BVH1 ROADMAP ECOTECH

Sept 15th, 2017

1 Copyright 2017, Nexteer Automotive Corporation. All rights reserved.


BVH1 ROADMAP ECOTECH
OCT 2018 introduction
Gen5 Tbar
Upper shaft &
Pinion adaption
for gen5 Tbar T1/T2 decontenting
CAN Comon mode choke
removal
Bearing Toshiba FETs
ressourcing Taigene VA/VE
Ti Amplifier
EPCOS Cap
Kimball VA/VE consolidated

WIPM Upper
Rotor

WGF reduction

Commonize Boot
with CMP
Washer mat
supplier

2
SOP 10/18 BVH1 ROADMAP ECOTECH
HW changes Kimball proposal: cap/diode supplier change:
- Battery filtering (ignition interface)
- Ground decoupling near mounting holes
- CAN driver supply filtering
Current sense
Can Choke - Diode on PS Mosfet T1/T2 capacitor amplifier supplier
decontenting change to TI

Bulk cap Supplier FETs


value change to
change Toshiba

3
BVH1 ROADMAP ECOTECH
SOP 10/18
HW changes
 Changes:
– CH#1 Lower capacitance of bulk cap EPCOS
 3200µF i.o. 3800µF (based on current simulation)
– CH#2 FET change (Trial testing on going, Topic started in MAR17)
 Toshiba FETs i.o NXP (See land pattern diff. Toshiba in blue)
 Minor Land pattern adaption on CCA

– CH#3 EMC Filtering optimisation


 CH#3.1 T1/T2 Torque sensor signal filtering capacitor removal (2 nd order contributor to IR01 issue, 1st order: PGF)
 CH#3.2 CAN choke removal (deviation possibility already under investigation)
– CH#4 Kimbal proposals (Cap 1µF, 10µF & diode supplier change to Murata/NXP, same datasheet)
– CH#5 Current sense amplifier supplier change to TI, same datasheet)

4
BVH1 ROADMAP ECOTECH
SOP 10/18
White Gap Filler removal

 CH#6: Optimize quantity of White Gap Filler

 Change:
– WGF allows heat dissipation between components (in yellow on picture below)
& Controller cover. Change aims at removing it where temperature margin is
sufficient
– Impact on Nexteer process only, for WGF dispensing

5
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#7: Lock Washer material supplier

 Rational:
– Improve reactivity to order increases

 Change:
– Change raw material supplier (Nexteer Tier 2)
– Same material & Properties
– Systems ready for test « Fastening tabs (TS30) »

6
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#8: Commonize Boot with CMP

 Rational:
– Simplify process by using same boot for CMP & BMPV project

 Change:
– Use CMP boots design.
– Convolute design slightly different
– Interface between rack boot and rack housing is identical, Tie Rods as well?
– Packaging study (center & EOT)
– Validated by CMP during DV3 with Lot D, Lot M, & Lot P of DVP&R

7
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#9: Bearing ressourcing

 Change:
– Choose different bearing supplier (See presentation aside)
– PV level parts about to start testing

170720_PSA_prez_
BMPV_Bearing Supplier cha

8
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#10: Upper rotor with welded stacks (WIPM)

 Change:
– Eliminate plastic over molding process and changed to laser welding
– Magnet are captured in pocket by reducing the size of the window on both ends
– Reduced processing and handling to improve quality
– PPAP samples available
– Potential process impacts under investigation

9
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#11 Localize Gen V T-bar

 Change:
– T-bar is currently produce in US at Nexteer.
– Change aims at producing locally in Europe or internally

– CH#11.1 Improve Gen V process i.o. using Gen VI


– CH#11.2 Potential update on Upper shaft needed
– CH#11.3 Potential update on Pinion needed

– Full PPAP & Component level testing

10
BVH1 ROADMAP ECOTECH
SOP 10/18
CH#11 Motor VA/VE

 CH#11.1 Motor Housing mold update to remove


pedestal (in red) where PGF was removed earlier

 CH#11.2 Motor Housing mold update to


suppress machining operation for surface in
red.

