OPERATING COSTS
Ground support costs are driven
by ground conditions, which are
Rockbolts the result of a combination of
($ natural/ geological factors and
333.96 /m)
mining induced factors. This
implies each mine has a unique
approach to ground support that
Mesh is suited to its conditions.
($ 0.00 /m)
This study tests ground support
costs by examining supply and
Shotcrete install costs.
Costs ($ 0.00 /m)
($ 347.34 /m)
Installation intensity is tested by
referring costs to Barton’s Q
Cablebolt index and comparing total
($ 0.00 /m) ground control costs to Barton’s
index.
Capital
($13.38 /
m)
Development - Ground Control Ground support statistics for mining operations
Cannington
Cannington and
Pillara costs are
Unit cost of ground
reasonable
support per m of relative to ground
development conditions
($/m)
Golden
Grove
Big Bell and
Pillara Golden Grove
costs are
potentially too low
Bolting density
x (7.7 bolts per m dev’t)
Work load
Fleet work (47,056 bolts) Supported
hours _.. area
(1.3 m2 /bolt)
(1,828
percussion hrs
Maintenace
pa) . _. Productivity/
working hour
hours/unit (25.73 bolts per
(see jumbo No machines percussion /hr)
drilling)
x in fleet
- 3 * jumbo
Utilization
(see jumbo
drilling)
continued
Golden Groves rockbolt density is high, but the lower cost per
bolt offsets the high density. Installing a higher number of split
sets to achieve a given support regime appears to be a low cost
strategy ….
Labour cost
Rockbolt density ($ bolt)
(bolts/m)
Grouted rockbolts
Golden
Grove
Development - Bolting,
Rockbolting machines are relatively expensive to Higher jumbo rockbolting productivity is the
continued
operate. Lower jumbo installation costs are the result result of using two booms for bolting.
of higher labour utilisation and lower repair costs Productivity measures are based on
from rock fall damage…. percussion hours and may be overstated…...
54.84
45.26
Rockbolt machines
21.70
17.06
12.68
9.05
5.71
Golden Golden
Grove Grove
Development - Bolting,
Rockbolting performance....
continued
Total cash cost per installed bolt
Rockbolt cost ($ / bolt)
($ / bolt)
Grouted
rockbolts
Golden Golden
Grove Grove
Development -
Shotcrete/Fibrecrete
Volume placed Cost/m3 placed shotcrete
(m3 pa) ($/m3)
Canningto
n
Development - Shotcrete,
Key performance indicators on usage of shotcrete within mines...
continued
Application thickness for Mine-wide Usage
standard conditions (m3/m developed)
(mm)
Development - Mesh
Area placed
(‘000 m2 pa) Cost/m2 mesh Mine wide usage
($/m2) (m2/m development)
Darlot Darlot
Development - Cablebolts
Length installed
(m pa) Cost/m installed cablebolt Mine wide usage
($/m) (m/m development)
Darlot
Darlot
Development - Ground support
cost summary
1,131
1,044
803
735
Unit cost of ground
support per m of
development
($/m)
347
89
Golden Grove’s ground support costs are much lower than indicated by
it’s Q index. The absolute difference is in excess of $250 per metre. The
lack of surface control at Golden Grove suggests that as the mine
mature more surface
Very control
Poor (mesh
F / shotcrete)
Good V willExt
be required…...
E
poor ai ry good x
r g c
d g
d
Difference
between
trend and
actual is
$269 per
Golden metre
Grove
Unit cost of
development
services
($/m)
Golden Pillara
Grove
Development - Ground support
and services
Ground support and services - Total costs
0
($’000 pa)
Pillara is the cost benchmark for
ground support. Services have
been reconciled to Pillara to
net out rockbolt grouting costs
Services 1,698 that may have been
1,640 521 Ground support 3,675
Services 2,219 misallocated in other mines
Ground support 2,035
Increasing ground support costs
to match Baton’s Q estimate
will increase total cost by $1
Use of
jumbo for million...
bolting Ground Dev
support in line services Golden Grove’s benchmark
with Barton Q matching review shows:
Pillara
• Ground conditions are the
(Golden Grove) At best practice most important parameter for
managing jumbo costs.
Ground support and services - Unit costs
($ /m dev) • Rockbolting machines are
relatively expensive to use
compared to jumbos, Golden
Grove’s use of jumbos with 3
269 Ground support 603
85 Services 279
metre feeds is a best practice
Ground support 334 compromise for ground
Services 364 0 support effectiveness and
jumbo costs
Use of Dev
jumbo for Ground
services
bolting support in line
matching
with Barton Q
Pillara
NB: Ground support excludes capital to
avoid double counting
(Golden Grove) At best practice
Development - Cost summary
Ground quality has the biggest impact on development costs…...
2,446
2,161
1,833
1,717
Unit cost of
development
services
($/m)
1,066
Golden Grove
Geol Dev’t Prod TransFill Tech
Cannington’s use of
paste fill helps lower
Unit cost of ground
stope ground support
support per cubic Kanowna costs
metre of stope Belle
production
($/m3)
Cannington
Pillara Darlot and Pillara
costs are
reasonable
To sub level stope relative to ground
Big Bell would conditions
Big Darlot
incur a cost
Bell
$10.00 per tonne
in ground support
Golden
Grove
Production- Ground control
Installation intensity * Total stope ground support cost
(m3 / m of cablebolt) ($/m3)
NB: Big Bell cablebolts are used exclusively in development and are not
attributed to stope support
Production- Ground control
Installation intensity * Total stope ground support cost
(m3 / m of cablebolt) ($/m3)
NB: Big Bell cablebolts are used exclusively in development and are not
attributed to stope support
Production services include all services directly attributed to stope operations……..
Unit cost of
production services
($/m3)
Golden Grove
Production - Ground control
Production ground support - Total costs
Geol Dev’t Prod TransFill Tech
($’000 pa)
Services 247 186
Ground support 1,567 Golden Grove is the benchmark
0 0 0 0 0 1,628 for ground control costs, with
service costs equalised to
Barton Supplies Labour Equipme Drilling
estimate nt
Services provide an equivalence
measurement.