RETScreen Eficiencia Energetica Es
Uso final
Optimizar Maximizar Minimizar
el suministro la eficiencia el uso
Pasos
Modelo de Eficiencia
Energética de RETScreen®
RETScreen Energy Model - Energy efficiency measures project
Fuel Fuel type 1 Fuel type 2 Fuel type 3 Fuel type 4 Fuel type 5 Fuel type 6
Fuel type Electricity Natural gas - m³
Fuel consumption - unit MWh m³ #N/A #N/A #N/A #N/A
Fuel rate - unit $/kWh $/m³ #N/A #N/A #N/A #N/A
Fuel rate 0.100 0.400
Pasos:
Occupied Occupied Occupied Occupied Occupied
Temperature - space heating °C 23.0 21.0
Temperature - space cooling °C 23.0 24.0
Unoccupied Unoccupied Unoccupied Unoccupied Unoccupied
Temperature - unoccupied +/-°C 3.0
Occupied Occupied Occupied Occupied Occupied
Occupancy rate - daily h/d h/d h/d h/d h/d h/d
Monday 24 18.0
Tuesday 24 18.0
Wednesday 24 18.0
Thursday 24 18.0
Resumen (energía)
Ele c trical e quipment
Hot wate r
Othe r
Total 2,686 0 0 60,000 28,659 0 2.09
Análisis de emisión
consumption - Fuel Fuel Fuel cost
Fuel type unit Fuel rate consumption Fuel cost consumption Fuel cost Fuel saved savings
Natural gas m³ $ 0.400 160,194.2 $ 64,078 88,546.3 $ 35,419 71,647.8 $ 28,659
Total $ 64,078 $ 35,419 $ 28,659
Análisis financiero
Energy GJ GJ GJ GJ
Energy - base case 4,204 0 0 4,204
Energy - proposed case 2,324 0 0 2,324
Energy saved 1,880 0 0 1,880
Energy saved - % 44.7% 44.7%
Benchmark
Energy unit kWh
Reference unit m² 7,500
User-defined m² 2,000
Sistema de calefacción
Sistema de refrigeración
Envoltorio de la construcción
Ventilación
Luces
Equipamiento eléctrico
Agua caliente
Bombas
Ventiladores
Motores
Características de las Instalaciones
Resumen de combustible
Verificación del proyecto
Valores de Referencia
Emisión & Análisis Financiero
Método 1
RETScreen Energy Model - User-defined
Método 2
RETScreen Energy Model - Energy efficiency measures project
Fuels & schedules Show data
User-defined
User-defined Energy Fuel Fuel type 1 Fuel type 2 Fuel type 3 Fuel type 4 Fuel type 5 Fuel type 6
Fuel type Electricity Natural gas - m³
Green power Fuel consumption - unit MWh m³ #N/A #N/A #N/A #N/A
Other Fuel rate - unit $/kWh $/m³ #N/A #N/A #N/A #N/A
Fuel rate 0.100 0.400
RETScreen Cost Analysis - Energy efficiency measures project
Base case Proposed case
Schedule Unit Settings Schedule 1 Schedule 2 Schedule 3 Schedule 4 Schedule 5 Schedule 6
Technology Grid electricity Wind turbine Description Method 1 24/7 Notes/Range Second currency
Power capacity kW 2,000 Method 2 Occupied OccupiedSecond currency
Occupied Occupied
Notes/Range Occupied None
Temperature - space heating °C 23.0 21.0
Capacity factor % 30% Temperature - space cooling °C 23.0 24.0
Cost allocation
Electricity exported to grid MWh 5,256 Initial costs (credits) Unoccupied UnoccupiedUnit Unoccupied
Quantity Unoccupied
Unit cost UnoccupiedAmount Relative costs
Temperature - unoccupied +/-°C 3.0
Incremental initial costs $/kW 2,000 Feasibility study
Feasibility study Occupied Occupied cost Occupied Occupied Occupied
$ -
