You are on page 1of 13

INSTRUCTION MANUAL

PACKAGE BOOSTER PUMP

LOTTE CHEMICAL TEMPORARY PROJECT


Installation & Set up
1. Carefully unpack the controller and inspect thoroughly. Remove any packing materials within the controller.
Locate the pressure switch adjustment dial within the supplied materials, and install in accordance with the
pressure switch instructions.
Total Process can take 6-12 month
2. The controller should be located as close as is practical to the motor it controls and within sight of the electric
motor, preferably ten feet or less. The controller can be either wall or floor mounted depending on the style of
Option available
controller required. The controller is not free standing and should be mounted with feet or bolted securely to a
wall Mount the enclosure in an area free from spraying or dripping water. Ensure there is adequate access to all
A. One time one Year
interior and exterior installed components (pressure switches). Dimensions and weight vary by type of controller.
Contact factory for specific information.
B. Multi years
3. If the controller is supplied as part of a package system, the pressure sensing lines are generally pre-installed on
the package. The controller is provided with a ¼” NPT female system pressure connection located on the bottom,
external side of the enclosure.

www.wtu.co.id
START UP
 To start manual 1st pump, turn selector switch on the left side to
Man (M)
Total Process can take 6-12 month
 To start Automatic 1st pump, turn
Optionselector
available switch on the left side
to Auto (A)
A. One time one Year
Pump will automatically on when pressure drop below 1,5 bar
Pump will automatically off when pressure
B. Multi years exceed 2,5 bar

 To turn of pump manually, turn selector switch to Off position (O)

www.wtu.co.id
START UP
 To start all pumps manually, turn selector switch on the left side
and right side to Man (M)
Total Process can take 6-12 month
 To Start Automatic All Pump, turn selector switch on the left side
Option available
and right side to Auto (A)
A. One time one Year

 1st Pump will Automatically onB.when pressure drop below 1,5 bar
Multi years
 2nd Pump will Automatically on when pressure drop below 1 bar
and off when pressure exceed 2 bar
 Both Pump will automatically off when pressure exceed 2,5 bar.

www.wtu.co.id
INDICATOR

Lights on when connected to power


*Alarm buzzer indicate pump
Total Process can take 6-12 month
overload, please turn off pump and
restart
Option available

Lights on when pump A. One time one Year


is running

B. Multi years

Lights on indicating trip or electrical failure, please contact our service number

www.wtu.co.id
What is in the package?

• 2 set of pumps c/w electric


motor
• Membrane tank
• Controller
• Pressure Gauge
• Pressure Switch
• Header, Valves and Flexible
Joint

www.wtu.co.id
OUR TEAM
OUR PROJECT
TEAM wtu@wtu.co.id

Sales Team: After Sales


Service Team:

082278415800

081312171944

www.wtu.co.id
OUR PROJECT
TEAM
Engineering Team: Admin Team:

08155238120

www.wtu.co.id
PROJECT LIST
UL LISTED & FM APPROVED INSTALLATION

www.wtu.co.id
PROJECT LIST
FIRE PUMP PROJECT (NON LISTED)

INDO BHARAT RAYON CLEON ALESSANDRO PT LIKU TELAGA JAWA 1 CCP JHL ALFAMAR
PARK GALLERY T

AUSMELT AIR THE PARK MALL KENDARI LOGOS ELNUSA RSUD DR. M. YUNUS HOLIDAY
LIQUID IN

SDJ BUMA JIC UNIVERSITAS IBIS RADEN SALEH WOODONE INDOMARCO KEJAKSAAN AGUNG
CIPUTRA

AND MANY OTHERS

www.wtu.co.id
OFFICE WORKSHOP & WAREHOUSE

Komp Pergudangan Bizlink Citra Raya Blok.O 06 No. 05 Sukamulya Cikupa


Kab.Tangerang, Banten 15710

www.wtu.co.id
THANKS

You might also like