WTP Kelanis Project

Kapasitas 35 Liter/Detik
Selasa, 29 November 2022
GENERAL
INFORMATION
PROJECT OVERVIEW

Nama Proyek WTP Kelanis Project

Kapasitas 35 Lps
• Fresh Water 26.7 Lps
• Drink Water 7.6 Lps
Lokasi NKP Kelanis, Hauling Road KM 0 PT Adaro Indonesia,
Kalimantan Tengah
Owner PT ADARO TIRTA SARANA
Mata Uang Rupiah
Bahasa Penawaran Bahasa Indonesia
Jadwal Pelaksanaan Pekerjaan 7 Bulan (Preliminary)
Tipe Kontrak Lumpsump
Payment Turnkey (Pembayaran setelah selesainya pekerjaan)

3
PROJECT LOCATION

Lokasi NKP Kelanis, Hauling Road


KM 0 PT Adaro Indonesia,
Kalimantan Tengah

Jakarta Soekarno Hatta 


Banjarmasin Syamsudin Noor
2 Jam 10 Menit

Bandara Banjarmasin Syamsudin Noor


 Site Location
5 Jam 50 Menit

Lokasi WTP Opsi 1

Lokasi WTP Opsi 2

4
SCOPE OF WORKS
SITE OVERVIEW & WATER DEMAND
NKP
Adaro Logistics WTP Potential Location at NKP
[ FW 2,9 Lps + DW 0,7 Lps ]
A
L WTP Potential Location at AI

Production plant area – AI


[ FW 23,8 Lps ]

A
L

Non-production plant area - AI


Office, mess, laundry, canteen, public area
[ DW 7,8 Lps ]

6
WATER DISTRIBUTION SCHEMATIC

A
L

A
L

7
PRELIMINARY LAYOUT

WTP LAYOUT

SECTION VIEW

SECTION VIEW
8
SCOPE OF WORKS

No Item Owner Vendor Remarks


1 Input Design √
2 Detailed Design
a. Design Basis √
b. Design Calculation (major item) √
c. Specifications (general specifications) √
d. Drawing Civil, Mech, Elct&Ins, Piping √
(Layout, Cross & Long Section, Detail
Drawing, Architecture Drawing)
3 3D Design √ Overall view+rendering