Production Manager:
Wayne Flowers
Page
Start Duration Topic Facilitator Reference
DAY FIVE – Friday, January 11th, 2008
8:00 am 15 min Rapid Diagnostic Recap Mark McTaggart
8:15 am 90 min Rapid Diagnostic Report Out Participants
9:45 am 15 min BREAK
John Thatcher
10:00 am 60 min Review Participant Learning Objectives
Sandor Wolkensperg
John Thatcher
11:00 am 60 min Review and wrap-up
Sandor Wolkensperg
Why might people mistakenly think that safety is incompatible with a performance-based
culture? How can we as leaders change their minds?
What evidence could we look for to see if safety is a priority in the plant?
The purpose of the QualityONE system in the OPX environment is to ensure the
prevention and correction of processes or behaviors that contribute to inefficiencies,
waste, and customer rejects. But under OPX, when we are helping operators produce more
throughput than ever before, quality could slip and OPX will fail if we don’t do our jobs to ensure
That QualityONE does not get ignored at the expense of making more boxes. Remember: it
doesn’t matter how many boxes you make if they are of such poor quality that nobody wants to
buy them.
Why might people mistakenly think that OPX is incompatible with QualityONE? How can we
ensure improvements in both quality and throughput?
What programs/tools does Smurfit-Stone have in place to help with Quality, and how can we
ensure they are being utilized during our time in the plants?
There is a common belief that if we turn up our machines to achieve higher throughput,
our Total Waste percentage will go up as well. This could be true in instances where there
isn’t an active waste management system in place. But under OPX this scenario is
unacceptable.
List a few instances of how stressing increased throughput could lead to higher total plant
waste:
–
–
–
How can we as leaders help plants both increase throughput AND improve their overall Total
Waste percentage?
What programs/tools does Smurfit-Stone have in place to help with the elimination of waste?
–
–
–
1. _____________________________________________________________________
2. _____________________________________________________________________
3. _____________________________________________________________________
1. _____________________________________________________________________
2. _____________________________________________________________________
3. _____________________________________________________________________
1. _____________________________________________________________________
2. _____________________________________________________________________
3. _____________________________________________________________________
Smurfit-Stone Container * Operational Excellence Boot Camp 15
Free floor walk recap – What did you see?
Era 2
Era 1
“Enhanced Manufacturing
Excellence”
Era 0
“Core Manufacturing
Excellence”
Tools
OPX • Visual management boards
Management • Machine operating logs
System • Standard metrics and
Tools targets
• OPX Playbook OPX Operating
• SSCC SOPs System
• Local SOPs
Smurfit-Stone Tools
Performance • Roles descriptions
Culture • Talent review process
• Leadership
development/training
1 2 3 4 5
Description • Establish prerequisites • Create baseline • Design endstate • Execute through • Check-in and follow-
• Fill data requests • Prioritize efforts • Create workplan plant team on coaching
• Introductory training • Establish unit • Define report out • Plan for area • Upward feedback on
specific targets requirements implementation OPX
Key activities 1.1• Collect data 2.1• Develop overall 3.1• Develop master 4.1• Rollout and re- 5.1• Follow-up
plant baseline implementation fine the phased performance
1.2• Plan out important (MIFA & OEE) plan OPX elements dialogues (area
meetings and and plant)
reviews 2.2• Plant opportunity 3.2• Tailor OPX ele- 4.2• Rollout the
assessment of ments to suit performance 5.2• OPX team circle
1.3• Prepare local man- OPX elements local plant con- management back for audit
agement for OPX ditions system and potential
2.3• Prioritization of Kaizen events
1.4• Establish the team, OPX element 3.3• Develop detailed 4.3• Coach plant
organise logistics implementation workstreams management 5.3• Update OPX
and provide OPX action plans transformation
team training 2.4• Set plant perfor- 4.4• Steering approach and
mance targets 3.4• Define steering Committee playbook based
Committee report out on lessons learnt
review
Key individuals • RVP and AOMs • OPX team • OPX team • Plant team • Plant management
• Plant management • Plant team • OPX team • RMMs
• OPX leads • OPX PMO
Smurfit-Stone
*Design requirements dependent on complexity Container * Operational Excellence Boot Camp
of plant implementation 22
The Canadian Perspective
O ct
Nov
Dec
Aug
Sep
Apr
Feb
Jul
Jan
Jun
Y T D W e ig h tin g % Y T D
Y T D P e r fo r m a n c e
B a s e lin e P e r io d
Baseline: 4th Quarter 2006
M a c h in e /P la n t
35%
30%
25%
20% OPX
15%
10%
5%
Y T D W e ig h tin g %P e r fo r m a n c e
0%
M ay
M ar
O ct
Nov
Dec
Aug
Sep
Apr
Feb
Jul
Jan
Jun
YTD
Y T D P e r fo r m a n c e
B a s e lin e P e r io d
Baseline: 4th Quarter 2006
M a c h in e /P la n t
Ontario
OPX Training prep.
