Maintenance Strategy
A Living Program
ACARP
Roadway Development Operators Workshop
September 2010
Backlog grows
• Continually Improve
A 4% D 7%
Conditional Probability
of Failure
B 2% E 14%
C 5%
F 68%
Age
Dave Alexander – August 2010 Slide 7
Failure Mode Driven Strategy
Shuttle Car
- Frame
- Wheel End
- Hydraulics
- Electrics
- Cable Reel
- Drive System
• Schedule Compliance
• PM Effectiveness
Major Delay Minor Delay Detail Delay Equipment Level 2 Equipment Level 3 Equipment Level 4 Failure Mode
Continuous Miner 01 - Air/Water 02 - Water Filter Assembly Element Blockage
Continuous Miner 06 - Hydraulics 05 - Hoses Wing Extension Retraction Hose JIC Fitting Cross Threaded
Continuous Miner 04 - Electrical System 12 - Electrical System Control Solenoid Coil Insulation Fractured