O&M (savings) costs $/kWh 0.010 Occupancy rate - daily h/d h/d RETScreen
h/d Emission
h/d Reduction h/d
Analysis - Energy
h/d efficiency measures project
Sub-total: $ - 0.0%
Electricity export rate $/kWh 0.150 Monday
Development
24 18.0
Emission Analysis
Tuesday 24 18.0
Development cost $ -
Wednesday 24 18.0
Thursday Sub-total: 24 18.0 $ - 0.0%
Engineering
Method 1 Global warming potential of GHG
Friday 24 18.0
Emission Analysis Saturday Engineering 24 18.0 Method 2
cost $ - 21 tonnes CO2 = 1 tonne CH4 (IPCC 1996)
Sunday Sub-total: 24 18.0 Method 3 $ - 0.0% 310 tonnes CO2 = 1 tonne N2O (IPCC 1996)
Occupancy rate - annual h/yr Energy efficiency measures
8,760 6,570 0 0 0 0
GHG emission % Incremental initial
100% costs 75% 0% 0% 0%
RETScreen Financial Analysis - Energy efficiency measures project
0%$ 60,000 100.0%
factor T&D GHG emission Balance of system & miscellaneous Financial parameters Project costs and savings/income summary Yearly cash flows
Heating/cooling changeover temperature °C 16.0Spare parts
Base case system GHG summary (Baseline)
Base case electricity system (Baseline) (excl. T&D) losses factor % General $ - Initial costs Year Pre-tax After-tax Cumulative
Length of heating season d 242Transportation project Fuel cost escalation
$ rate - % 2.0% Feasibility study 0.0% $ 0 # $ $ $
Country - region Fuel type tCO2/MWh % tCO2/MWh Length of cooling season d 123Training & commissioning p-d Inflation rate CO2
$
emission
-
CH4 emission
% N2O2.0%
emission
Development Fuel
0.0% $GHG emission 0 0 -60,000 -60,000 -60,000
Canada All types 0.211 5.0% 0.222 User-defined cost Fuel mix rate $ factor
Discount - factor
% factor Engineering
12.0% consumption
0.0% $ factor GHG1emission 29,232
0 29,232 -30,768
Contingencies Fuel type
% % 60,000
$ Project life
$ kg/GJ - kg/GJ
yr kg/GJ
40 Power system MWh 0.0% $ tCO2/MWh 0 2tCO2 29,817 29,817 -951
Facility characteristics Show dataInterest during construction Natural gas Heating system 0.0% $ 0 3 299 30,413 30,413 29,463
$ 100.0% 60,000 $ - 1,668 0.179
Electricity exported to grid MWh 5,256 T&D losses 8.0% Sub-total: Total Finance
100.0%
Enter number of months $ - 0.0%
Cooling system 0.0%
1,668 $ 0.179 0 4 299 31,022 31,022 60,484
Incremental Fuel cost Incremental Incentives and grants
Include $ User-defined 0.0% $ 0 5 31,642 31,642 92,126
Total initial costs $ 60,000 100.0%
Show: Heating Cooling Electricity initial costs savings O&M savings Simple payback Debt ratio mea sure? % Energy efficiency measures 100.0% $ 60,000 6 32,275 32,275 124,401
GHG emission Fuel saved GJ GJ
Annual costs (credits)
GJ $ $
Proposed case
$
Unit system GHG
yr Debt
summary (Energy
Quantity Unit efficiency measures
Amount project)
$ 0 Balance of system & misc. 0.0% $ 0 7 32,920 32,920 157,321
Heating s ys te m Equitycost $ 60,000 Total initial costs 100.0% $ 60,000 8 33,579 33,579 190,900
Base case tCO2 1,167 Boiler 0
O&M
- - 0 0 0 - Debt interest rate % 9 34,250 34,250 225,150
Proposed case tCO2 93 O&M (savings) costs project Debt term $ emission - CH4 emission