OPX Training - Whitby
Whitby Diagnostic
Whitby Implementation
Deliver ~200m of
operational cost
Deliver throughput savings in 2 years
Act as OPX change uplift at each plan
agents
Support and SSCC
collaborate with OPX 1
OPX team
2
OPX individuals
3 • Full Time Members
Plant • Area Champions
• Plant Champions
Plant
Throughput
Time
Beginnings of the Step-change Sustained change
change process improvement during in performance
OPX team post OPX
involvement involvement
Smurfit-Stone Container * Operational Excellence Boot Camp 30
Expectations of the OPX and Area OPX team
• Use the OPX Playbook, tools and other resources to help transform the plant.
OPX Team • Train key personnel in the use of OPX tools
• Communicate findings and progress with local plant management on progression
of the work plan.
• Improve Plant through put.
• Learn the OPX Playbook, Tools and determine other resources that are
Area Champion available and how to access them.
• Work with Site Leaders to learn Preparation, Diagnostic, Design and
Implementation strategies.
• Work with Area Operations Manager to determine an implementation
schedule for Beta plants and the resources that will be required.
• Lead the Area OPX Team in the Beta Plant implementations.
• Learn the OPX Playbook, Tools and determine other resources that are available
Plant Champion and how to access them.
• Work with respect to the Work plan and give feed back as to the successes and
failures.
• Apply the tools to determine the greatest opportunity in the plant and drive through
put.
• Deliver a consistent message to all management and shop floor employees.
Mindsets and
capabilities
OF CHANGE
Think 25% Act/implement 75%
3 In addition, the mini-transformation must bring changes in • Install the systems that
experiences, expectations, role modeling, and skills to create this “new way of
drive real ability and desire to run the line better life” in operations
4 Each organizational position has a specific role to play once • Train change agents to
the production system is installed, and a desired mindset kick-start the change
and capability level to target during the mini-transformation
• Prepare line leaders and
5 Change agents bring “bursts” of change through redesign operators to sustain the
of the operating and management systems, and creating change
experiences and skills to create the performance culture
Order # Supervisor
Box ID
Shift Machine#
Speed Trial:
Challenging the current machine speed to achieve free speed opportunity and identify Speed at which
Road Blocks / Constraints are impeding further speed increases.
Note:
Speed is to be moved up in increments ensuring necessary run stability prior to increasing again, a good
guide is 10 - 15pc increments stable for 3-5 minutes.
