at Jakarta Bandung High Speed Railway Project (Period : Jun 9 th – August 31st)
Data Korban Dampak Terhadap Korban Kronologis Kejadian
Perkiraan Kerugian
Tanggal &
No. Bagian
Waktu Jenis Tingkat Penanganan Tindakan Kronologis/Ur
Urut Nama Tubuh Lokasi Kondisi Yang Sumber Tipe Material Jam Kerja
Kejadian Kontraktor TKI/TKA Kelamin Umur Keparahan Diagnosa (P3K/Rujuk Yang aian Singkat
Korban Yang Kejadian Berbahaya* Kecelakaan* Kecelakaan* (Rp)* Hilang*
(L/P) (LR/LB/M) RS) Berbahaya* Kecelakaan
Cedera*
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
10
dst
Catatan:
* Disesuaikan dengan Lampiran I SK Dirjen Binawasker * untuk Accident harus dicatat perkiraan kerugian
Nomor : KEP.84/BW/1998, Tanggal 8 April 1998
Tentang : Juklak Pengisian dan Penggunaan Formulir Pemeriksaan dan Pengkajian serta Analisis Statistik Kecelakaan
Safety Statistics
at Jakarta Bandung High Speed Railway Project (Period : Jun 9th – August 31st)
No Member
Workers Month
Local Foreign Total No. Work Accident Type Total
from Jun 9th July Augt
1 KCIC 100 27 127
HSRCC 1 C1: Knocked (generally shows contact or contact with sharp objects or hard 0 0 0 0
1 CM 29 25 54 objects that result in scratches, cuts, punctures, etc.).
2 WIKA 231 - 231 2 C2: Hit (generally because of falling, sliding, flying, moving, etc.). 0 0 0 0
3 Sinohydro 403 312 715
3 C3: Caught in, inside and between objects (pinched, bitten, buried, 0 0 0 0
4 CRIC - - -
5 CRRC - - -
drowned, etc.).
6 CREC 145 119 264 4 C4: Fall from the same height. 0 0 0 0
7 CRSC - - - 5 C5: Fall from different heights. 0 0 0 0
8 CRDC 16 24 40 6 C6: Slipping. 0 0 0 0
924 507 1,431
7 C7: Exposure (generally related to temperature, air pressure, vibration, 0 0 0 0
radiation, sound, light, etc.).
8 C8: Suction, absorption (shows the process of entry of harmful substances 0 0 0 0
or substances into the body, either through breathing or skin and which
generally results in shortness of breath, poisoning, suffocation, etc.).
9 C9: Touched by electricity. 0 0 0 0
10 C10: And others. 0 0 0 0
Jumlah 0 0 0 0
Catatan:
* Disesuaikan dengan Lampiran I SK Dirjen Binawasker
Nomor : KEP.84/BW/1998, Tanggal 8 April 1998
Tentang : Juklak Pengisian dan Penggunaan Formulir Pemeriksaan dan Pengkajian serta Analisis Statistik Kecelakaan
Safety Statistics
at Jakarta Bandung High Speed Railway Project (Period : Jun 9th – August 31st)
Frequency Rate = (Number of injuries with lost work time x 1,000,000) / Total person-hours Worked
= (0 times x 1.000.000) / 641.088 hours
= 0 times
Safety Statistics
at Jakarta Bandung High Speed Railway Project (Period : Jun 9th – August 31st)
Severity Rate = (Total working days lost x 1,000,000) / Total Person-hours Worked
= (0 days x 1.000.000) / 641.088 hours
= 0 days
The severity rate of 0 indicates that during the period (Jun 9th, 2018 – Sept 1st, 2018) it means in that year
there has been a loss of work time of 0 days per million work hours of worker
3. Incidence Rate
Incidence rate is used to inform us about the percentage of the number of accidents that occur at work