EATP timeline Site infrastructure

(Boom gates, signage, etc.)


Demonstration phase

Komatsu
mobilized to site Day Shift Day & Night Shift

Training &
1 Truck on
st 2 Truck on
nd
3 &4
rd th Ramp-up
site site Trucks on site Total Movement: • Material Movement 1.1
EMVs ready Sept: 249 kton – 1.2 Mton/month
Not available for Not available for • 4 autonomous trucks
4G LTE Not available for
operations AHS Oct: 700 kton
operations operations (without • Availability (physical):
(N10) (without foldable foldable extended (without foldable Commissioning 74 - 77%
working extended bumper*) bumper*) extended bumper*)
& testing starts • AHS Utilization: 80-86%
GPS station
ready 14 months

YYYY YYYY YYYY YYYY YYYY YYYY YYYY YYYY


YYYY YYYY YYYY YYYY
Today
Instructor Lead
(Theory) Training Field Training
2 remaining
Main focus: Core Team
trucks from Core Team + Operators +
(Supervisor, Pit Patroller & Central Fitters
site to ANF Controller)

18 People (Supervisor, Pit 18 Core + EEAA & Shovel


Patroller & Central Controller) Operators

Notes (*): Foldable bumper will be installed after AHS Commissioning (to avoid faults or interferences in the AHS system, before being tested).
(**): Operating trucks manually could create a high risk to the project in terms of AHS hardware care. (***) Shovel, Dozer and Grader Operators (one of them can be an
Instructor, which can be Certified to instruct other operators).