CO2 yr N2O emissionIncentives and grants Fuel $GHG emission 0 10 34,935 34,935 260,086
Cooling s y s te m
Parts & labour project Debt
Fuel payments $ factor
mix - $/yr
factor 0
factor consumption factor GHG 11emission 35,634 35,634 295,720
Gross annual GHG emission reduction tCO2 1,074 Air-conditioning - 0
User-defined
- 0 0
cost
Fuel type
0 -
% $ kg/GJ - kg/GJ kg/GJ Annual costs and debt paymentsMWh tCO2/MWh 12
tCO2 36,347 36,347 332,066
Building env elope
GHG credits transaction fee % 0.0% Appartment building 2,686 0
Contingencies
- 60,000 Natural %
28,659 gas 0
$ 100.0%
2.1
- $ - O&M 922 $ 0.179 0 13 165 37,074 37,074 369,140
Sub-total: Income tax analysis $ - Fuel cost - proposed case $ 35,419 14 37,815 37,815 406,955
Net annual GHG emission reduction tCO2 1,074 is equivalent to 218 Cars & light trucks not used Ventilation Total 100.0% 922 0.179 165
Effective income tax rate % Debt payments - 0 yrs $ 0 15 38,571 38,571 445,527
Fuel cost - proposed case T&D losses Total
Lights Loss carryforward? No Total annual costs $ 35,419 16 165 39,343 39,343 484,869
Natural gas m³ 88,546 $ 0.400 $ 35,419
Ele ctrical e quipm ent Depreciation method Declining balance 17 40,130 40,130 524,999
GHG reduction income Sub-total: GHG emission reduction summary $
Half-year rule - year 1 35,419 yes/no Yes Periodic costs (credits) 18 40,932 40,932 565,931
Hot wate r
Depreciation tax basis % $ 0 19 41,751 41,751 607,682
GHG reduction credit rate $/tCO2 0.00 Other
Annual savings Unit Quantity Unit cost rate Amount
Depreciation % Gross annual $ 0 Net20annual 42,586 42,586 650,268
Total 2,686 0 cost - base case
Fuel 0 60,000 28,659 0 2.09
Depreciation
Years of period
Base case Proposed yr case 15 End of project life - cost GHG emission $ GHG credits 0
GHG21emission 43,438 43,438 693,706
Natural gas m³ 160,194 $ Tax holiday 0.400 $
available? 64,078 yes/no No 22 44,306 44,306 738,012
occurrence GHG emission GHG emission reduction transaction fee reduction
Sub-total: Tax holiday duration
$ 64,078 yr Annual savings and income 23 45,193 45,193 783,205
Financial Analysis Sum mary Show data Energy efficiency measures yr tCO2 tCO2 Fuel cost - base case tCO2 $ % 64,078 tCO2
24 46,096 46,096 829,301
project 1 to -1income
Annual 299 165 Electricity export income 134 $ 0 25134 47,018 47,018 876,320
Fuel Periodic costs (credits) Base case Unit
Proposed case Year Unit
Fuel cost
cost savings Amount
Electricity export income GHG reduction income - 0 yrs $ 0 26 47,959 47,959 924,279
Fuel User-defined cost $ -
Financial parameters Electricity exported to grid
$ -
MWh 0 Customer premium income (rebate) $ 0 27 48,918 48,918 973,196
consumption - Fuel Fuel Fuel cost
Inflation rate % 2.0% End of project life Net annual
cost GHG emission reduction Electricity export $rate 134 -
$/MWh
tCO2 0.00
is equivalent Other
to income27.2 (cost) - yrs Cars & light trucks not
$ used 0 28 49,896 49,896 1,023,093
Fuel type unit Fuel rate consumption Fuel cost consumption Fuel cost Fuel saved savings
