Charging

Piles
New Energy Charging Pile Project Risk Analysis

www.docer.com
Panelists:

1. WangYutong P125639
2. Zhang Yu P125631
3. Wang Yibo P125660
4. Zhang Jinpeng P125647
5. PAN RUOLIN p125632
6. YAN RANYI P125717
7. TianXinyuan P125641

www.docer.com
Catalog

1. 2.
Identify potential risk assessment
risks matrix

3.
FMEA analysis
YOUR LOGO 金山办公软件有限公司

Identify
potential risks
PART / ONE

www.docer.com
产品介绍 YOUR LOGO 金山办公软件有限公司

Fire 01
Measures: sudden fire: remember not to be chaotic, first
orderly de-crowding, close the electric switch, the
Extinguish the fire with a fire extinguisher and report to the
company. If you find a serious fire, call 119 and tell the fire
situation and detailed address.
Found the use of open fire, such as smoking, etc.: promptly
discourage and inform customers that the station is strictly
prohibited open fire and its risks, prevention before it is too
late.

Translated with www.DeepL.com/Translator (free version) 。


产品介绍 YOUR LOGO 金山办公软件有限公司

Natural disasters 02
Natural disasters such as earthquakes, floods, typhoons and tsunamis are force majeure,
and although the probability of occurrence is small, they can cause serious damage to
charging station construction projects. Charging station construction projects are
designed for the safety of the electric power system, and the impact of natural disasters
on charging stations is likely to affect the entire electric power system and have a
significant impact on people's livelihoods. In recent years, due to the greenhouse effect,
extreme weather conditions have been occurring, which has placed higher demands on
the safety of charging station construction. In addition, the southeast coast is one of the
most economically developed regions in China, and is also in the best position to give
priority to the development of electric vehicles, and this region is often attacked by
tropical typhoons in summer, so the impact of the natural environment should be fully
considered in the construction of charging stations.
产品介绍 YOUR LOGO 金山办公软件有限公司

Natural disasters 02
For construction projects, poor geological conditions have an
important impact on the smooth implementation of the project. From
the construction aspect, poor geological conditions will increase the
difficulty of construction, delay the planned construction period, and
require additional construction machinery; from the economic aspect,
poor geological conditions will increase the cost of machinery,
auxiliary materials, and labor. Moreover, some charging stations need
to build maintenance trenches and lay underground circuits, which will
further increase the difficulty of construction.
产品介绍 YOUR LOGO 金山办公软件有限公司

Hardware failure 03
According to reports, the Guangdong Institute of Product Quality Supervision
and Inspection announced for the first time the results of risk monitoring of
electric vehicle charging pile products. The results show that more than 70% of
the monitored samples have safety hazards. The test samples were collected for
the Institute to purchase 10 batches of electric vehicle charging pile products
from nine manufacturers from the market, of which seven batches did not meet
the requirements of the national standard, there are serious safety hazards. The
risk monitoring found that the samples had four items that did not meet the
requirements of the national standard and were prone to catch fire and cause
electric shock to users.
产品介绍 YOUR LOGO 金山办公软件有限公司

Theft 04
Because the cost of new energy charging posts is high and they are all
metal parts, the charging posts have a certain economic value. Around
the world, many charging posts have been stolen because of this
feature. Secondly, many people who do not have private charging
posts and have low moral character also steal public charging posts
and use them as private charging posts.
产品介绍 YOUR LOGO 金山办公软件有限公司

Layout Risk 05
The charging pile industry is an emerging industry and market acceptance is not
yet high. For the overall layout of the charging pile in each city is not as easy as
the traditional industry to carry out. In terms of the layout, we need to collect
the behavior of EV users in a certain area, build some models based on EV
charging, judge the distribution characteristics of charging piles during the
process of car driving, optimize the area, reasonably analyze the characteristics
of EV users, and build the corresponding database model.
risk assessment
matrix
PART / TWO

www.docer.com
part two YOUR LOGO 金山办公软件有限公司

ONE TWO

01 02
Layout Catch fire
When the BYD new energy charging pipes come into Short circuit comes as the primary cause for catching fires.
operation, the risks of layout is likely to appear, especially at Given the protection measures, fire are difficult to happen. But
the starting point. However, given the inevitable minor errors, once it happens, it can cause huge impacts on the equipment.
the likelihood is high. The errors in layout are easy to cause
operation problems which can be found by operators and
monitors.
我们团队 YOUR LOGO 金山办公软件有限公司

Things stolen Hardware failure Natural disaster


The devices in the pipes are of After operation, risks in hardware failure Among those risks, the hardest to detect is

great value so it may attract are inevitable because all devices have natural disaster which is totally dependent on

their own life circle. Once this failures the Earth movements. Taken its huge impacts
someone to steal them. If the
into consideration, it can destroy the whole
valuable part is missing, the occurs, it is quite easy for experienced
equipment instantaneously. So, in order to
operation can’t be smoothly and workers to identify the problematic points
prevent such disasters, most of equipment will
bring a stop to normal functions. and make targeted remedy measures as
be installed in safe areas to reduce the
soon as possible.
likelihood of occurrence.
YOUR LOGO 金山办公软件有限公司

FMEA
PART / THREE

analysis

www.docer.com
3. FMEA analysis
3. FMEA analysis
How do you handle each risk
2 、 Natural disaster risk
1 、 Fire risk
1. Evacuate and rescue personnel in time
1. Periodically inspect safety, prepare for uninterrupted patrol 2. Control the situation to further deteriorate
inspection, and quickly resolve any incidents. 3. Rescue important equipment
2. Upgrade safety systems and post warnings.  
3. Practice emergency drills.
4. Intervene quickly when the car is abnormal and let the driver drive
4 、 Hardware failure risk
away from the hazard. Call the fire alarm and battle fires early.
Emergency control on site prevents more harmful scenarios. 1. Fused charger. Inspection can change the charger or
power cord. Examine weak contact.
2. Damaged charging converter. Check or replace charger
resistance with a multimeter.
3 、 Layout risk
5 、 Theft risk
Distributed construction can save money, land, and time by
converting one charging station into numerous charging heaps. Theft risk
1. Install protection box
2. Lock the charging gun.