The document proposes an 80.9 meter bridge between Panitan and Sublangon in Capiz, Philippines to divert traffic. The objectives are to structurally design the bridge through load and design analysis, estimate the cost of the project, and prepare a PERT-CPM schedule.
The document proposes an 80.9 meter bridge between Panitan and Sublangon in Capiz, Philippines to divert traffic. The objectives are to structurally design the bridge through load and design analysis, estimate the cost of the project, and prepare a PERT-CPM schedule.
The document proposes an 80.9 meter bridge between Panitan and Sublangon in Capiz, Philippines to divert traffic. The objectives are to structurally design the bridge through load and design analysis, estimate the cost of the project, and prepare a PERT-CPM schedule.
PANITAN- SUBLANGON BRIDGE TO DIVERT FLOW OF TRAFFIC IN PANITAN, CAPIZ APPROXIMATE BRIDGE LENGTH: 80.9 METERS
BRIDGE OBJECTIVES:
Generally, this study aims to design the Proposed Panitan-
Sublangon Bridge to divert flow of traffic in Panitan, Capiz
Specifically, this study aimed to:
Design the structure in terms of: a) Structural Load Analysis b) Structural Design Analysis Determine the estimated cost of the project and Prepare the PERT-CPM of the project.