• In detailed Checklist was formulated to check and confirm each and every points that has to be ensured from bottom of the scaffolding to top of shutting boards • 3 level inspection was carried out by M/s Karan, M/s Hitachi and BALCO teams and also a joints inspection was carried out before signing off check list by all three parties. • Scaffolding checked and approved by BALCO’s scaffolding champion. And same has been verified by HSE. Also,Safety team will be present during casting. • Rescue team has been already informed and will be present during activity. • All documents required for gate entry of 5 nos of miller vehicles checked by security. They will be entering plant without any waiting at gate at highest priority. • Installation of concrete pump and pipeline up to casting level has been completed. Same has been checked and verified by M/s Hitachi. • Fitness certificate of concrete pump shared by RMC. • In case of any breakdown of batching plant, RMC has tied up with other batching plant to ensure uninterrupted supply of concrete. • Standby pump will be entered plant on 25.03.2022 morning and sufficient amount of additional diesel stock will be maintained for continuous pump operation.