TIME LINE
Capacity charges
Energy charges
3
SCHEDULING
1000
Forecast ex-bus capability of Power Plant
900
Net Injection Schedule
800
700
MW
600
500
SEB - A's Entitlement - (40% )
400
SEB - A's Requisition
300
200
100
0
0 2 4 6 8 10 12 14 16 18 20 22 24
Hours 4
CAPACITY CHARGE
5
ENERGY CHARGE
Energy charges shall be worked out on the
basis of a paise per kwh rate on ex-bus
energy scheduled to be sent out from the
generating station as per the following
formula
7
UNSCHEDULED INTERCHANGE (U I) :
8
UI RATE
650
600 Rate of Unscheduled Drawal/Injection
Below 49.0 Hz UI rate =570 p/u Frequency (Hz) Rate (p/u)
550
Above 50.5 0
500
50.0 150
450
UI rate ----------------->
49.8 210
400
49.0 and below 570
350
300 At 49.8 Hz UI rate =210 p/u
250
200
150
At 50.0 Hz UI rate =150
100 p/u
Above 50.5 Hz UI rate =0
50
p/u
0
48.9 49 49.1 49.2 49.3 49.4 49.5 49.6 49.7 49.8 49.9 50 50.1 50.2 50.3 50.4 50.5 50.6 50.7 50.8 50.9 51
Frequency ----------->
9
AVAILABILITY BASED TARIFF
(A) CAPACITY CHARGE
(B) ENERGY CHARGE
(C) ADJUSTMENT FOR DEVIATIONS
(U I CHARGE)
(A) = a function of the Ex-Bus MW availability of Power
Plant for the day declared before the day starts x
SEB’s % allocation from the plant
(B) = MWh for the day as per Ex-Bus drawal schedule for
the SEB finalised before the day starts x Energy
charge rate
(C) = Σ (Actual energy interchange in a 15 minute time
block – scheduled energy interchange for the time
block) x UI rate for the time block
TOTAL PAYMENT FOR THE DAY = (A) + (B) ± (C) 10
FEATURES :
(A) and (B) do not depend on actual plant
generation / drawal. No metering required for this
as they are based on off-line figures. All deviations
taken care of by (C)
11