You are on page 1of 59

Bangladesh-India Friendship Power Company (Pvt.

) Limited
( A Joint Venture of BPDP and NTPC Ltd)

WELCOMES
For Presentation On Safety Activities
“2x660 MW MAITREE STPP”

Presented by-
Md. Mizanur Rahman, DM (Fire & Safety)
Md. Shofiul Alam, AM (Fire & Safety)

01.12.2020
Manpower Statistics at Site
SL No Safety Executives Staff Workers Total

BIFPCL OWN 02 59 15 - 76

FICHTNER 01 23 1 - 25

BHEL 03 21 39 - 63

M/S Chola 09 - - - 09

Hired Safety from 10 - - - 10


Agencies

BHEL Agencies 80 286 300 4490 5156

Total 5339
FIRE LICENSE OF MSTPP SITE
APPROVED FIRE SAFETY
PLAN FROM BFSCD
SAFETY DOCUMENTS AT MSTPP
SITE
 Environmental and Social Management System (ESMS) for
main plant EPC vendor
I. BIFPCL Policy on Health Safety & Environment
II. Stakeholder Engagement Mechanism
III. Grievance Redressal Mechanism
IV. Health and Safety Manual
V. EPC Contractor SHE Plan
VI. Fire Prevention, protection and Control Plan
VII. Emergency Preparedness and Response Plan
VIII. Prevention of Malaria, Yellow fever and HIV Plan
***Operational Control Procedures (OCP)

 Standard HSE Plan (Township)


Safety App of BIFPCL
IMPLEMENTED SAFETY
ACTIVITIES AT MSTPP SITE
 All new workers must go under medical test and induction
training then he may receive the Gate pass to enter into the
plant premises.
 Skill/ High skill Manpower has to attend Competency test by
BHEL (M/S Cholamandalam MS Risk Services "), then
he/she will be allowed to work at Plant site.
 Three Personal  Protective Equipment (PPE) (Safety Shoe,
Helmet and Reflective Vest) is mandatory for all. Moreover
work related PPE also must for  specific work. Vedio
\PPE.mp4
 Anyone who want to work at Height (more than 2 (Two)
meters), he must be certified by registered MBBS Doctor and
after completed vertigo test.
PERMIT TO WORK
All agencies are advised to follow the followning
work permit system before starting work.

 Height Work (Above 2 M)


 Hot Work
 Radiography
 Havey Lifting (Above 50 MT) etc.
 Deep Excavation
 Confined Spaces
BHEL safety personnel will approve the work permit
system only.
IMPLEMENTED SAFETY
ACTIVITIES AT MSTPP SITE
 Safety Clearance is mandatory to start of any work activities at
site  after proper checking of safety issues and signed by Agencies
Engineers and Safety officers, BHEL engineers and Safety
Engineers and verified by OE engineers.
 PEP Talk/ Tool Box is being provided to all workers before
starting of daily work activities by Execution/ Safety Engineers at
site.
 More than 80 dedicated Safety personnel are engaged by BHEL
and their sub-agencies to ensure safety at MSTPP site. In
addition ,BIFPCL has kept a Safety Expert from Fichtner.
 For township ,CFMCC having one safety officers and four safety
supervisors at site now.
 Government approved Third party certification is mandatory for
all  lifting equipment at site. 
IMPLEMENTED SAFETY ACTIVITIES AT
MSTPP SITE

 For electrical safety, MSTPP  is using RCD/ RCCB/ ELCB


with 30mA rating and it is checking twice in a month. Also
ensuring earthing (≤1Ω) for all electrical devises like
welding machine, bar bending machine, bar cutting , DG
etc.
 EPC Vendor has hired Third party Safety expert from
"Cholamabndalam  MS Risk Analysis Experts ". They are
giving Safety compliance support and work related 
training to engineers, officers, technician  and workers.
 BHEL shall be taking up Safety Audit by reputed third party
"DuPont India" at MSTPP site.
IMPLEMENTED SAFETY ACTIVITIES
AT MSTPP SITE
 Speed limit has restricted maximum 20 KM/Hrs at Project area.
 Work related safety sign has been installed at different locations in
both Bangla and English as well as optional Hindi language.
 Sprinkles/ Spray water on the road and working area during dust
emission.
 Rigging, lifting and scaffolding as well as other jobs related
training is providing to the employees.
 Fire Fighting, rescue and First aid training and Mock drill is
arranging at MSTPP site by Bangladesh Fire Service and Civil
Defense. Moreover agencies of BHEL are used to arrange Fire
Drill, Height Rescue Drill, Electrical rescue and Excavation drill
at site. Vedio\WhatsApp Video 2020-11-30 at 1.42.48 PM.mp4
SAFETY ACTIVITIES ARE
IMPLEMENTING  AT MSTPP SITE
 Lightning arrester has installed several locations of plant site.
 Several inspection like RCD/RCCB/ELCB, Cranes, Excavators,
Hydra, Electrical T&P, Illumination checking are conducting at Site.
 Fire extinguishers has installed in fire prone area like diesel storage,
near DG, electrical DB Box etc.
 Using Flash Back Arrester is mandatory both sides of Gas cutting
equipment.
 BIFPCL and BHEL has establish individual medical centre with
medical facilities at MSTPP site. BHEL has kept a MBBS Doctor,
two competent paramedics with two emergency Ambulance(24/7).
 Only Competent Drivers are allowed to Drive at MSTPP site.
 Monthly HSE report and audit conducting at plant premises
submitted to BIFPCL by BHEL.
Safety Helmet Color Code

