or upon a slipway for docking survey or under water work. The keel stem, stern frame, stern post, rudder, and outside hull plates are cleaned and examined. Also included in the examination are propeller, sea chest, sea valves, strainers and all the under water fittings. Stern tube, tail shaft, shaft seals, rudder bearings are examined and calibrated Prior to vessels entry into the dry dock, its condition to be ascertained for satisfying the requirements while being dry docked, such as proper draft, trim & head, its tank conditions, de-ballasting of tanks for lightening & trimming, and vessels docking plan. After sitting on the blocks, & after the dock has been pumped out, ship side & bottom to be cleaned & washed down with high pressure jet of water. All safety signs to be displayed. Anchor & chain are to be ranged out for cleaning, cables & joining shackles to be examined. Rudder to be lifted for inspection and clearance to measure and record, bush & sleeve inspected, thrust bearing to be opened, cleaned & inspected.. CHIEF ENGINEER’S CHECK LIST Check the repair list specifications & yards estimation of repairs period etc. Check details of repairers, order all spares required for the works planned & ensure they are arranged. Make out work schedule. Prepare a plan to divide all work properly between all ship’s staff. Check all staging & passages for fire safety and personnel safety. Prior to arrival of the ship at the dry dock Discuss with yard’s representatives the repair list, as approved by company superintendent. Arrange cleaners. Explain repair program on machineries to classification surveyor. Survey application to be made. On arrival of ship, discuss repair list with yard and ship’s staff who will take charge, confirming each repair and survey work and also correct specification & schedule. Review existing conditions with ship’s staff & also repairs procedures to be followed. Understanding of safe working practices to be ascertained from all concerned parties involved in the repairs program. Ascertain docking conditions are favorable like draft, trim, heel etc. Check mooring machinery for proper functioning. All other precautions likely to be taken are informed to al properly and clearly. Ensure that yard is informed about the requirement of shore power, & water. DRY DOCKING WHEN THE VESSEL HAS ENTERED THE DOCK, ENSURE THAT IT IS HELD IN POSITION FOR DRAINING THE DOCK WATER. ENSURE THAT THE SHORE POWER IS CONNECTED AND TESTED. ENSURE WATER AVAILABILITY ON THE FIRE MAIN. ENSURE THAT THE SHIP IS GROUNDED TO EARTH. IMPRESSED CURRENT TO BE SWITCHED OFF. SHIPS POWER TO BE PUT OFF. ENSURE ALL SEA VALVES ARE KEPT OPEN TO DRAIN LINES TO DOCK. ENSURE THAT ALL GAS-FREE AND WORK PERMITS CERTIFICATES ARE POSTED AT THE GANGWAY. ALONG WITH THE SECOND ENGINEER, INSPECT HULL, INCLUDING PLATING FOR EROSION, DAMAGE ETC., PLUGS AND THEIR CONDITION, CONDITION OF ANODES, SEA CHEST GRIDS, TAIL SHAFT AFT SEAL CONDITION AFTER REMOVAL OF ROPE GUARD, PROPELLER BOSS AND BLADES SURFACE CONDITION, RUDDER CONDITION. CHECK SEA WATER LEAKS FROM WELDS, BEARING BUSHES, STRIKING PAD ETC.