11
BVH1 ROADMAP ECOTECH
SOP 10/18
Impact Summary

PVP&R Ecotech
BVH1 SOP1018

12
BVH1 ROADMAP ECOTECH
OCT 2018 introduction : Timing

 Technical assessment
complete by end Jan18
– Thermal/EMC with new CBOM
– Endurance/NVH with new bearing
– Steering Feel impact assessment
for Toshiba FET (timing plan does
not include re-tuning)
 Early kick-off of changes
– by Mid-Nov to hit PV complete
4months prior to SOP

13
BVH1 ROADMAP ECOTECH
OCT 2018 introduction : Timing

 PV Plan
– Electrical only
 Need to be in Saginaw
– Steering feel none-regression test
to conduct with customer
 Customer status
– No official status yet, no pre-
series deliveries agreed upon
– Need to get « buy-in » for PV
completion SOP-4m
 rule is SOP-6m
– Need joint Sales / Engineering
discussion to tie this with 2018
Performance plan

14
BVH1 ROADMAP ECOTECH
OCT 2019 & beyond introduction

Lower Rotor with FR4 PHA, with no


stamped steel plastic support
cores

Motor localized in
Europe
Turns counter

Assist Mech housing


and cover changed to
accomodate other
changes

WGF removal

Crimped / glued
cover and removed
CCA screws

Wangin tie rod Non Isolated worm axis


(6) Non Isolated
investigations
worm axis
Solid coupler

15
BVH1 ROADMAP ECOTECH
SOP 10/19
Motor Localisation & WGF removal

 CH#1 Motor Localisation :


– Localize Motor production in Europe to improve logistics
– RFQ on going with suppliers
– No change of specification
– Impact on Calibration & tuning

 CH#2 WGF removal


– Investigate if complete removal possible with new motor

16
SOP 10/19 BVH1 ROADMAP ECOTECH
CH#1: Simplified worm shaft damping

 CH#1: Fixed worm  CH#1 bis: Single Isolated bearing


– CH#1.1 Isolators removed – CH#1.1 Isolators removed
– CH#1.2 Worm shaft length & geometry – CH#1.2 Worm shaft length & geometry
– CH#1.3 One out of 2 Bearings reduced from 32mm to 24 – CH#1.2 One out of 2 Bearings reduced from 32mm to 24
– CH#1.4 Beveled snap ring – CH#1.3 Beveled snap ring + External snap ring
– CH#1.5 Compressed O-ring on 24mm bearing side – CH#1.4 Compressed Elastomer between Inner & outer washer
– CH#1.6 Assist Mech housing change on 32mm bearing side
to accommodate reduced worm shaft length – CH#1.5 Assist Mech housing change
to accommodate reduced worm shaft length

17
BVH1 ROADMAP ECOTECH
SOP10/19
CH#2: Solid Motor coupling
 CH#2: Motor Coupling:
– CH#2.2 Solid plastic coupler new design
 Derived from flex coupler design
 Axial length reduction
 Mass/inertia reduction
 Simplified mold

18
BVH1 ROADMAP ECOTECH
SOP 10/19
CH#3: PHA FR4 Step 2
 Change:
– CH#3.1 Removal of plastic housing
– CH#3.2 Flat PCB with step near Lower Rotor area
 Thickness of 1.6mm with step at 0.55mm
– CH#3.3 Header soldered on PCB
– CH#3.4 PHA harness length
– CH#3.5 Assist Mech housing pedestal higher
to accomodate removal of plastic housing
– CH#3.6 Sensor cover bump to accomodate Header
 No interface with AM change

– DEV systems ready


– Thermal shock, vibration, EMC

19
BVH1 ROADMAP ECOTECH
Roadmap

 At concept stage or to be implemented after 10/19:


– Stamped Lower Rotor
 Replace powder metal cores by stamped steel

– Turns counter if PSA interested

– Alternative Tie Rods supplier

– CCA fixation with fewer screws


 Remove CCA holes
 Upgrade Motor housing mold
 Epoxy glue

– Crimped/glued CCA cover

20
BVH1 ROADMAP ECOTECH
SOP10/19
Impact Summary

PVP&R Ecotech
BVH1 SOP1019

21
BVH1 ROADMAP ECOTECH
OCT 2019 introduction : Timing

Technical risk assessment


 Motor DV
– Pre-select motor supplier by Mid-Oct17
– Complete component level technical
assessment by April-18
 Components
– « Last call » for drop-in technical
changes for PV built end March-18
 Worm shaft line
– Choice between SIB, fixed or … carry-
over by year’s end 17

22
BVH1 ROADMAP ECOTECH
OCT 2019 introduction : Timing

Launch
 DV planning
– Need to k-o DV suppliers before
technical assessment is complete
– Target is to assemble DV systems, on
Tychy production line, in April-18
 PV planning
– Need to kick-off production tooling
(AsmMech housing, motor and sensor
cover primarly) based on technical risk
assessment
 Customer status
– No official status yet, no pre-series
deliveries agreed upon
– Need to get « buy-in » for PV completion
SOP-4m
 rule is SOP-6m
– Need joint Sales / Engineering
discussion to tie this with 2018
Performance plan

23