5W1H Format

What Where When Who Why How

casting)
of casting) Why wrong PPC will
gating
system?
prepare
the

Batch.No-09
Why gating comprehe

nd Shift, Batch.No-09
system was
surface of
Shrinkage

nsive
Ingate Shrinkage

modified?
(At surface

production
PPC Why gating planning
departm system was considerin
not validated? g with all
M/C-1 (At

ent.
Ingate

aspects
HSM M/C-1

Why-4 like r/m,


22nd

tooling ,
m/c
HSM

conditions,
Why-5
etc.

Root Cause: Improper Production planning and Schedule.