Construction Equipment
(CEng-5193)
1 Lecture on
Introduction
March 31, 2015
2 Aims
cycle times,
costs.
3 Objectives
Estimate and Perform the analysis needed to determine costs and productions of given
construction equipment.
Until the 19th century and into the early 20th century heavy machines were drawn
under human or animal power.
Construction equipment’s and plants are one of the most predominant factors
that affect project cost and ultimately profit in the construction industry.
Thus we have to give a great attention for such equipment’s to get the required
out put or product.
With the identification of the activities which will be carried out with the
help of equipment’s, work of equipment planning starts.
Following are the main points planner has to decide in equipment planning.
a) Working Shifts: By increasing the number of shifts we can reduce the number
of equipment required, as the same equipment can be used in second and
third shift. This helps in reduction in initial investment of capital.
17 Cont’d….
(b) Number and Size of Equipment’s: For deciding the number and size of the
equipment’s following factors should be considered.
Quantum of work,
When quantum of work is too much then bigger size equipments are selected.
(c) Matching Units: There are certain equipments, which are used together in a team
with other equipments, like scraper with pusher Dozer, concrete batching plant with
truck mounted concrete mixers, paver finisher with road rollers, wheel loaders with
dumpers/dump trucks etc.
18 Cont’d….
The time when equipment is required is decided by the starting time of the
activity for which this equipment is required to be used.
(e) Workshop and Stores Planning: While planning for the purchase of
equipments, it is necessary to plan for the workshop and stores for carrying out
the repair and maintenance.
(f) Man power planning: Planning for manpower in order to operate the
equipment and to carry out the repair and maintenance is also necessarily be
done sufficiently in advance.
In case skilled and trained manpower for the operation, maintenance and
repair is not available then efforts should be made to train them before the
arrival of equipments in the project.
20 Cont’d….
(g) Site Conditions: Site conditions play an important role in deciding the type
of equipment.
Increase the rate of output through work progress with the best effective and
efficient methods.
Eliminate the heavy manual work by human thus reducing fatigue and eliminates
various other hazards and health issues.
One can state many reasons why construction equipment or plant management
is relevant for the successful completion of a construction project or in this
specific case for the profession construction technology and management.
These reasons can generally fall into four major themes called
Resources,
Productivity / Efficiency,
Quality, and
The integration of technology and management of each individual resource and their
combined outcomes are necessary for the successful completion of a construction work
or service.
For instance, decisions regarding equipment types in use and their skilled manpower are
important factors on the performances of construction works or services.
Therefore, while construction technology deals with the way how best you can
replace the human labor with technological advancement to create or upgrade
construction equipments or plants together with their usage by skilled manpower;
construction management focuses on relationship management among different
types of resources, stakeholders and activities with regard to their planning,
implementaion and monitoring for optimum output, that is productivity
25 Quality
Use of Construction equipment’s and plants often give a harmonized and standardized
output against variations of quality that could be achieved among different skilled
manpower.
Therefore, use of equipment and plants increased the quality of materials, components
and the whole product of a construction process.
26 Development