10
Smurfit-Stone Container * Operational Excellence Boot Camp 43
Please return to Supervisor at end of order
Target Kicks Actual Kicks Avg
Machine: 081 RDC Date: Shift: Operator: (whole shift) 12,800 (this shift) Kicks/hr
16,000
Top Problem and Action Taken
Initial
Supv
Hr
14,400
12,800
1
11,200
9,600
2
Total Kicks Made
8,000
6,400
3
4,800
3,200
4
1,600
0
5
HOUR 1 2 3 4 5 6 7 8
Kicks (# last HR)
Total Kicks 6
Downtime (for Hr)
Speed (kicks/min) 7
Tgt Speed 90 90 90 90 90 90 90 90
Available at Set Up? (Y/N)
Target Actual 8
Order Time Time Stock Ink Plates Cut Die Paperwork Pallets
20
Target Actual Available at Set Up? (Y/N)
20 Order Time Time Stock Ink Plates Cut Die Paperwork Pallets
Setups: 20 20
20 20
20 20
20 20
20 20
Smurfit-Stone Container * Operational Excellence Boot Camp 44
RDC Recipe Card Customer: Estimate #:
Box i.d
Machine(s): Minimum Speed Max. Speed Achieved:
Feed Table: O/S Front Stop: D/S Front Stop:
Backstop: O/S Side Guide: D/S Side Guide:
Feed Roll: Kicker Bar:
Layboy Belts: Top line = Distance of the base of the layboy arm from centre line
Bottom line = Distance of the layboy arm from the centre line of the support bar
#1 #2 #3 #4 C/L #5 #6 #7 #8
Setup Photographs
MIFA • Material and Information Flow Analysis (MIFA) depicts all the actions required to
bring a product through the flow from raw materials to the customer
• A MIFA is a one page, end to end overview of the entire operations, opportunities
and bottlenecks
• Creating a MIFA forces you look at the big picture, not just the individual
processes or tasks. The goal is to optimize the whole, not the individual
components
• Information gathered to create the MIFA should be obtained first-hand, and
directly from observations the shop floor
OEE
• Overall Equipment Effectiveness (OEE) is a measure to evaluate the
productiveness of a machine or a production line
• The higher the OEE, the more good product per shift a machine or line produces
• OEE analysis is a tool used to analyze equipment performance, and should be
used in support of business objectives where there is a clear need
– Bottlenecks (machine or process) which constrain the capacity of a value stream
to meet customer needs
– High capital cost equipment where utilization must be raised to reduce asset
size
Smurfit-Stone Container * Operational Excellence Boot Camp 47
THERE ARE 6 STEPS TO CREATING A CURRENT STATE MIFA
Key Points:
• Draw in customer(s)
Big Staley
50 Saturn
Key Points:
• A Process is NOT the same as a
50 Kop
department or function
• A process is an activity where material can
stagnate either side
FLX 66
• Parallel processes are to be drawn above
each other-- although, this may not always
be possible (e.g. when there are 6
converting machines)
Speed = 2 h
23% Output =16 50 Kop
OEE = 19%
Corrugator capacity is greater K/hr = 2,252 2/2/2
• Bander is not a bottleneck
than converting, however
Speed
Output= =2 10
h • Improvement opportunity
excess capacity is filled by
OEE = 15% with steady operations and
sheet work 14% improved staging
FLX 66 K/hr = 1,783
-/2/-
Sheet Output
3% Speed
Output==22h ~ 8 MMSF
OEE = 7%
K/hr = 596 11%
Source: Team analysis, client productivity data (Sept 2006). *Based on 80% OEM for converting, FI targets for corrugator and machine measured cycletime for the
Bander
STEP 4: GATHER INVENTORY DATA KEY
EXAMPLE
-/-/- = FTE/Shift
Output = MMSF/mth
Material and Information Flow (MIFA) OEE*= % scheduled
Lf/hr = Feet per hour
K/hr = kicks per hour
Production scheduling Customer service
Daily orders ~ week in advance
Orders 1x/week Orders daily
Supplier Customers
Speed = 2 h
23% Output =16 50 Kop
OEE = 19%
Corrugator capacity is greater K/hr = 2,252 2/2/2
• Bander is not a bottleneck
than converting, however 0 day
Speed
Output= =2 10
h • Improvement opportunity
excess capacity is filled by
OEE = 15% with steady operations and
sheet work 14% improved staging
FLX 66 K/hr = 1,783
-/2/-
Sheet Output
3% Speed
Output==22h ~ 8 MMSF
OEE = 7%
K/hr = 596 11%
Source: Team analysis, client productivity data (Sept 2006). *Based on 80% OEM for converting, FI targets for corrugator and machine measured cycletime for the
