A EQUIPOS / Hydrostatic testing.
PR 3340 PREPARACION A SUPERFICIES Y APLICACIÓN DE RECUBRIMIENTOS / Surface preparation and application of
coatings.
PR 3341 REPARACION DE DAÑOS EN EL RECUBRIMIENTO / Repair coating.

AD 3301 3
Administración de Control Calidad. RUIZ FAJARDO
INGENIEROS
Objetivo: ES describir el procedimiento para asegurar que todos los materiales utilizados en la ASOCIADOS S.A.S
construcción de equipos cumplan los requisitos del código ASME sección VIII división 1. INGENIERIA DE
AVANZADA.

Start
Planning project Examination, inspection
and test plan

List of materials
and quantities. Purchase order Receipt and inspection
PO and quality of purchased material.
certificates.
PR 3302

Material
The material according? No
is in stock?
No
Material accepted and Si
released. Or Reinspected
Si
Material
PR 3303 rejected.

No
Material stored reconditioning welding
properly welding
completely Inspection
consumed and testing
vessel

Si PR 3321
PR 3322
PR 3323
Delivery welding PR 3324
manufacturing PR 3325

PR 3310 Construction of vessel


PR 3312
FO 3312a

Delivery of Materials
with traceability code. Fin

4
Control Calidad. RUIZ FAJARDO
INGENIEROS ASOCIADOS
S.A.S
Documentación de los riesgos y puntos de control. INGENIERIA DE
AVANZADA.

Riesgo Descripción Riesgo Control Descripción Puntos de Control

1
El plazo establecido con el cliente no se cumpla. 1 Revisar la fecha de entrega, contenida en la notificación de
adjudicación.

Coordinar las actividades y recursos necesarios para cumplir


2 Según el PLAN DE PROYECTO, no se evalué los recursos 2 con el programa.
necesarios para la ejecución del proyecto. Realizar monitoreo de las actividades establecidas y los
tiempos determinados.

El material adquirido no cumpla con las características Realizar inspección al 100% del material y consumibles
3 exigidas, por los estándares de fabricación. adquiridos, para el proceso de fabricación.
3
Los certificados de calidad no correspondan con los Realizar inspección por ultrasonido en laminas y tubos, para
elementos, componentes o consumibles, enviados por el medir los espesores.
proveedor.

Las piezas fabricadas estén, por fuera de los parámetros Se registra la liberación de piezas, inspección dimensional y
4 establecidos por el cliente o por el código de construcción traslado de código de trazabilidad, sobre los planos de
4
aplicable. fabricación y de control calidad.

Los procedimientos de soldadura utilizados en la Entregar listado de procedimientos calificados, alcance y


5 fabricación no estén debidamente calificados. limitaciones.
5
Los soldadores no estén calificados. Entregar listado de soldadores calificados en los procesos
correspondientes, alcance y limitaciones.

Inspección mediante ensayos no destructivos y pruebas de


6 El producto no cumpla con los requerimientos. presión, en el desarrollo de cada etapa del proceso, teniendo
6 en cuenta los criterios de aceptación del código ASME sec
VIII div 1.

Los requerimientos de la fabricación no sean completados Verificar que todas los requerimientos hechos por el cliente,
7 a lo largo del proyecto. ingeniería y el código ASME seccion VIII division 1, sean
7
satisfechos.

AD 3301
Resumen del Proceso de Control Calidad. RUIZ FAJARDO
INGENIEROS ASOCIADOS
S.A.S
INGENIERIA DE
AVANZADA.

Actividad inicial del proceso. Definición del proceso. Actividad final del proceso.

Entregar a todos nuestros clientes


Determinar los recursos, equipos y Inspeccionar y probar, equipos, recipientes,
equipos, recipientes, tanques, sistemas
coordinar tiempos, para garantizar que sistemas de tubería, tanques de
de tubería o estructuras, cumpliendo los
el producto se fabrique a conformidad almacenamiento o procesamiento industrial y
requerimientos de los códigos de
del cliente. estructuras, fabricados por RF.
construcción aplicables y especificaciones.

Entradas. Actividades básicas. Salidas.

• Un equipo, recipiente, tanque, o sistema


• Notificación de adjudicación. • Tener toda la información necesaria para la
de tubería, con las características técnicas
• Especificaciones técnicas del proyecto. ejecución del proyecto.
adecuadas para entrar en funcionamiento
• Planos de fabricación. • Verificar que todos los materiales, suministros
satisfactoriamente.
• Plan de proyecto. y consumibles sean liberados a conformidad.
• Contar con un soporte documental de
• Ordenes de compra. • Realizar seguimiento e inspección de cada
cada proyecto ejecutado (reportes de
• Certificados de calidad de materiales. una de las etapas de la construcción.
inspección y pruebas) e información relevante
• Validar el proceso de fabricación.
del proceso de construcción.

Indicadores mediciones
Funciones impactadas. Sistemas usados / interfaces.
desarrolladas.

• Inspectores de calidad, equipos de


• Reclamos del cliente.
• Control de calidad aseguramiento de calidad,
• Numero de inspecciones por RT
• Operaciones en patio, rendimiento del cumplimiento de procedimientos.
satisfactorias.
personal. • Control de tiempos en la ejecución de
• Días perdidos por accidentes.
• Seguridad en las operaciones. cada tarea, plan de inspección y
• Fatalidades en operación.
pruebas.