Electricity export income $ 0 CE production income - yrs $ 0 29 50,894 50,894 1,073,987
Project life yr 20 Natural gas m³ $ 0.400 160,194.2 $ 64,078 88,546.3 $ 35,419 71,647.8 $ export escalation
Electricity 28,659 rate % Total annual savings and income $ 64,078 30 51,912 51,912 1,125,899
Total $ 64,078 $ 35,419 $ 28,659 31 52,950 52,950 1,178,849
Debt ratio % 70% GHG reduction income 32 54,009 54,009 1,232,858
Debt interest rate % 7.00% Fuel Fuel Fuel Fuel tCO2/yr 0 33 55,089 55,089 1,287,948
Project verifica tion consumption - consumption - consumption consumption - Net GHG reduction tCO2/yr 134 Financial viability 34 56,191 56,191 1,344,139
Debt term yr 10 Fuel type unit historical Base case variance Net GHG reduction - 40 yrs tCO2 5,342 Pre-tax IRR - equity % 50.7% 35 57,315 57,315 1,401,454
Natural gas m³ 160,194.2 GHG reduction credit rate $/tCO2 Pre-tax IRR - assets % 50.7% 36 58,461 58,461 1,459,916
GHG reduction income $ 0 37 59,631 59,631 1,519,546
Initial costs Heating Cooling Electricity Total GHG reduction credit duration yr After-tax IRR - equity % 50.7% 38 60,823 60,823 1,580,370
Energy GJ GJ GJ GJ Net GHG reduction - 0 yrs tCO2 0 After-tax IRR - assets % 50.7% 39 62,040 62,040 1,642,409
Incremental initial costs $ 4,000,000 100.0% GHG reduction credit escalation rate % 40 63,281 63,281 1,705,690
Energy - base case 4,204 0 0 4,204
Other $ 0.0% Energy - proposed case 2,324 0 0 2,324 Simple payback yr 2.1 41 0 0 1,705,690
Energy saved 1,880 0 0 1,880 Customer premium income (rebate) Equity payback yr 2.0 42 0 0 1,705,690
Total initial costs $ 4,000,000 100.0% Electricity premium (rebate) % 43 0 0 1,705,690
Energy saved - % 44. 7% 44.7%
Electricity premium income (rebate) $ 0 Net Present Value (NPV) $ 225,387 44 0 0 1,705,690
Benchmark Heating premium (rebate) % Annual life cycle savings $/yr 27,340 45 0 0 1,705,690
Incentives and grants $ 0.0% Cumulative cash flows graph Heating premium income (rebate) $ 0 46 0 0 1,705,690
Energy unit kWh
Reference unit m² 7,500 Cooling premium (rebate) % Benefit-Cost (B-C) ratio 4.76 47 0 0 1,705,690
14,000,000 User-defined m² 2,000 Cooling premium income (rebate) $ 0 Debt service coverage No debt 48 0 0 1,705,690
Annual costs and debt payments Customer premium income (rebate) $ 0 Energy production cost $/MWh -791.21 49 0 0 1,705,690
O&M (savings) costs $ Benchmark Heating Cooling Electricity Total GHG reduction cost $/tCO2 (205) 50 0 0 1,705,690
12,000,000 Energy kWh/m² kWh/m² kWh/m² kWh/m² Other income (cost)
Fuel cost - proposed case $ 0 Energy MWh Cumulative cash flows graph
Energy - base case 155.7 0.0 0.0 155.7
Debt payments - 10 yrs $ 398,657 Energy - proposed case 86.1 0.0 0.0 86.1
Rate $/MWh
1,800,000
10,000,000 Other income (cost) $ 0
Other $ Energy saved 69.6 0.0 0.0 69.6
Duration yr
Cumulative cash flows ($)
# No
# No 0
# No 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
# No
-200,000
# No
# No
# No
# No Year
Ejemplo de Proyecto: Agua Caliente
www.RETScreen.net