Emergency DG
NC NO NC Line PT 1&3
I/C-03 from
19-HT-201
NC NO Line PT Line PT
2& 3 1& 2
OFF
Unrestricted
OFF IND
EDG I/C-01
B/C-02
Auto
I/C-02
B/C-01
I/C-03 A/I/M Switch
Trip Selection Switch
OFF
Line PT Line PT
2& 3 1& 2
OFF
After Resumption of power from the grid following activities to be performed to take I/C-01 and I/C-03 in Line:-
1) Line voltage should be available on LPT-01. Auto MAN
2) Put the Line Selector Switch on LPT 1&2.
3) Put the EDG sync Switch in Auto mode.
Synch Switch
4) Put the trip selector switch on I/C-02
5) The auto sync relay will sync the line voltage with EDG Voltage and will close the I/C-01 and trip the incomer 2.
OFF IND
EDG
I/C-01
B/C-02
Auto MAN
I/C-02
B/C-01
I/C-03 A/I/M Switch
Trip Selection Switch
Line PT Line PT
2& 3 1& 2
OFF
After Resumption of power from the grid following activities to be performed to take I/C-01 and I/C-03 in Line:-
1) Line voltage should be available on LPT-01. Auto MAN
2) Put the Line Selector Switch on LPT 1&2.
3) Put the EDG sync Switch in Auto mode.
Synch Switch
4) Put the trip selector switch on I/C-02
5) The auto sync relay will sync the line voltage with EDG Voltage and will close the IC-01 breaker in auto mode. Then
Trip the Incomer-02 manually.
6) Take I/C-03 in line through momentary Paralleling by keeping trip selector switch on B/C-02.
7) Put the A/I/M Switch in Manual mode and close the I/03 breaker through TNC. Moreover, B/C -02 breaker will be
off through momentary Paralleling scheme.
8) DG is running offload so ask the operator to switch OFF the DG