Subject : Construction Management
Subject Code : C-604
Topic : Preliminary Planning & Organisational
Aspects
Duration : 50 mins
Sub Topic : Aspects of Preliminary Planning for
Various Projects
Teaching Aids : PPT’s
C604.6 1
Objectives
On completion of this period, you would be able to
• know the Aspects involved in preliminary Planning
for the following Projects
• Irrigation Project
• Road Project
• Rural water Supply
• Housing Colony
• Rural Hospital

C604.6 2
Recap

In the previous class we have discussed about

Preliminary & Detailed Estimates


and
Feasibility & Project Reports

C604.6 3
What is Preliminary Planning?

• The Planning carried out by the Engineering

Department on initiation of the proposal for a

Project either from Public or Government.

C604.6 4
What is Feasibility Report?

• A brief Report submitted to convince the

Government and Public and for the acceptance

of the proposal by Competent Administrative

Authority
C604.6 5
What is Preliminary Estimate?

• It is the Approximate or Rough Cost Estimate of

the proposed work prepared for Administrative

Approval. It is accompanied by Layout Plan or

Site plan and a Brief Report of the Project

C604.6 6
Preliminary Estimate is Submitted for

• Administrative Approval

C604.6 7
What is Project Report?

• The Report which describes the various features

of the Project in detail, so that one can

understand the complete picture of the Project

for Technical Sanction

C604.6 8
What is Detailed Estimate?

• It is the Estimate of Actual Cost of the Project as

per Current Schedule of Rates. It is an important

information provided in the Project Report.

C604.6 9
Preliminary Planning

• While Planning for the proposed project, site

Investigation (along with detailed survey) has to

be carried out and the Department has to

submit Preliminary Estimate.

C604.6 10
Preliminary Planning

• While Planning for the proposed project,

Various Aspects are to be considered

• These aspects differ from project to project

C604.6 11
Preliminary Planning for an Irrigation Project

The Aspects to be considered during

Preliminary Planning for an Irrigation Project

• River or stream discharge Particulars

• Amount of water that can be utilised for

irrigation

• Selection of site for Dam Construction


C604.6 12
Preliminary Planning for Irrigation Project

• Study of Topographic map

• Location of Head works

• Possible routes for alignment

• Area of Ayacut that can be commanded

C604.6 13
Preliminary Planning for Irrigation Project

• Land to be acquired and probable amount of

compensation to be paid

• Number and type of Cross masonry and Cross

Drainage Works to be constructed

C604.6 14
Preliminary Planning for a Road Project
The Aspects to be considered during
Preliminary Planning for a Road Project

• Study of Topo sheet

• Selecting different alternate routes

• Length of Road along each route

• Possibility of connecting as many number of

villages as possible between the terminal Points


C604.6 15
Preliminary Planning for a Road Project

• Site Conditions, its nature, bearing Capacity of


soil
• Nature of ground, amount of Excavation and
filling to be carried out
• Extent of private property to be acquired and its
Probable Cost
• Number of Cross Masonry and Cross Drainage
Works along each Route and their approximate
cost of construction
C604.6 16
Preliminary Planning for a Road Project

• Drainage facilities along each Route

• Position of Quarries

• The probable amount of Revenue to the

Government due to the construction of road

• Any other works to be carried out

C604.6 17
Preliminary Planning for a Rural Water
Supply Project

The Aspects to be considered during


Preliminary Planning for a Rural Water Supply
Project

• Population of the village


• Rate of growth of population
• Possibilities for abnormal growth of population
• Design Period

C604.6 18
Preliminary Planning for a Rural Water
Supply Project

• Per Capita Demand


• Selection of Source of Water – Surface or Sub
Surface
• Quantity available and Variations in the
Quantity
• Quality of Water and Purification Process
required

C604.6 19
Preliminary Planning for a Rural Water
Supply Project

• Quantity of treated water to be stored

• Type of storage tank (Ground or Elevated)

• Pumping units required

• Lengths and sizes of pipes required to convey water at

required velocities

C604.6 20
Preliminary Planning for a Rural Water
Supply Project

• Probable number of private and public tap

connections

• Amount can be realised from the consumer in

the form of tax and any other conditions that

affect the over all cost

C604.6 21
Preliminary Planning for a Housing Colony

The Aspects to be considered during Preliminary


Planning for a Housing Colony

• The area to be selected for Housing Colony and its


Location
• Nature of soil, its Bearing Capacity and type of Foundation
• Drainage facilities
• Amount to be spent to level the ground and internal Roads

C604.6 22
Preliminary Planning for a Housing Colony

• The type of occupants, their living standards and


their income levels
• Whether the area proposed is public property or
private property
• The amount of compensation to be paid in case of
private property
• Minimum Plinth Area required
C604.6 23
Preliminary Planning for a Housing Colony

• Amenities to be provided

• Other facilities like School buildings, Public Parks,

Recreation places, etc.. To be provided

• Availability of required Materials and their Location

• Local Labour Potential and their wages

C604.6 24
Preliminary Planning for a Housing Colony

• Climatic Conditions and any other reasons

affecting the progress of the work

• Number of Houses to be constructed

• Whether the houses having identical features or

different from house to house


C604.6 25
Preliminary Planning for a Rural Hospital

The Aspects to be considered during Preliminary


Planning for a Rural Hospital

• The area to be selected for Rural Hospital and its


Location
• Nature of soil, its Bearing Capacity and type of
Foundation
• Amount to be spent to level the ground
• Number of villages for which the Hospital is meant
for
C604.6 26
Preliminary Planning for a Rural Hospital

• Total population for which the Hospital is intended


• The type and Number of Wards to be provided
• Whether the area proposed is public property or
private property
• The amount of compensation to be paid in case of
private property
• Minimum Plinth Area required
C604.6 27
Preliminary Planning for a Rural Hospital

• Communication facilities to be provided

• Availability of required materials and their

Location

• Local Labour Potential and their wages

C604.6 28
Summary

We have discussed Preliminary Planning for the


Projects of

• Irrigation
• Road
• Rural water Supply
• Housing Colony and
• Rural Hospital
C604.6 29
Quiz

1. Preliminary Planning is carried out to prepare

A. Feasibility Report

B. Preliminary Estimate

C. Detailed Estimate

D. Project Report
C604.6 30
2. Population forecast is necessary for

A. An Irrigation Project

B. Road Project

C. Water Supply Project

D. None of the above


C604.6 31
3. Preliminary Planning of this Project includes
the study of Topo Sheet

A. Irrigation

B. Road

C. Both a & b

D. None of the above


C604.6 32
Frequently asked Questions

1. List the Aspects of Preliminary Planning of an


Irrigation Project
2. List the Aspects of Preliminary Planning of a
Rural Water Supply Project
3. List the Aspects of Preliminary Planning of a
Road Project
4. List the Aspects of Preliminary Planning of a
Housing Colony Project