Professional Documents
Culture Documents
◦Presented by :
◦Meymouna DAH
◦Mohamed Amine FERCHICHI
◦3AGC1
◦Supervised by :
◦Ms.Saloua EL EUCH
PLAN
Introduction
This project consists of
developing an interchange
between Zarzouna and Menzel
Abderrahmen.
Its main objective is to
improve the movement of
people and goods within the
Bizerte urban center and in the
country’s North and East
Regions.
Traffic analysis
◦ Traffic growth rate : i = 4%
◦ Life span = 20 years
◦ Year of commissioning : 2025
By Meymouna
Geotechnical study
Dynamic and static
study with SAP2000
Geometric characteristics
Join restraints
Meshing shells
Proper modes
1 2 3 4 5 6
Mode
0,34 0,25
Period (sec) 0,19 0,17 0,16 0,14
Line of influence for the moment at the first mid span section
Values of maximum bending moments for different sections
Section First mid span Second support Second mid span Central support
Maximum bending 1,5 -3,2 1,5 -3,3
moment (MN.m)
Conclusion
This project was a big opportunity to deal with a real-life structure through different phases :
◦ First, we treated the traffic data to identify the number of lanes, The class of traffic and the
dimensioning using Allizé software
◦ Then, we established a geometric conception on Autocad
◦ Finally, we studied the behavior of the structure and its stability using SAP2000