Professional Documents
Culture Documents
xlsx 04/28/2021
Notes and Instructions
Instructions:
Company Name
Reporting Year for this data This data survey is aimed at the period 01 Jan 2018 to 31 Dec 2018. Please note if your data period is different to this, (i.e. 01 Apr 2017 to 31 Mar 2018)
Notes:
Please enter the number of hours flown per category, split between
Passenger carrying operations;
Other operations; and
RPAS operations.
Other operations can include helicopter external/sling loads, medevac, aerial work such as
spraying, survey, patrol, inspection etc.
If your organisation data does not split out the information into the different categories of
SE or ME turbine or piston, please place all the data in the 'Unknown' column
Round the Hours to the nearest whole number (no decimal places or minutes).
Do not add data associated with the purchase of tickets on a regularly scheduled public
service (airline), this report is for contracted aviation only.
Reports should be updated annually prior to 01 April each year so the data can be collated
and discussed at the May TAC Meeting.
3 of 4
521145755.xlsx
BMO Avn Use - 2018 Data Printed : 04/28/2021
Confidential once Completed
Number of
Single Eng Multi Eng Multi Eng Single Eng Aircraft Total Hours
Type of Operation\Fleet Types
Turbine Turbine Piston Piston
Unknown RPAS/UAV Operators (Not inc RPAS)
Notes
utilised
Onshore Operations (FW & RW) Hours Hours Hours Hours Hours Hours Ttl Hours FW=Fixed Wing (airplanes), RW = helicopter operations
Passenger Carriage 0
file:///conversion/tmp/scratch/521145755.xlsx Page 4 of 4