1. Green-for Safety People


2. White-for Executions and Visitors
3. Yellow-for Workers
4. Red-for Electricians
5. Blue-for Supervisors
Fire Safety Control Room
Description Quantity Description Quantity
Portable gas indicator 3 Hose repair equipment 1
Heavy duty hand lamp 4 Fire fighting suits 5
Breathing apparatus 7 Fire fighting blankets 10
with cabinet
Dry powders 1 Multipurpose nozzles 4
transferring and
refilling rig
Pneumatic vice for 1
extinguishers locking
CO2 extinguishers 1
filling and powder
pressurization rig
Electric screwing- 1
unscrewing
Hydraulic inspection 1
unit
First aid kit 3
Paramedic standard 2
equipment
Fire Prevention Schemes for Maitree Project


Fire Detection Systems

 Fire Alarm & Protection System

 Fire Fighting Systems


Fire Detection,
Alarm & Protection System

 Manual Fire Alarm Presentation Picture\Manual Fire Alarm.jpg


 Linear beam smoke Detectors
Presentation Picture\Linear Beam Detector.jpg
 Smoke detectors Presentation Picture\Smoke Detector.jpg
 Automatic fire detection and alarm system
Presentation Picture\Automatic Fire and Alarm Detection System.jpg
 Linear heat detectors and UV/IR flame detectors
Presentation Picture\UV.jpg
 Multi-sensor detector Presentation Picture\multi-sensor-detectors.jpg
 Gas Detection Presentation Picture\Gas Detector.jpeg
 Sprinkler head heat detectors
Presentation Picture\Sprinkler head heat detectors.jpg
 Duct Smoke Detectors Presentation Picture\Duct Smoke Detectors.jpg
Fire Fighting Systems

 Indoor (with hose reel ), outdoor and Monitor hydrants


system Photo\Fire-hydrant.jpg
 Automatic MVW and HVW spray system
Photo\MVW and HVW spray system.jpg
 Automatic foam/water spray fixed systemPhoto
\Automatic Foam.jpg
 Portable and Fixed Fire Extinguishers
 Inert Gas Extinguisher System Photo\Inert gas.jpg
Fire Water Demand Calculation and its uses

As per the calculations,Fire water storage requirement considering the


largest water demand = 1700 m3. Fire water system shall be provided with
two water sources Primary water source for fire water system shall be taken
from the desalinated storage tank. This desalination storage tank is
designed for 24 hr. water continuous consumption requirement of station
plus 1700 m3 of fire water dead storage (100% Fire water demand).
Emergency fire water shall be from a dedicated fire water storage tank with
effective capacity of 2300 m3 (i.e 100% Fire water demand). Water used in
this tank is desalinated water, taken from a tap-off from inflow line of
desalinated water storage tank (Primary Source)

Fire Pump:
Fire Water Pump( Electric Motor Driven)- 1 no-795 m3/Hr.
Fire Water Pump( Diesel Engine Driven)-1 no -795 m3/Hr
Jockey Pump-2 nos- 75 m3/Hr
SAFETY CLEARANCE/PTW
TRAINING & DRILL BY BFSCD
FIRE & RESCUE DRILL BY BFSCD
RESCUE TRAINING BY FIRE DEPARTMENT
PRACTICAL FIRE EXTINGUISHER
TRAINING AT SITE
Rescue Drill
SAFETY PARK AT MSTPP
SAFETY EQUIPMENT DISPLAYED AT
SAFETY PARK
MEDICAL CHECK UP BY MBBS DOCTOR
ICU SUPPORTED AMBULANCE WITH
DOCTOR AND PARAMEDICAL STAFF
TRAINING AT SAFETY PARK
VERTIGO TEST FACILITIES AT MSTPP SITE
TRAINING FOR SCAFFOLDING
RIGGING AND LIFTING TRAINING
Welding Skill Development & Testing Center
PEP/TOOL BOX TALK AT MSTPP SITE
DAILY PEP TALK AT MSTPP SITE
HOUSEKEEPING AT SITE
ROAD SAFETY SIGNAGE
WORK RELATED SAFETY SIGNAGE
BEST SAFETY CONSCIOUS WORKERS
SAFETY MOTIVATIONAL PROGRAMS
HSE PROMOTIONAL ACTIVITIES.
HSE PROMOTIONAL ACTIVITIES.
ILLUMINATION CHECKING
AUDIT, INSPECTION AND TRAINING
MEASUREMENT OF EARTH RESISTANCE
GOOD HSE PRACTICES.

Fire point & Display of TPI Work Permit & Water


Hard barricades OCP display Sprinkling
board.
T & P CHECKING
TPI (Third Party Inspection)
ILLUMINATION MONITORING
SPEED LIMIT SIGNAGE
INSTALLALLED SAFETY NET & SAFETY
NET DROP TEST.
LABOUR COLONY WITH RECREATION
FACILITIES

VOLLEYBALL
COURT
LIGHTNING ARRESTOR
GOAL POST
Life line and vertical Fall Grab Arrestor
Flashback Arrestor
WATER SPRINGKING ON ROAD
Awareness workers in the plant
Thank You