Bander
STEP 5: DETERMINE EXTERNAL MATERIAL FLOW KEY
EXAMPLE
-/-/- = FTE/Shift
Output = MMSF/mth
Material and Information Flow (MIFA) OEE*= % scheduled
Lf/hr = Feet per hour
K/hr = kicks per hour
Production scheduling Customer service
Daily orders ~ week in advance
Orders 1x/week Orders daily
Supplier Customers
Daily production
Ward RDC Customer lead-time ~ 3-5 days
Schedules to plant
and daily variances
3/3/3
back from plant • Converting is current
2-4 week
Speed bottleneck, given corrugator
lead-time Output==215
h
21% OEE = 21% has capacity to generate
external sheet work
K/hr = 1,900
• Converting improvements
will shift bottleneck to the
corrugator
1x/week Big Staley ~25/day
2/2/2
11% Speed
Output==8
2h
Corrugator OEE = 14% 38 Saturn Bander
K/hr =1,223 2/2/2
~30-40 6/4/4 1/1/1 <2/3 day
days Speed
Speed
Output==271
h Output= =2 12
h Speed
Output= =2 71
h
OEE = 58% 17% 50 Saturn OEE = 16% OEE =28%
LF/hr = 23,618 K/hr = 2,462
Key Points: 2/3 day 3/3/3
Source: Team analysis, client productivity data (Sept 2006). *Based on 80% OEM for converting, FI targets for corrugator and machine measured cycletime for the
Bander
STEP 6: DETERMINE INFORMATION FLOW KEY
EXAMPLE
-/-/- = FTE/Shift
Output = MMSF/mth
Material and Information Flow (MIFA) OEE*= % scheduled
Lf/hr = Feet per hour
K/hr = kicks per hour
Production scheduling Customer service
Daily orders ~ week in advance
Orders 1x/week Orders daily
Supplier Customers
11% Speed
Output==8
2h
Corrugator OEE = 14% 38 Saturn Bander
K/hr =1,223 2/2/2
~30-40 6/4/4 1/1/1 <2/3 day
days Speed
Speed
Output==271
h Output= =2 12
h Speed
Output= =2 71
h
OEE = 58% 17% 50 Saturn OEE = 16% OEE =28%
LF/hr = 23,618 K/hr = 2,462
Key Points: 2/3 day 3/3/3
How much time per shift How well did the machine How many products were
was the machine actually perform (compared to the good the first time?
running? rated speed) when it was
actually running?
1 Breakdowns
Availability rate Downtime losses
2 Setups
3 Minor stops
Performance rate Speed losses
4 Speed loss
5 Scrap
Quality rate Quality losses
6 Rework
Time losses for breakdowns and setups need to be understood to improve the
availability rate
Examples
Breakdowns:
• Transfer of product is not possible due to broken
• Lost time due to machine failure
conveyor or faulty automation
• Loss measured by operator/ • Machine is shut off because of failures
maintenance tracking system
• Equipment stopped because operator is missing
Examples
Setups: • Fixtures and/or material types need to be changed
• Time interval between last good because of different product (product change)
part from prior run to first good • Equipment fixtures/tools need to be changed (tool
part from new run with machine change)
operating at rated speed • Periodic tests must be performed for product quality
• Measured by operator or process capability
downtime tracking or time study
Time losses for idling and minor stoppages as well as speed losses need to be
understood to improve the performance rate
Examples:
Minor stops:
• Downstream equipment is idle because product
• Lost time due to unplanned
supply from previous process is insufficient
stoppages other than
• Operators pause to “tweak” equipment (e.g., label
breakdown or setup
dispenser needs a minor fix or reloading; normal
• Measured through operator
work flow is interrupted)
tracking or calculated
Examples:
Speed Loss:
• Actual index time for an automated line is longer
• Lost time due to machine
than the ideal index time of 60 seconds (e.g.,
operating at slower speed than
produced 30 pieces in an hour when we should have
process design standard
been able to make 60 pieces in that period of time)
Time losses for scrap and rework need to be understood to improve the quality rate
Examples:
Scrap:
• Production time lost producing • Products that are caught at the source and scrapped
unusable materials
• Materials that are lost in the process
– Yield losses
• Measured scrap then converted – Material leakage/salvage, etc.
