This document provides an inventory and cost analysis of tools, machines, materials, and labor needed for three repair stations. It lists specific tools like impact wrenches, sockets, and torque wrenches. It also details the workspace requirements like lighting, temperature, and noise standards to ensure safety. The document calculates the workspace area for each station to determine costs.
This document provides an inventory and cost analysis of tools, machines, materials, and labor needed for three repair stations. It lists specific tools like impact wrenches, sockets, and torque wrenches. It also details the workspace requirements like lighting, temperature, and noise standards to ensure safety. The document calculates the workspace area for each station to determine costs.
This document provides an inventory and cost analysis of tools, machines, materials, and labor needed for three repair stations. It lists specific tools like impact wrenches, sockets, and torque wrenches. It also details the workspace requirements like lighting, temperature, and noise standards to ensure safety. The document calculates the workspace area for each station to determine costs.
Identifikasi [ 4M 1E] - St 2 RH (0410, M Thomas Zidan) Man - St 3 RH 1 (0424, M Aditya Nugraha) - St 3 RH 2 (2197, Abdul Rahmat) - Makita DTW 180 - Manuver operator - Deep sock 10 Methode - Cara pemasangan wiring , piping - Deep sock 12 - Impact wrench uryu UW202 - Sock 27 x 19,5 - Torque 2800 QL3 (41. Radius Rod 2500 Kgf.cm) - Sock 27 x 12,5 - Bar sock 12,5 x 15 - Bako bento (6 skat) - Mangkok magnet - Frame - Hoist angin (install gear box) - Gearbox - Impact wrench uryu UW-131ER - Bracket bumper Material - Sock 27 x 12,5 - Pipe - Torque (22. Power Steering 900 Kgf.cm) - Kabel select - Torque 4200 QL2 (25. Gear Box 2700 Kgf.cm) - Bolt & Nut Machine / Tools - Deep sock 27 x 12,5 - Bar sock 12,5 x 15 - Torque 5500 QLE2 (24. Pit man Arm 4200 Kgf.cm) - sock 32 x 19,5 - Torque SP 120Nx22 (21. Pipa Brake Air 950 Kgf.cm) - Luas area kerja station 2 : - Kunci pas 27 P = 6,77 M x L = 1,83 M - Torque (23. Conector Clutch 330 Kgf.cm) - Luas area kerja station 3 : - Box Kitting P = 6,77 M x L = 1,24 M - Impact wrench shut off modifikasi uryu UOW 11.10 (install bracket bumper R/L) - Working Deck - Impact wrench shut off uryu UOW 11.10 (install pipe) - Kipas angin - Spidol merah (Red Mark) Environment - Blower - Bako bento (6 skat) + 1 skat modifikasi - Lampu atau standard keselamatan penerangan area kerja (Lux) - Makita DTW 180 - Suhu (Temperature) standard keselamatan - Deep sock 12 x 9,5 area kerja ( derajat Celsius ) - Kunci pas 10-12 - Kebisingan atau standard keselamatan tingkat - Deep sock 10 x 9,5 suara area kerja ( dB)