SOP 10/18 BVH1 ROADMAP ECOTECH
HW changes Kimball proposal: cap/diode supplier change:
- Battery filtering (ignition interface)
- Ground decoupling near mounting holes
- CAN driver supply filtering
Current sense
Can Choke - Diode on PS Mosfet T1/T2 capacitor amplifier supplier
decontenting change to TI
3
BVH1 ROADMAP ECOTECH
SOP 10/18
HW changes
Changes:
– CH#1 Lower capacitance of bulk cap EPCOS
3200µF i.o. 3800µF (based on current simulation)
– CH#2 FET change (Trial testing on going, Topic started in MAR17)
Toshiba FETs i.o NXP (See land pattern diff. Toshiba in blue)
Minor Land pattern adaption on CCA
4
BVH1 ROADMAP ECOTECH
SOP 10/18
White Gap Filler removal
Change:
– WGF allows heat dissipation between components (in yellow on picture below)
& Controller cover. Change aims at removing it where temperature margin is
sufficient
– Impact on Nexteer process only, for WGF dispensing
5
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#7: Lock Washer material supplier
Rational:
– Improve reactivity to order increases
Change:
– Change raw material supplier (Nexteer Tier 2)
– Same material & Properties
– Systems ready for test « Fastening tabs (TS30) »
6
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#8: Commonize Boot with CMP
Rational:
– Simplify process by using same boot for CMP & BMPV project
Change:
– Use CMP boots design.
– Convolute design slightly different
– Interface between rack boot and rack housing is identical, Tie Rods as well?
– Packaging study (center & EOT)
– Validated by CMP during DV3 with Lot D, Lot M, & Lot P of DVP&R
7
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#9: Bearing ressourcing
Change:
– Choose different bearing supplier (See presentation aside)
– PV level parts about to start testing
170720_PSA_prez_
BMPV_Bearing Supplier cha
8
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#10: Upper rotor with welded stacks (WIPM)
Change:
– Eliminate plastic over molding process and changed to laser welding
– Magnet are captured in pocket by reducing the size of the window on both ends
– Reduced processing and handling to improve quality
– PPAP samples available
– Potential process impacts under investigation
9
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#11 Localize Gen V T-bar
Change:
– T-bar is currently produce in US at Nexteer.
– Change aims at producing locally in Europe or internally
10
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#11 Motor VA/VE
11
BVH1 ROADMAP ECOTECH
SOP 10/18
Impact Summary
PVP&R Ecotech
BVH1 SOP1018
12
BVH1 ROADMAP ECOTECH
OCT 2018 introduction : Timing
Technical assessment
complete by end Jan18
– Thermal/EMC with new CBOM
– Endurance/NVH with new bearing
– Steering Feel impact assessment
for Toshiba FET (timing plan does
not include re-tuning)
Early kick-off of changes
– by Mid-Nov to hit PV complete
4months prior to SOP
13
BVH1 ROADMAP ECOTECH
OCT 2018 introduction : Timing
PV Plan
– Electrical only
Need to be in Saginaw
– Steering feel none-regression test
to conduct with customer
Customer status
– No official status yet, no pre-
series deliveries agreed upon
– Need to get « buy-in » for PV
completion SOP-4m
rule is SOP-6m
– Need joint Sales / Engineering
discussion to tie this with 2018
Performance plan
14
BVH1 ROADMAP ECOTECH
OCT 2019 & beyond introduction
Motor localized in
Europe
Turns counter
WGF removal
Crimped / glued
cover and removed
CCA screws
15
BVH1 ROADMAP ECOTECH
SOP 10/19
Motor Localisation & WGF removal
16
SOP 10/19 BVH1 ROADMAP ECOTECH
CH#1: Simplified worm shaft damping
17
BVH1 ROADMAP ECOTECH
SOP10/19
CH#2: Solid Motor coupling
CH#2: Motor Coupling:
– CH#2.2 Solid plastic coupler new design
Derived from flex coupler design
Axial length reduction
Mass/inertia reduction
Simplified mold
18
BVH1 ROADMAP ECOTECH
SOP 10/19
CH#3: PHA FR4 Step 2
Change:
– CH#3.1 Removal of plastic housing
– CH#3.2 Flat PCB with step near Lower Rotor area
Thickness of 1.6mm with step at 0.55mm
– CH#3.3 Header soldered on PCB
– CH#3.4 PHA harness length
– CH#3.5 Assist Mech housing pedestal higher
to accomodate removal of plastic housing
– CH#3.6 Sensor cover bump to accomodate Header
No interface with AM change
19
BVH1 ROADMAP ECOTECH
Roadmap
20
BVH1 ROADMAP ECOTECH
SOP10/19
Impact Summary
PVP&R Ecotech
BVH1 SOP1019
21
BVH1 ROADMAP ECOTECH
OCT 2019 introduction : Timing
22
BVH1 ROADMAP ECOTECH
OCT 2019 introduction : Timing
Launch
DV planning
– Need to k-o DV suppliers before
technical assessment is complete
– Target is to assemble DV systems, on
Tychy production line, in April-18
PV planning
– Need to kick-off production tooling
(AsmMech housing, motor and sensor
cover primarly) based on technical risk
assessment
Customer status
– No official status yet, no pre-series
deliveries agreed upon
– Need to get « buy-in » for PV completion
SOP-4m
rule is SOP-6m
– Need joint Sales / Engineering
discussion to tie this with 2018
Performance plan
23