SCENARIO
The Mindanao segment of the Cotabato Trench has
moved and a 1-minute earthquake with a magnitude of 8.1
magnitude struck the municipality of Sultan Naga
Dimaporo, Lanao del Norte (SND, LDN). It is felt at
Intensity VII in SND, LDN, spawning a tsunami that
confounded the coastline of Sultan Naga Dimaporo, Lanao
del Norte.
There is no accurate assessment yet of the overall damages of the impact.
However, 1 hour after the impact the affected areas are summarized as follows:
❖ Landslides to roads portion of P-1, Brgy. Poblacion
❖ Damages to some portion of Municipal hall and residential buildings at
Purok 6 and Purok 8, Poblacion, SND.
❖ The pile of collapsed structure and debris blocked some doors at the old
municipal hall building.
❖ There is power and water interruption in the whole municipality and nearby
municipalities
❖ Connection through mobile and internet are disrupted
❖ Missing persons along the coastal areas
❖ Reported vehicular accident along the highway
❖ Fire incident at the old Municipal Hall
Mayor Motalib M. Dimaporo of SND, Lanao del
Norte immediately declared RED ALERT – the
Emergency Operations Center (EOC), the
Disaster Response Cluster and IMT were
activated. Local ERU was alerted to conduct
information gathering and render reports to the
Emergency Operations Center in all the phases
of calamity/disaster. The Lanao del Norte
provincial EOC also declared RED Alert Status
and monitors the affected municipalities.
• RDRRMC issued Regional Advisory declaring the RED ALERT
Status of the Regional Emergency Operations Center (EOC)
and advises the other provincial DRRMOs to be on Standby
Alert.
• Search and rescue efforts are on-going as reports of
employees trapped at Municipal Hall and at the PNP Police
Station. The Municipal Engineering Office is clearing main
roadways. Law enforcement is managing checkpoints at the
most heavily damaged areas. The BFP is asking people to
leave heavily affected areas and stay out of all buildings within
a 5-mile radius of the epicenter until structural engineers can
assess the damage and clear the buildings for occupancy.
• RDRRMC issued Regional Advisory declaring the RED
ALERT Status of the Regional Emergency Operations
Center (EOC) and advises the other provincial
DRRMOs to be on Standby Alert.
• Houses and businesses suffered moderate to major
damage. Parts of major highways and roadways, and
bridges require major repairs and debris removal. Many
households are still without potable water and power.
Thousand families are displaced from households and
shelter. Most schools and public buildings remain
closed at this time. Due to earthquake short circuit
cause fire incident at SND Municipal Hall.
MECHANICS OF THE DRILL
• 1 minute alarm
 Signals the occurrence of the “main quake”
(start of the drill)
 All Municipal employees and residents to seek shelter
and protect themselves wherever they are situated
 Municipal employees and residents to perform “duck,
cover and hold” under desks, tables and chairs and
remain in such position until the “shaking” stops.
MECHANICS OF THE DRILL
 Evacuation of employees from the municipal hall/houses to the designated
evacuation/assembly areas using pre-determined routes

 Disaster Control Group to effect a fast but safe and orderly


evacuation

 Evacuation must be buddy-buddy system

 Evacuees should not run nor walk casually and should walk faster than
normal

 Evacuees must utilize the shortest but safest route to the


evacuation/assembly area
PHIVOLCS issued Tsunami Warning

5 minutes after the quake hits SND, PHIVOLCS issued Tsunami Warning to the
municipality
Evacuation of employees from the municipal hall/houses to the designated
evacuation/assembly areas using pre-determined routes
10 minutes after the quake, Tsunami waves hits the municipality
The DCG to check their bodies for any sustained injury and must do head counting
Extrication of the victims inside the Municipal Hall
IC recommends for activation of PSCP
Barangay coordinate/report to the Municipality
After Occurrence of AFTERSHOCK

The evacuation process completed


 Employees and other residents assembled at the designated evacuation
area/s
 The DCG to check their bodies for any sustained injury and must do head
counting
Extrication of the victims inside the Municipal Hall
CC Management at the Evacuation Center
Barangay coordinate/report and turn over of the ICP to the Municipality
Activation of IMT and EOC

Mayor declares Red Alert Status in the


municipality
Activation of IMT and EOC
 Resumption of MEFs by the Municipality
 OS Personnel establish comms
Response Cluster Activation
MDRRMO SND EOC endorse to response cluster for the activation:
• SRR
• ETC
• HEALTH
• Logistics
• CCCM
• IDPP
• FNFI
MDRRMO Situation/Progress report
SND EOC to IMT Response Ops
Augmentation of Resources from neighboring LGUs
o Scenarios (AMP, Vehicular, High Angle Rescue, Collapsed structure)

MDRRMO EOC submits reports to Provincial then Provincial to Regional


Demob

Demobilization
 Feedbacking and Evaluation
Sultan Naga Dimaporo Earthquake/Tsunami
Sultan Naga Dimaporo Earthquake/Tsunami
Lists of responding LGU/Agency:
RESPONDING LGU NUMBER OF TEAM/s SCENARIO ASSIGNMENT
PDRRMO 1 team Vehicular Incident Scenario
Kapatagan MDRRMO 1 team
Tubod MDRRMO 1 team USAR (Collapsed Structure)
Kolambugan MDRRMO 1 team High Angle Rescue Scenario
Sapad MDRRMO 1 team (7 man) + 1 driver + 1 WASAR Scenario
documenter + Mam Zenai = 10 pax
SND MDRRMO 1 team (9 man) + 1 rescue boat Evacuation/Extrication (0910H)
operator
BFP 1 team (7 man) Fire Suppression Scenario
PNP 1 team (8 man) Security/Traffic
55th Mech 1 team USAR (Collapsed Structure)
LGU RDANA 1 team
LGU PSCP DCG Per PSCP (Attached)
DOH 6 pax Advanced Medical Post
Evac Center 11 pax (MSWDO-6, RHU- 5) Evac Center
IMT 8 pax LGU (ICS) ICP
List of Scenario with corresponding patient/victims: (FOR
MHO/AMP Personnel only)
SCENARIO NUMBER OF VICTIMS/PATIENTS SUGGESTED TRIAGE SCENARIO

Vehicular Incident 6 pax 3 red tag


2 yellow
2 green
1 black

WaSaR 6 pax 3 red

High Angle Rescue Scenario 2 pax + 4 (municipal building) 1 red


1 yellow

Fire Suppression Scenario none

USAR (Collapsed Structure) 5 pax 2 red


2 yellow
1 green

Evacuation Drill 100 pax (brgy residents)


90 (lgu employees)