Inlet, outlet and vent due to PSV can be considered critical. Drain can be neglected
Vent lines are inter connected and taken to the
flare header which is routed to the flare knock out drum and fired in the flare tower
All drains are connected and taken to the blow
down drum. 4” is not considered
Pig launcher receiver??
The flare header is sloped and the flare lines
are connected using 45 degree to push the fluid towards the knock out drum • Non critical lines Category 1 • Flexibility Analysis Category 2 Checked visually using isometrics and 3D model • B31.3 (319.4) * Critical line complete analysis of pipes is required, • Dy/(L-U)^2 detailed study of support types and loads. Stress B31.3 report is to be provided. Table C-1M Thermal expansion coeff Table C-6 Young’s modulus Allowable stress Table A1-M