LOM RESERVE – BNJM
Britmindo Version

BAS Version
Quantity All Potential Pits Pits

Quality All Potential Pits


Parameters:
• Project BNJM_0423_R2
• Coal Recovery : 100%
• Minimum coal thickness : 0.30 m
• Coal losses Thickness : 0.20 m
• No dilution applied
LOM RESERVE PIT CENTRAL 1 – Based on Coal Recovery

Note: It is necessary to determine coal recovery to set coal target


PRODUCTION PARAMETER
PRODUCTION PARAMETER
UNIT CAPACITY
PRODUCTION PLAN 2023
MINING SEQUENCE
Mining Sequence on 1 Area Mining Sequence on 2 Areas

A
A

Production Figure Schema 1 Based on coal recovery Production Figure Schema 2 Based on coal recovery
MINING SEQUENCE
Mining Sequence on 1 Area
Face Position Reserve EOY 2023 – Britmindo
Coal Reserve BAS based on GRID_EO2023_130423
(Britmindo)

Note:
• There is a difference in the number of waste and coal reserve between
BAS and Britmindo

Parameters:
• Project BNJM_0423_R2
• Minimum coal thickness : 0.30 m
• Coal losses Thickness : 0.20 m
• No dilution applied
DISPOSAL VOLUME AND DISTANCE
ESTIMATE
OPD Barat

2025 OPD CP 3

2025
IPD_Central_1_ST1
2026
2024
2025

2027

OPD (Area Udak)

OPD BN4
DISPOSAL IPD_Central_1_ST1

IPD_Central_1_ST1
• Disposal Volume : 4,824,605.46 LCM
• Overall slope : 27 degrees
• Dip Coal : 15 – 20 degrees
• Need support Geotech analysis
DISPOSAL VOLUME AND DISTANCE
ESTIMATE
INPIT DUMP SIMULATION – PIT CENTRAL 1
SETTLING POND
Catchment Area : 340 Ha

Plan Settling Pond


ISSUES

a a

b b

Issues:
• Constraint certainty of free land in the Disposal
Area (a) and Pit Highwall (b)