You are on page 1of 1

Drafting an AQR

1) While the samples are under testing the draft AQR is Prepared
2) The first step in drafting an AQR is getting the right AQR number
which is very important for the traceability of the document
3) Supplier name, Address & RM Spec number is confirmed from the
global analytical tracker updated by the supplier with updated in
the RMQ & Concerto
4) All the required documents are checked and downloaded from
RMQ, If not available then it is requested from the requestor

You might also like