tags, print plates, cutting die, and for the next setup is on
ink on the setup cart match the the conveyor and is
factory card. complete from
corrugator.
Duties to Be
As soon as the last box enters the
Done
hopper, raise the pre-feeder Ensure that correct
BEFORE
extender. dunnage is available for
Machine
next order.
Stops
Once the last box has passed
Running
through the machine, cut the air When set up cart and
off the feed table then raise the board are prepared, let
impression on the die-cut crew leader know.
cylinder.
Attention: When you are done your individual tasks and Before moving to the next
step, you MUST check with the Crew Leader for additional duties to get the
machine closed as quickly as possible.
Duties to be
done Once the Takeoff Operator has set Setup pre-feeder: Post Set Up
AFTER the up the feed table, feed one sheet. a. Adjust the position a. Last order print card
machine is of the stop. is filed away.
closed Measure the distance that the b. Lower pre-feeder b. Last order printing
register is out on the cutting die extender. plates are washed
and each print down. Make all c. Set position of side and returned to
adjustments before running a tampers. returns area.
second box so the second sheet d. Run board up c. Last order cutting die
will be in register. extender. returned to returns
area.
Set die cut impression and run Set Chicago Electric d. Tooling repair
second box. If further adjustments requests completed
are necessary, make adjustments. Set bundle breaker as required.
e. Last order ink
Send box into stacker accumulator Once order is running: returned to returns
and use it to set gates. a. Enter last order’s area.
production f. All remaining load
Once stacker is set, remove box information into tags from last order
from stacker and perform 31 computer. destroyed.
quality checks. b. Send out last unit g. Unused dunnage
of last order with returned to dunnage
Start running order. the factory card area.
attached.
Once order is running, check ink c. Perform 31 quality
PH and viscosity and maintain checks
during production run.
* Remember these are guidelines to reduce setup times on the machine. If your crew has a
method that is quicker and more efficient, let us know and we will change this form to fit the
enhanced method!! (Example: Machine Operator and Takeoff Operator set up roles can be
exchanged)