Professional Documents
Culture Documents
Nagpur -441103
1.Feeder pipe
3
2.Break Pipe
3.Marker Light
4.Head Light
1 7 5.Flasher Light
2
LET’S SEE VARIOUS SECTION
PRESENT IN THE LOCO SHED
1.E-3 Sections
2.E-4 Sections
3.E-5 Sections
E-3 SECTION
• This section is responsible
for the inspection and the
overhauling of the traction
motors that drives the
locomotives.
• A 6 pole DC series wound
motor with commutating
poles.
• Locomotive have 6 axis.
Each axis carries single
traction Motor.
• Mounted on Bogie frame .
E-4 SECTION
This section is in
charge of relays,
speedometers,
microprocessors,
battery chargers
etc……
SPEEDOMETER
• Speedometer is a mandatory
safety equipment.
• The equipment indicates the loco
speed, records speed .
• Gives statistics of the speed of the
locomotive.
• Inside SPM, data is recorded in a
compact FLASH MEMORY
CARD.
• This compact memory card can
store long term data of the last 60
days of halt and run.
RELAY
Relays Provided in Locomotive :-
1.Safety Relay – Used for the safety
of the entire system.
HOW DOES AN
ELECTRIC LOCO WORK ?
Overhead Through the roof bars
Transmission Line Transformer
(25kv) via pantograph
AC supply is fed
to the transformer
which in turn
steps down the
voltage and feds it
to
Smoothing Rectifier changes
Rectifier
Reactor AC to DC and is fed to SR
pulsating DC to smooth DC
Traction
(DC-DC) and feds it to Motor
PANTOGRAPH RECTIFIER
TRANSFORMER