FINAL PRESENTASI

On the Job Training Operator

(PT. Multimas Nabati Asahan - Serang)

Serang, 30 June 2020


On the Job Training Operator

PT Wilmar Cahaya03
Indonesia
Agustus
13 Juli 2019
2019)
M. TIRTA WIJAYA PT Multimas Nabati Asahan –
KUSUMA Serang
03 Agustus 2019 Sekarang
Activity OJT WICA-Cikarang

Mengganti filter bag


Activity OJT MNA-Serang
Bongkar & Instal Niagara
1. Install Equipment 1. Ganti & Cleaning
Inject BE ke hopper in plant 2. Cleaning Vessel strainer CPO
3. Flushing Line 2. Unblocking &
Instal Leave NF
Inject Citrid Acid

Precomissioning

Proces
Activity Normal
3. Penggantian filter
Bag & Catridge
Special Case Ice Condensing 4. Top up chemical
Cleaning Strainer Ammonia 5. Cleaning inlet
PHE CPO
Cleaning Drain Valve Ammonia 6. Pengambilan
sample
Top up water Condensor

Venting Udara
Activity OJT WICA Cikarang

Mengganti Filter Bag Bongkar&Install Niagara

Parameter control: Parameter control:


 Lifetime 48-50 Jam  Lifetime maks 40 Hari
 Delta Pressure 1 bar  Delta Pressure 2,5 bar
Install Equipment Prestripper
Precomissioning MNA-Serang
: Demister
DEO-1722QE1 : Support
: Distributor
Final Heater : Mellacron
: Mellapack

PFAD
Scrubber Support Demister

Oil Stripper
Distributor Mellacron Mellapack
Cleaning Vessel Flushing Line

BL-1635 Final Heater

1. Persiapkan wiremesh dan perforated


BL-1622 ( Tray 1) Deodorizer (Tray) 2. Media Flushing (Udara atau Air)
3. Kondisi pompa dapat digunakan
4. Line Up & persiapkan skema flushing

BL-1622 (Tray 2)
Scrubber PFAD
Activity MNA-Serang

Ganti & Cleaning strainer CPO Mengganti Filter Bag & Catridge

Unblocking & Instal leave NF


Top Up Chemical Pengambilan sample Refinery

Cleaning inlet PHE CPO


Special Case Ice Condensing

Cleaning strainer ammonia Cleaning Valve Drain Ammonia

Top up water Condenser Venting Udara


10 / 38
START COMPRESSOR AMMONIA
STOP COMPRESSOR AMMONIA