ECAS* timeline

ECAS system 100% Shovels


100%
turned on installed equipment / vehicles
installed
ECAS kits
installed on Installation starts
ESTRS trucks on Haul Trucks and
(6 trucks) Light Vehicles* 100%
50% of people Ancillary 70% haul
Shovels install Ancillary 100% haul trucks 100% LV fleet
trained on ECAS fleet install trucks fleet
Pace: Haul Truck/day starts fleet fleet installed installed
starts installed
completed

YYYY YYYY YYYY YYYY YYYY YYYY YYYY YYYY

YYYY YYYY YYYY YYYY YYYY


Today
Assumptions:
• Ramp-up on ECAS system: 3 months (Dec
20 – Jan 21 – Feb 21).
4 ESTRS Trucks Protab • On March 2021 ECAS becomes a Critical
ECAS kits Cerro Alto available to be additional ESTRS test starts Control.
Protab (6 haul trucks • Impact on haul Truck Availability, starting
on site mobilization
contract operated (if crew
starts required)** running) on 01 March 2021, is ~0.3%*** due to
mobilized to
to site ECAS maintenance (once ECAS is enabled
site
as a Critical Control).
• Additional -0.2% impact on HT Availability
Starting on May 20th: 1 ESTRS Liebherr T284 haul truck can be operated if required due to other technology devices (Trunking,
Starting Sept 01st: 4 ESTRS haul trucks can be operated if required Smartcap, Modular).
(only if ECAS is impacting Utilization due to increase in # of truck drivers)**

Notes (*): ECAS and PDA install. (**) ESTRS trucks can be used only if required from Operations, due to less Utilization triggered by ECAS install.
(***) Based on the experience and benchmark with Spence and Cerro Colorado.