to time loss
– Startup material loss
Examples:
Rework: • Product that is rejected at final inspection, or end of
• Production time lost from process checks, then reworked to an acceptable
defective parts rejected at end quality level
of line or afterwards
• Measure usually a reject log of
total parts lost then calculated
for lost time
Total Time
(i.e., 24 hours x 7 days)
Non working time
Total Working Time
(e.g. weekends)
Corrugating OEE
Percent of time Effort and timing of OPX
elements is phased based on
3 9
100
93 15
throughput potential
5 2
17
61
3 0
Key learning
58 • Develop OEE across all
machines in order to get
accurate perspective of
Available Break- Setups Oper- Minor Speed Running Scrap Rework Effective performance losses
time downs ating stops loss time time
time
• Not all improvement
potential may be required
Converting OEE
Percent of time* as only bottleneck
improvement will increase
13 4 8 throughput of plant
100 45
2
• Collect detailed OEE
information that can then
53 19
be used as data for
17 – Set-up analysis
17 16 – Minor stop reasons
1 0
Available Break- Setups Oper- Minor Speed Running Scrap Rework Effective
time downs ating stops loss time time
time
1. Undertake simulation
Process • Use plant production data sheets to determine overall OEE
• Analyze minor stops data sheets to determine quantities of each major
OEE category
• Calculate category percentages
• Build OEE waterfall
2. Discuss with group results
Time
• MCH hours
Monthly targets difficult due to
• Number of shift plant is open
different number of days worked
Description
• Develop an overall target that is achievable yet is large enough
Set plant to drive real improvement
target
95 85
Converting +35%
63 63 20
75
Bander/Total 71 71 71 85 +20%
8 8
63 63
To ensure plant
can operate at
new target
No MMSF impact Sheet work stopped and Corrugator ensure that plant
but removed converting absorb work. As improvements does not run out
improvement converting outpaces Corr. result in overall of work by
mindset issue then stock-outs expected. plant output bringing in from
Excess converting capacity increasing other locations
may require machine to
Smurfit-Stone Containerclose
* Operational Excellence Boot Camp 69
Source:Team analysis, Productivity data for September 2006
TARGET FOR PLANT IS CASCADED TO A MACHINE LEVEL
Sample OPX plant
Baseline OPX
* target***
*Baseline speed, output, and machine hours from September 2006; OEE from observation
**Avg. Speed calculated as total output/machine run hours
***All OPX targets assume current product mix
Smurfit-Stone Container * Operational Excellence Boot Camp 70
Source:SSCC operations report; team analysis
COMPARE MACHINE TARGETS TO INDUSTRY BENCHMARKS TO TEST
ABILITY TO ACHIEVE
Sample OPX plant
MSF/MH Benchmarking*
50” Saturn 30 37 34 57
50” Koppers 20 32 34 57
Converting - RDC
Ward RDC 32 43 26 45
Big Staley 17 29 26 45
*Benchmarking detailed per machine type and size as part of scaling team effort; all benchmarking completed
on a MSF/MH basis for comparison purposes
Smurfit-Stone Container * Operational Excellence Boot Camp 71
Source: Team analysis; SSCC operations report
Plant targets breakout exercise
• Plant started to change program one year earlier and has already increased
Background throughput by 10%
• Plant leadership fully supports OPX
• This is an Alpha plant – will be given as much customer work as it can produce
• Within 12 months a new corrugator and new converting equipment will be installed.
The Scaling team expects throughput will be 1.8 MMSF/shift
Production (MMSF/shift)
• Current 1.0 1.0 1.0
• Max* 1.2 1.5 1.8
Production (MMSF/shift)
• Current 1.0 1.0 1.0
• Max* 2.0 2.0 1.4